Plumbing Permit — Edgewater, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://library.municode.com/co/edgewater/codes/municipal_code?nodeId=EDMUCO_CH18BURE
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Edgewater, Colorado
Required for plumbing modifications, installations, and repairs in Edgewater. Governed by the 2021 International Plumbing Code (IPC) as adopted and locally amended by Edgewater Municipal Code Sec. 18-6-10/18-6-30. Edgewater runs its own City/SAFEbuilt-administered plumbing permitting and inspection program under the general Building Permit Fee valuation schedule, rather than deferring to the Colorado State Plumbing Board for permit issuance.
Verified 2026-07-06 · Source
When you need this permit
- Governed by the 2021 IPC as adopted, with local amendments re-pointing IPC administrative sections (permit fees, plan review fees, fee refunds, appeals) to the City's own Chapter 18 Article 1 provisions
- Contractors must hold a current Colorado State Plumbing Board (DORA) license, subject to contemporaneous verification by the City/SAFEbuilt, plus a City of Edgewater Contractor's License (or Plumbing License, $78/year) Contractor
- Homeowner permits available for work on an owner's own non-rental, non-resale dwelling per CRS 12-58-113(2); requires a signed Homeowner Electrical and Plumbing Permit Waiver
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
See the full Edgewater inspection guide — scheduling & re-inspection fees →
Tips
- Edgewater's Fee Surcharge Schedule does not publish a plumbing-specific valuation table distinct from the general Building Permit Fee table — plumbing permits are billed under the same valuation tiers as building permits (Code Ref. 18-1-40(a)), unlike electrical which has its own dedicated schedule at 18-1-40(f).
- Homeowners performing their own plumbing work must sign the Homeowner Electrical and Plumbing Permit Waiver certifying the property is not for resale and not tenant-occupied rental property.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewater building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Edgewater
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Edgewater project checklist
Describe your project once and get every permit, document, and fee it triggers in Edgewater — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →