Rooftop Solar / Photovoltaic Permit in Edgewater, Colorado

Required for solar panel installation or replacement in Edgewater. SAFEbuilt (the City's contracted building-division provider) publishes a dedicated Photovoltaic System Submittal Requirements guide. Note: the guide itself (last revised 4/25/2022) cites the '2020 NEC, 2018 International Codes' as applicable, which predates the City's current 2021-cycle code adoption and 2023 NEC — treated as a stale reference in this file; the currently governing codes are those in Chapter 18 (2021 IRC/IBC family, 2023 NEC).

Verified 2026-07-20 · Source

When you need this permit

  • Online application describing work completely, with valuation based on total contract cost (materials + labor) to the customer
  • Separate plan review required for each building/address requiring a separate permit
  • Structural engineer's stamped letter required for panel weight/wind load addition, per the City's adopted design criteria: minimum 40 psf ground snow load, 130 mph Vult wind speed, Exposure C, Seismic Design Category B (per SAFEbuilt's PV guide; consistent with the City's general design criteria in Sec. 18-1-10 apart from the guide's use of Exposure C vs. the City's general Exposure B — confirm exposure category with SAFEbuilt for your specific site)
  • Ground-mounted systems require a separate engineer-stamped letter for support/wind load
  • Four-line electrical diagram required: module count/circuit layout, wire sizes/insulation, conduit sizes, junction boxes, inverter type, combiner panel, disconnect, meter, fuses/breakers, grounding
  • Building/structural plans: roof layout with panel locations and dimensions, fire pathways/setbacks per IRC/IFC, connection details, site plan showing equipment and property-line distances
  • Resubmittals must be uploaded directly to the permit in CommunityCore, not sent directly to the plan examiner
  • Zoning compliance is the applicant's responsibility to verify directly with the jurisdiction

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Fee (All Other) — installation valuation not more than $2,000Fee Surcharge Schedule, Code Ref. 18-1-40(f), Section B (photovoltaic named as an example of this category)
$115.00
Electrical Fee (All Other) — per $1,000 of valuation above $2,000
$11.50 plus the $115.00 base fee
Building Permit Fee (structural/roof-mount review, valuation-based)Code Ref. 18-1-40(a); applies to the structural/building-permit side of a PV installation separate from the electrical fee
$35.00 minimum, scaling per the valuation tiers in the Fee Surcharge Schedule
Solar energy device fee cap (Sec. 18-1-40(e)) — EXPIRED, not currently in effectPer Sec. 18-1-40(e)(4), this cap 'shall be of no further force or effect after July 1, 2025' — expired as of this review; standard valuation-based building and electrical fees apply unless a newer ordinance (not found during this review) has reinstated or replaced it
Previously capped at the lesser of actual City cost or $500 residential / $1,000 nonresidential for non-utility-scale systems (under 10kW residential / 25kW nonresidential)
Statewide aggregate fee cap on active solar energy system installs (CURRENTLY IN EFFECT, distinct from the City's own expired local cap above)Re-chased 2026-07-20: the City's own local fee-cap ordinance (Sec. 18-1-40(e)) expired July 1, 2025, but that is a SEPARATE, City-specific provision from Colorado's statewide statutory cap (C.R.S. 24-48.5-113, enacted by HB21-1284), which remains in effect statewide through its own repeal date of December 31, 2029 and is not tied to or affected by Edgewater's local sunset clause. The statute applies to 'the state or any agency, institution, authority, or political subdivision of the state' regardless of home-rule status. So while Edgewater's own $500/$1,000 local cap no longer applies, the state's identical-dollar-amount cap independently still does — the practical ceiling on combined City fees is unchanged in amount, just sourced from state rather than municipal law.
$500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284)

Review timeline

Plan review
Not published — contact the department

How long did your Rooftop Solar / Photovoltaic Permit permit actually take in Edgewater?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified

See the full Edgewater inspection guide — scheduling & re-inspection fees →

Tips

  • The City's OWN local fee cap on solar permits (Sec. 18-1-40(e), capping fees at $500 residential / $1,000 nonresidential for smaller systems) legally expired July 1, 2025 — do not assume Edgewater's municipal ordinance still caps fees. However, Colorado's separate statewide statutory cap (C.R.S. 24-48.5-113 / HB21-1284) independently caps the aggregate of all City-imposed solar fees at the same $500/$1,000 dollar amounts, and that state-law cap remains in effect through December 31, 2029 regardless of the local ordinance's sunset — so the practical dollar ceiling is unchanged even though its legal source shifted from City code to state statute.
  • SAFEbuilt's Photovoltaic Submittal Requirements guide (last revised 2022) references the 2020 NEC and 2018 International Codes, which predate Edgewater's current 2021-code-cycle adoption and 2023 NEC — confirm which code edition your reviewer will actually apply before finalizing engineering calculations.
  • The color red must not be used anywhere on submitted plans by the design team — that color is reserved for the plan examiner's markup comments.
  • Resubmittals must be uploaded directly to the permit record in CommunityCore, not emailed to the plan examiner directly.

