Skip to main content
PermitBase

Roofing Permit (Re-Roof) in Edgewater, Colorado

Required for residential and commercial re-roofing work in Edgewater. Reviewed under the 2021 IRC (residential) with Edgewater-specific Residential Roofing Requirements (2021) and Commercial Roofing Requirements documents published by the City.

Verified 2026-07-06 · Source

When you need this permit

  • Roof replacement must remove existing roof-covering layers down to the roof deck unless an exemption is met (IRC R908.3)
  • Asphalt shingles must be tested to ASTM D 7158 and meet Table R905.2.4.1 wind-speed classification requirements, fastened to solidly sheathed decks
  • Drip edge required at eaves and rake edges; valley linings per manufacturer instructions and IRC R905.2.8.2
  • Ice barrier underlayment is required per the City's Residential Roofing Requirements document
  • A ladder must be on-site, tied off to the roof, for the inspection, per OSHA guidelines
  • Commercial re-roofs follow the separate Commercial Roofing Requirements document

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same schedule as new construction)No separate flat re-roof fee published; billed under the general valuation-based Building Permit Fee schedule, Code Ref. 18-1-40(a)
$35.00 minimum, scaling per the valuation tiers in the City's Fee Surcharge Schedule
Plan Review Fee
65% of the Permit Fee
Use Tax
Total valuation x 50% x 4%

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Edgewater?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — shingle classification, ice barrier underlayment, drip edge, and valley/flashing compliance verified; ladder tied off and on-site for inspector access per OSHA guidelines

See the full Edgewater inspection guide — scheduling & re-inspection fees →

Tips

  • Edgewater's Residential Roofing Requirements document specifically calls out that a tied-off ladder must be on-site for the roofing inspection per OSHA guidelines — arrange this with your roofing contractor ahead of the inspection date.
  • Confirm your roofing material's ASTM D 7158 wind-speed classification matches Table R905.2.4.1 requirements for Edgewater's adopted 130 mph ultimate wind design speed before ordering shingles.

Frequently asked questions

Edgewater requires a roofing permit (re-roof) for: Roof replacement must remove existing roof-covering layers down to the roof deck unless an exemption is met (IRC R908.3); Asphalt shingles must be tested to ASTM D 7158 and meet Table R905.2.4.1 wind-speed classification requirements, fastened to solidly sheathed decks; Drip edge required at eaves and rake edges; valley linings per manufacturer instructions and IRC R905.2.8.2; Ice barrier underlayment is required per the City's Residential Roofing Requirements document; A ladder must be on-site, tied off to the roof, for the inspection, per OSHA guidelines; Commercial re-roofs follow the separate Commercial Roofing Requirements document. If your project isn't listed, confirm with City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 before starting work.

In Edgewater, the published Building Permit Fee (valuation-based, same schedule as new construction) is: $35.00 minimum, scaling per the valuation tiers in the City's Fee Surcharge Schedule. Additional published fees: Plan Review Fee — 65% of the Permit Fee; Use Tax — Total valuation x 50% x 4%. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Edgewater does not publish a plan-review timeline for this permit. Contact City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 for current turnaround.

You'll need: Roofing Permit Application; Residential Roofing Requirements (2021 IRC). Depending on your project, Edgewater may also ask for: Commercial Roofing Requirements. See the required-documents checklist on this page for details on each.

Edgewater requires 1 inspection(s) for a roofing permit (re-roof), in order: Final Inspection (roof). