EV Charger / EVSE Permit (Billed as General Electrical Work) in Edgewater, Colorado

Required for installation of a Level 2 (or higher) electric vehicle charger/EVSE in Edgewater. The City has no dedicated EV-charger fee line item, application form, or ordinance — Edgewater's own population (approx. 4,900 per recent Census-based estimates) is below the 10,000-population threshold that makes a municipality a 'covered municipality' under Colorado HB24-1173 (Electric Vehicle Charging System Permits Act, effective Aug. 7, 2024), so the City is not required to adopt the Colorado Energy Office's model EV-charger permitting code or a dedicated objective-standards ordinance. An EV charger circuit is billed under the City's own 'All Other Electrical Fee' (installation-valuation-based) schedule, the same non-living-area electrical fee table the City's own Fee Surcharge Schedule explicitly applies to 'garage, shop, photovoltaic, etc.' work, and reviewed under the 2023 NEC (NFPA 70) Article 625 as adopted by Edgewater Municipal Code Sec. 18-4-10.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical Permit Application submitted via the CommunityCore online portal
  • Contractors must hold a current Colorado State Electrical Board (DORA) license plus a City of Edgewater Contractor's License; homeowner permits available for work on an owner's own non-rental, non-resale dwelling per CRS 12-23-111(2) Contractor
  • Fee calculated under the 'All Other Electrical Fee' (installation-valuation-based) schedule, since an EV charger is non-living-area equipment, not a square-footage-based residential fee item
  • No dedicated EV-charger checklist, model-code adoption, or 3-business-day HB24-1173 notification commitment was found published by the City — Edgewater is below the 10,000-population 'covered municipality' threshold that triggers HB24-1173's requirements

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

All Other Electrical Fee — installation valuation not more than $2,000City of Edgewater Fee Surcharge Schedule, Code Ref. 18-1-40(f) — the City's own fee schedule explicitly applies this non-living-area tier to 'garage, shop, photovoltaic, etc.' work; an EV charger/EVSE circuit falls under the same tier since it is not new living area
$115.00
All Other Electrical Fee — per $1,000 of valuation above $2,000
$11.50 plus the $115.00 base fee
Reinspection Fee (electrical)
$57.50

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit (Billed as General Electrical Work) permit actually take in Edgewater?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Charger circuit wiring and breaker sizing before concealment

  2. 2

    Final Inspection

    EVSE installed, GFCI/disconnect verified, system energized

See the full Edgewater inspection guide — scheduling & re-inspection fees →

Tips

  • Edgewater has no EV-charger-specific permit, form, or fee line — a home EV charger/EVSE is billed under the City's 'All Other Electrical Fee' (installation-valuation-based) schedule, which the City's own Fee Surcharge Schedule expressly names for non-living-area work like 'garage, shop, photovoltaic, etc.'
  • Colorado's HB24-1173 (EV Charging System Permits Act) requires 'covered municipalities' (population 10,000+) to adopt streamlined EV-charger permitting standards by Dec. 31, 2025 — Edgewater, at roughly 4,900 residents, falls below that threshold and is not bound by the Act's model-code-or-ordinance mandate or its 3-business-day decision-notification clock.
  • Homeowner permits require a signed Homeowner Electrical and Plumbing Waiver certifying the property is not for immediate resale and is not tenant-occupied rental property.

Frequently asked questions

Edgewater requires an ev charger / evse permit (billed as general electrical work) for: Electrical Permit Application submitted via the CommunityCore online portal; Contractors must hold a current Colorado State Electrical Board (DORA) license plus a City of Edgewater Contractor's License; homeowner permits available for work on an owner's own non-rental, non-resale dwelling per CRS 12-23-111(2); Fee calculated under the 'All Other Electrical Fee' (installation-valuation-based) schedule, since an EV charger is non-living-area equipment, not a square-footage-based residential fee item; No dedicated EV-charger checklist, model-code adoption, or 3-business-day HB24-1173 notification commitment was found published by the City — Edgewater is below the 10,000-population 'covered municipality' threshold that triggers HB24-1173's requirements. If your project isn't listed, confirm with City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 before starting work.

