Change of Use / Change of Occupancy Permit — Edgewater, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://www.edgewaterco.gov/home/showpublisheddocument/902/638017915968800000
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Edgewater, Colorado
Required whenever a commercial space in Edgewater changes occupancy, changes use, or expands its use/occupancy into more space in the same building — regardless of whether any construction or remodeling accompanies the change. Edgewater does not publish a standalone 'change of use permit' application or fee; per the City's own Commercial New Business Tenant Information guidance, this requirement is enforced through the ordinary building permit process (technically governed by the 2021 International Existing Building Code, Sec. 18-9-10, as locally adopted) plus the City's general Business License requirement (Municipal Code Chapter 6, Article 1). Where the new occupancy classification affects fire/life-safety systems, West Metro Fire Protection District's own guidance separately names 'change in occupancy type or use' as one of its planned-construction-project scenarios requiring WMFPD permit and inspection in addition to the City's building permit.
Verified 2026-08-13 · Source
When you need this permit
- Per the City's own Commercial New Business Tenant Information document: 'Any commercial changes of occupancy, changes of use, expansions of use, or expansions of occupancy into more space in the same building, regardless of whether there will be any construction or remodeling to prepare the space for the new tenant, require a building permit and inspection prior to operating the business in the space' — this applies even to a same-size space, or a business simply moving to a different space in the same building
- A plan showing the existing floor plan and proposed new layout must be submitted, reasonably to scale, including a graphic showing the space's location within the building relative to other spaces and the parking lot; if the building itself is being expanded, a survey is also required
- A completed building permit application must be submitted through the Building Department (SAFEbuilt, via CommunityCore)
- A City of Edgewater business license is required to operate the business in the new space, managed through the City Clerk's office; the application requires prior evidence of an active building permit/inspection sign-off consistent with the space's approved use
- Where the change of use triggers construction, remodeling, or tenant-improvement work, this file's commercial-tenant-improvement entry applies (Commercial Submittal Checklist, stamped architectural/structural/electrical/mechanical plans, 2021 Energy Code compliance documentation)
- West Metro Fire Protection District's own 'West Metro Fire Rescue Permit & Inspection Process - Edgewater' guidance names 'change in occupancy type or use' as one of the scenarios requiring a separate WMFPD fire-district permit and inspection, in addition to the City's building permit, when the new occupancy affects fire/life-safety requirements
- For restaurants and commercial kitchens specifically: a grease interceptor is required per the adopted Plumbing Code where grease output is damaging to the sewer system; restaurants over 5,000 square feet must have an approved fire sprinkler system; Type I hoods are required over grease/smoke-producing equipment; Jefferson County Health Department approval (letter, email, or fax) is required as a condition of the Certificate of Occupancy and must be on the jobsite before final inspection
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Occupancy Building Inspection
Confirms the new layout and occupancy classification comply with applicable code before the business may operate; required even where no construction work was performed
- 2
Fire Life-Safety Inspection (West Metro Fire Protection District)
Required where the change in occupancy type or use affects fire/life-safety systems; a separate track from the City's own inspection
- 3
Health Department Approval
Required as a Certificate of Occupancy condition for food-service or child-care uses; must be documented on the jobsite before final inspection
See the full Edgewater inspection guide — scheduling & re-inspection fees →
Tips
- Edgewater does not publish a named 'change of use' or 'change of occupancy' application separate from the ordinary building permit — but the City's own Commercial New Business Tenant Information document is explicit that a building permit and inspection are required before operating in the space 'regardless of whether there will be any construction or remodeling,' even for a same-size space or an in-building move. Don't assume a use change with zero physical work is exempt.
- A City of Edgewater business license (via the City Clerk's office) is required in addition to, and separate from, the building permit — budget time for both processes, since the business license application references the space's approved use.
- Because a change of occupancy can trigger fire-protection requirements (sprinklers, alarms, egress reconfiguration), West Metro Fire Protection District's own guidance names 'change in occupancy type or use' as a scenario requiring its own separate permit and inspection — coordinate with WMFPD early, not just with SAFEbuilt.
- Restaurant and commercial-kitchen changes of use carry extra requirements: grease interceptor sizing, a fire sprinkler system if over 5,000 square feet, correct Type I/II hood installation, and Jefferson County Health Department sign-off as a Certificate of Occupancy condition — budget calendar time for the Health Department review specifically, since it is a genuinely separate agency from the City and WMFPD.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewater building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Edgewater
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Edgewater project checklist
Describe your project once and get every permit, document, and fee it triggers in Edgewater — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →