Skip to main content
PermitBase

Sign Permit in Parker, Colorado

Chapter 13.09 (Sign Code) of the Town's Land Development Ordinance requires a Sign Permit for construction or installation of most permanent signs in the Town of Parker, per LDO Sec. 13.09.020(f)(1). Applications are reviewed by the Community Development Department under the administrative procedures set out in LDO Sec. 13.03.040(o), Sign permit or temporary sign registration. Temporary signs use a separate registration process rather than a permit.

Verified 2026-08-14 · Source

When you need this permit

  • A Sign Permit is required for construction or installation of all permanent signs allowed under Chapter 13.09, unless otherwise exempted; a new Sign Permit is also required for any change to a sign's location, size, shape, or other characteristic (except its message), per LDO Sec. 13.09.020(f)(1)
  • Temporary signs must instead be registered with the Community Development Department prior to display (an electronic registry, not a permit); registration is not required between October 1 and November 15 each calendar year, per LDO Sec. 13.03.040(o)(2)a
  • Exemptions from Sign Permit/registration include signs smaller than 2 sq ft on a residential parcel, window signs under 6 sq ft, signs not legible from any right-of-way or adjacent property, on-premises athletic field/scoreboard signs, and other categories listed in LDO Sec. 13.09.020(c)
  • Because of the potential hazard to the public from poorly constructed or installed signs, all permanent signs are inspected by the Building Division, per LDO Sec. 13.03.040(o)(2)b
  • Sign construction, erection, safety, and maintenance must comply with all Town building regulations, including Building Permit requirements where necessary; electric signs and permanent signs involving structural requirements of the building code may be installed, repaired, altered, or serviced only by a licensed contractor, per LDO Sec. 13.09.030(c)(1) Contractor
  • A general LDO provision (13.03.040(o)(2)c) requires a decision within 60 days only where federal or state law mandates a decision within a stated period — this is a narrow trigger, not a general Sign Permit turnaround guarantee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Sign Permit Fee — NewTown of Parker Development-Related User Fee Schedule (Community Development — Planning Division), effective January 1, 2025, 'Sign Permit / New' line item. The Sign Permits page separately confirms a non-refundable application fee is charged before review begins.
$91
Planned Sign ProgramTown of Parker Development-Related User Fee Schedule, effective January 1, 2025. Required to make certain freestanding/temporary signs permanent or to vary standards under LDO Sec. 13.03.040(l)
$248
Planned Sign Program AmendmentTown of Parker Development-Related User Fee Schedule, effective January 1, 2025
$248

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Parker?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sign Installation Inspection

    All permanent signs are inspected by the Building Division because of the potential hazard to the public from poorly constructed or installed signs, per LDO Sec. 13.03.040(o)(2)b

See the full Parker inspection guide — scheduling & re-inspection fees →

Tips

  • Modifying an existing sign's location, size, or shape triggers a NEW Sign Permit under LDO Sec. 13.09.020(f)(1) — only a message change (e.g., swapping a panel in a multi-tenant monument sign) is exempt from re-permitting.
  • Temporary signs (banners, sandwich boards, temporary freestanding signs) go through Registration, not a Sign Permit, and registration is waived entirely between October 1 and November 15 each year — but the signs must still meet all Chapter 13.09 dimensional and duration standards.
  • Electric signs and any sign involving the building code's structural requirements must be installed, repaired, altered, or serviced by a licensed contractor — confirm your sign contractor holds the Town's required registration before applying. Contractor

Frequently asked questions

Parker requires a sign permit for: A Sign Permit is required for construction or installation of all permanent signs allowed under Chapter 13.09, unless otherwise exempted; a new Sign Permit is also required for any change to a sign's location, size, shape, or other characteristic (except its message), per LDO Sec. 13.09.020(f)(1); Temporary signs must instead be registered with the Community Development Department prior to display (an electronic registry, not a permit); registration is not required between October 1 and November 15 each calendar year, per LDO Sec. 13.03.040(o)(2)a; Exemptions from Sign Permit/registration include signs smaller than 2 sq ft on a residential parcel, window signs under 6 sq ft, signs not legible from any right-of-way or adjacent property, on-premises athletic field/scoreboard signs, and other categories listed in LDO Sec. 13.09.020(c); Because of the potential hazard to the public from poorly constructed or installed signs, all permanent signs are inspected by the Building Division, per LDO Sec. 13.03.040(o)(2)b; Sign construction, erection, safety, and maintenance must comply with all Town building regulations, including Building Permit requirements where necessary; electric signs and permanent signs involving structural requirements of the building code may be installed, repaired, altered, or serviced only by a licensed contractor, per LDO Sec. 13.09.030(c)(1); A general LDO provision (13.03.040(o)(2)c) requires a decision within 60 days only where federal or state law mandates a decision within a stated period — this is a narrow trigger, not a general Sign Permit turnaround guarantee. If your project isn't listed, confirm with Town of Parker Building Division (Community Development Department) at 303-841-1970 before starting work.