Frequently asked questions

Edgewater requires a rooftop solar / photovoltaic permit for: Online application describing work completely, with valuation based on total contract cost (materials + labor) to the customer; Separate plan review required for each building/address requiring a separate permit; Structural engineer's stamped letter required for panel weight/wind load addition, per the City's adopted design criteria: minimum 40 psf ground snow load, 130 mph Vult wind speed, Exposure C, Seismic Design Category B (per SAFEbuilt's PV guide; consistent with the City's general design criteria in Sec. 18-1-10 apart from the guide's use of Exposure C vs. the City's general Exposure B — confirm exposure category with SAFEbuilt for your specific site); Ground-mounted systems require a separate engineer-stamped letter for support/wind load; Four-line electrical diagram required: module count/circuit layout, wire sizes/insulation, conduit sizes, junction boxes, inverter type, combiner panel, disconnect, meter, fuses/breakers, grounding; Building/structural plans: roof layout with panel locations and dimensions, fire pathways/setbacks per IRC/IFC, connection details, site plan showing equipment and property-line distances; Resubmittals must be uploaded directly to the permit in CommunityCore, not sent directly to the plan examiner; Zoning compliance is the applicant's responsibility to verify directly with the jurisdiction. If your project isn't listed, confirm with City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 before starting work.

Yes, but from a different source than before. Edgewater Municipal Code Sec. 18-1-40(e) previously capped solar permit fees at the lesser of the City's actual cost or $500 (residential) / $1,000 (nonresidential), but that LOCAL provision expired by its own terms on July 1, 2025, per Sec. 18-1-40(e)(4). Separately, Colorado's statewide statutory cap (C.R.S. 24-48.5-113, enacted by HB21-1284) independently caps the aggregate of all City-imposed solar fees at the same $500/$1,000 dollar amounts, and that state-law cap is still in effect (through December 31, 2029) regardless of the City's own ordinance sunset.

Edgewater does not publish a plan-review timeline for this permit. Contact City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 for current turnaround.

You'll need: Solar Panel and Photovoltaic Guide / Photovoltaic System Submittal Requirements; Structural Engineer Stamped Letter; Four-Line Electrical Diagram. See the required-documents checklist on this page for details on each.

Edgewater requires 2 inspection(s) for a rooftop solar / photovoltaic permit, in order: Rough Electrical, Final Inspection. Schedule each through City of Edgewater Community Development Department, Building & Planning Division ((720) 763-3001).

Apply through City of Edgewater Community Development Department, Building & Planning Division at 1800 Harlan St, Edgewater, CO 80214. Phone: (720) 763-3001, email: lhubble@edgewaterco.com. Office hours: Community Development is available Monday - Thursday 9am - 5pm, except holidays. Best reached at (720) 763-3001 (Logan Hubble, Planning & Development Manager). Building Permit Technician (Bridget McGeoghegan, SAFEbuilt) direct line (303) 450-8745. Inspection requests: call (303) 450-8748 by 4pm the business day before the desired inspection, or call (303) 450-8745 after 8:30am the morning of the inspection for a two-hour arrival window. The City has contracted its building division services (plan review, inspections, code enforcement) to SAFEbuilt since 2013.. Official information: https://www.edgewaterco.gov/city-services/building-planning.

Edgewater, Colorado has adopted: 2021 International Building Code (IBC), with appendices I and N — Edgewater Municipal Code Sec. 18-2-10, adopted pursuant to Title 31, Article 16, Part 2, C.R.S.; 2021 International Residential Code (IRC), with all appendices — Sec. 18-3-10; 2023 National Electrical Code (NFPA 70) — Sec. 18-4-10, adopted by Ord. 2024-06 (2024), no local amendments ('none' per Sec. 18-4-30); 2021 International Mechanical Code (IMC) — Sec. 18-5-10; 2021 International Plumbing Code (IPC) — Sec. 18-6-10, with local amendments at Sec. 18-6-30 (administrative sections re-pointing to City fee/appeal provisions); 2021 International Fire Code (IFC) — Sec. 18-7-10; 2021 International Fuel Gas Code (IFGC) — Sec. 18-8-10; 2021 International Existing Building Code (IEBC) — Sec. 18-9-10 (explicitly includes all buildings moved into the City, including manufactured/modular buildings, per Sec. 18-1-10(8)); 2021 International Energy Conservation Code (IECC) — Sec. 18-10-10, with locally adopted Appendix RB/CB (Solar Ready), Appendix RD/CD (EV Ready), and Electric Ready provisions per Ord. 2023-08 (effective Sept. 1, 2023); 1997 Uniform Code for the Abatement of Dangerous Buildings (UCADB) — Sec. 18-13-10; 2021 International Swimming Pool and Spa Code — listed on the City's live Applicable Codes & Design Criteria page (not independently cross-checked against a Municode chapter section during this review); ANSI A117.1-2012 Accessible and Usable Buildings and Facilities — listed on the City's live Applicable Codes & Design Criteria page; Discrepancy note: the City's live 'Applicable Codes & Design Criteria' webpage (edgewaterco.gov) lists '2020 National Electrical Code,' but the codified Edgewater Municipal Code Sec. 18-4-10 (Municode, current through Ord. 2024-06, adopted 2024) explicitly adopts 'NFPA 70 National Electric Code 2023.' The codified ordinance text is treated as the current, governing adoption in this file since it is dated later (2024) and is the actual legal text of Chapter 18, not a summary webpage that may lag a code update — consistent with this corpus's practice of trusting the actively-maintained legal source over a potentially stale summary page (see Vail's identical pattern).. Local amendments apply — see the Edgewater overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewater building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.