Edgewater has no dedicated EV-charger fee. It is billed under the City's 'All Other Electrical Fee' (installation-valuation-based) schedule: $115.00 for installation valuation up to $2,000, plus $11.50 per additional $1,000 of valuation above that, per the City of Edgewater Fee Surcharge Schedule (Code Ref. 18-1-40(f)).

Edgewater does not publish a plan-review timeline for this permit. Contact City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 for current turnaround.

You'll need: Electrical Permit Application. Depending on your project, Edgewater may also ask for: Homeowner Electrical and Plumbing Permit Waiver. See the required-documents checklist on this page for details on each.

Edgewater requires 2 inspection(s) for an ev charger / evse permit (billed as general electrical work), in order: Rough Electrical, Final Inspection. Schedule each through City of Edgewater Community Development Department, Building & Planning Division ((720) 763-3001).

Apply through City of Edgewater Community Development Department, Building & Planning Division at 1800 Harlan St, Edgewater, CO 80214. Phone: (720) 763-3001, email: lhubble@edgewaterco.com. Office hours: Community Development is available Monday - Thursday 9am - 5pm, except holidays. Best reached at (720) 763-3001 (Logan Hubble, Planning & Development Manager). Building Permit Technician (Bridget McGeoghegan, SAFEbuilt) direct line (303) 450-8745. Inspection requests: call (303) 450-8748 by 4pm the business day before the desired inspection, or call (303) 450-8745 after 8:30am the morning of the inspection for a two-hour arrival window. The City has contracted its building division services (plan review, inspections, code enforcement) to SAFEbuilt since 2013.. Official information: https://www.edgewaterco.gov/city-services/building-planning.

Edgewater, Colorado has adopted: 2021 International Building Code (IBC), with appendices I and N — Edgewater Municipal Code Sec. 18-2-10, adopted pursuant to Title 31, Article 16, Part 2, C.R.S.; 2021 International Residential Code (IRC), with all appendices — Sec. 18-3-10; 2023 National Electrical Code (NFPA 70) — Sec. 18-4-10, adopted by Ord. 2024-06 (2024), no local amendments ('none' per Sec. 18-4-30); 2021 International Mechanical Code (IMC) — Sec. 18-5-10; 2021 International Plumbing Code (IPC) — Sec. 18-6-10, with local amendments at Sec. 18-6-30 (administrative sections re-pointing to City fee/appeal provisions); 2021 International Fire Code (IFC) — Sec. 18-7-10; 2021 International Fuel Gas Code (IFGC) — Sec. 18-8-10; 2021 International Existing Building Code (IEBC) — Sec. 18-9-10 (explicitly includes all buildings moved into the City, including manufactured/modular buildings, per Sec. 18-1-10(8)); 2021 International Energy Conservation Code (IECC) — Sec. 18-10-10, with locally adopted Appendix RB/CB (Solar Ready), Appendix RD/CD (EV Ready), and Electric Ready provisions per Ord. 2023-08 (effective Sept. 1, 2023); 1997 Uniform Code for the Abatement of Dangerous Buildings (UCADB) — Sec. 18-13-10; 2021 International Swimming Pool and Spa Code — listed on the City's live Applicable Codes & Design Criteria page (not independently cross-checked against a Municode chapter section during this review); ANSI A117.1-2012 Accessible and Usable Buildings and Facilities — listed on the City's live Applicable Codes & Design Criteria page; Discrepancy note: the City's live 'Applicable Codes & Design Criteria' webpage (edgewaterco.gov) lists '2020 National Electrical Code,' but the codified Edgewater Municipal Code Sec. 18-4-10 (Municode, current through Ord. 2024-06, adopted 2024) explicitly adopts 'NFPA 70 National Electric Code 2023.' The codified ordinance text is treated as the current, governing adoption in this file since it is dated later (2024) and is the actual legal text of Chapter 18, not a summary webpage that may lag a code update — consistent with this corpus's practice of trusting the actively-maintained legal source over a potentially stale summary page (see Vail's identical pattern).. Local amendments apply — see the Edgewater overview page for the full list.

No. HB24-1173 only binds 'covered municipalities' with population 10,000 or more. Edgewater's population is approximately 4,900 per recent Census-based estimates, so the City is not required to adopt the Colorado Energy Office's model EV-charger permitting code, an objective-standards ordinance, or the Act's 3-business-day permit-decision notification requirement.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewater building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.