$91 for a new permanent Sign Permit, per the Town's Development-Related User Fee Schedule effective January 1, 2025. A Planned Sign Program or Planned Sign Program Amendment (used for certain permanent/varied sign approvals) is $248 each.

Parker does not publish a plan-review timeline for this permit. Contact Town of Parker Building Division (Community Development Department) at 303-841-1970 for current turnaround.

You'll need: Sign Permit Application (eTRAKiT). Depending on your project, Parker may also ask for: Sign-type informational packet (Freestanding, Wall, Window, Sandwich Board, or Temporary Banner). See the required-documents checklist on this page for details on each.

Parker requires 1 inspection(s) for a sign permit, in order: Sign Installation Inspection. Schedule each through Town of Parker Building Division (Community Development Department) (303-841-1970).

Apply through Town of Parker Building Division (Community Development Department) at 20120 E. Mainstreet, Parker, CO 80138. Phone: 303-841-1970, email: building@parkerco.gov. Office hours: Monday-Friday, 8 a.m.-5 p.m. Inspection requests called in prior to 4 p.m. are performed the following business day; roofing inspections occur 8 a.m.-12 p.m., no same-day requests.. Official information: https://www.parkerco.gov/114/Building-Division.

Parker, Colorado has adopted: Town of Parker is in transition: full enforcement of the 2024 International Codes begins June 30, 2026, in conjunction with the Colorado Model Electric Ready and Solar Ready Code. Source: Town of Parker Building Codes page, https://www.parkerco.gov/445/Building-Codes; 2024 International Building Code (IBC) — effective June 30, 2026; 2024 International Residential Code (IRC) — effective June 30, 2026; 2024 International Plumbing Code (IPC) — effective June 30, 2026 (note: Parker uses the IPC, not the Uniform Plumbing Code); 2024 International Mechanical Code (IMC) — effective June 30, 2026; 2024 International Fuel Gas Code (IFGC) — effective June 30, 2026; 2024 International Fire Code — effective June 30, 2026; 2024 International Energy Conservation Code (IECC) — effective June 30, 2026; 2024 International Existing Building Code — effective June 30, 2026; 2024 Non-Residential Property Maintenance Code — effective June 30, 2026; 2024 International Swimming Pool and Spa Code — effective June 30, 2026; Parker Administrative Code (2024 edition, local amendments to the above) — effective June 30, 2026; 2025 Colorado Wildfire Resiliency Code (CWRC) — adopted per Town of Parker Building Codes page; 2025 Colorado Model Electric Ready and Solar Ready Code — adopted alongside the 2024 I-Codes; 2023 National Electrical Code (NEC) remains in effect through December 31, 2026; the 2026 NEC takes effect January 1, 2027. Source: Town of Parker Building Codes page, https://www.parkerco.gov/445/Building-Codes; Roofing-specific current code reference (per the Town's own Re-Roofing Requirements handout, revised 3/14/2025, which predates the 2024 I-Code transition): 2021 IRC (Residential) and 2021 IBC (Commercial and Multi-Family). Source: https://www.parkerco.gov/DocumentCenter/View/738; Colorado has no statewide mandatory building code for most jurisdictions (home-rule authority). Parker's own adopted codes, amendments, and effective dates as listed above are the governing figures; always confirm current status directly with the Building Division given the June 30, 2026 code-transition date. Source: Colorado Energy Office, Building Energy Codes Toolkit, https://energyoffice.colorado.gov/building-energy-codes-toolkit. Local amendments apply — see the Parker overview page for the full list.

Yes, for permanent signs — a Sign Permit is required under LDO Sec. 13.09.020(f)(1) before construction or installation, with limited exemptions (e.g., small signs under 2 sq ft on residential parcels). Temporary signs instead go through a separate registration process.

Sources & verification

Verified against official sources. Last reviewed 2026-08-14.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Parker building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.