Skip to main content
PermitBase

Plumbing Permit in Parker, Colorado

Required for plumbing alterations and upgrades in Parker, governed by the International Plumbing Code (2024 IPC effective June 30, 2026). Parker uses the IPC, not the Uniform Plumbing Code.

Verified 2026-07-05 · Source

When you need this permit

  • Permits are required for electric and plumbing alterations and upgrades
  • Water heater installation/replacement requires a permit
  • Applications submitted through the Town's eTRAKiT system
  • Water conditioner (softener) installations require a State Plumbing Board application in addition to the Town permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building/Trade Permit Fee — total valuation $1.00 to $500.00No plumbing-specific flat-fee table was found published; the Town's general Fee Valuation Schedule (effective June 15, 2020) is the confirmed governing fee structure for trade permits not otherwise itemized
$23.50
Plan Review FeeTown of Parker Fee Valuation Schedule, effective June 15, 2020
65% of the Building Permit Fee
Re-inspection FeeTown of Parker Fee Valuation Schedule, effective June 15, 2020
$75.00

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Parker?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Rough-In

    Before concealment — pipe slope, materials, cleanouts

  2. 2

    Final

    Fixtures connected, no leaks, proper venting verified

See the full Parker inspection guide — scheduling & re-inspection fees →

Tips

  • Parker enforces the International Plumbing Code (IPC), not the Uniform Plumbing Code (UPC) used by some other Colorado jurisdictions.
  • A water softener/conditioner installation needs BOTH a Town permit and a separate State Plumbing Board application — budget time for both.

Frequently asked questions

Parker requires a plumbing permit for: Permits are required for electric and plumbing alterations and upgrades; Water heater installation/replacement requires a permit; Applications submitted through the Town's eTRAKiT system; Water conditioner (softener) installations require a State Plumbing Board application in addition to the Town permit. If your project isn't listed, confirm with Town of Parker Building Division (Community Development Department) at 303-841-1970 before starting work.

In Parker, the published Building/Trade Permit Fee — total valuation $1.00 to $500.00 is: $23.50. Additional published fees: Plan Review Fee — 65% of the Building Permit Fee; Re-inspection Fee — $75.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Parker does not publish a plan-review timeline for this permit. Contact Town of Parker Building Division (Community Development Department) at 303-841-1970 for current turnaround.

You'll need: Plumbing Permit Application (eTRAKiT). Depending on your project, Parker may also ask for: Water Conditioner Install State Plumbing Board Application. See the required-documents checklist on this page for details on each.

Parker requires 2 inspection(s) for a plumbing permit, in order: Underground/Rough-In, Final. Schedule each through Town of Parker Building Division (Community Development Department) (303-841-1970).

Apply through Town of Parker Building Division (Community Development Department) at 20120 E. Mainstreet, Parker, CO 80138. Phone: 303-841-1970, email: building@parkerco.gov. Office hours: Monday-Friday, 8 a.m.-5 p.m. Inspection requests called in prior to 4 p.m. are performed the following business day; roofing inspections occur 8 a.m.-12 p.m., no same-day requests.. Official information: https://www.parkerco.gov/114/Building-Division.

Parker, Colorado has adopted: Town of Parker is in transition: full enforcement of the 2024 International Codes begins June 30, 2026, in conjunction with the Colorado Model Electric Ready and Solar Ready Code. Source: Town of Parker Building Codes page, https://www.parkerco.gov/445/Building-Codes; 2024 International Building Code (IBC) — effective June 30, 2026; 2024 International Residential Code (IRC) — effective June 30, 2026; 2024 International Plumbing Code (IPC) — effective June 30, 2026 (note: Parker uses the IPC, not the Uniform Plumbing Code); 2024 International Mechanical Code (IMC) — effective June 30, 2026; 2024 International Fuel Gas Code (IFGC) — effective June 30, 2026; 2024 International Fire Code — effective June 30, 2026; 2024 International Energy Conservation Code (IECC) — effective June 30, 2026; 2024 International Existing Building Code — effective June 30, 2026; 2024 Non-Residential Property Maintenance Code — effective June 30, 2026; 2024 International Swimming Pool and Spa Code — effective June 30, 2026; Parker Administrative Code (2024 edition, local amendments to the above) — effective June 30, 2026; 2025 Colorado Wildfire Resiliency Code (CWRC) — adopted per Town of Parker Building Codes page; 2025 Colorado Model Electric Ready and Solar Ready Code — adopted alongside the 2024 I-Codes; 2023 National Electrical Code (NEC) remains in effect through December 31, 2026; the 2026 NEC takes effect January 1, 2027. Source: Town of Parker Building Codes page, https://www.parkerco.gov/445/Building-Codes; Roofing-specific current code reference (per the Town's own Re-Roofing Requirements handout, revised 3/14/2025, which predates the 2024 I-Code transition): 2021 IRC (Residential) and 2021 IBC (Commercial and Multi-Family). Source: https://www.parkerco.gov/DocumentCenter/View/738; Colorado has no statewide mandatory building code for most jurisdictions (home-rule authority). Parker's own adopted codes, amendments, and effective dates as listed above are the governing figures; always confirm current status directly with the Building Division given the June 30, 2026 code-transition date. Source: Colorado Energy Office, Building Energy Codes Toolkit, https://energyoffice.colorado.gov/building-energy-codes-toolkit. Local amendments apply — see the Parker overview page for the full list.

Parker enforces the International Plumbing Code (IPC) — the 2024 edition takes full effect June 30, 2026 alongside the rest of the 2024 I-Code suite.

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Parker building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.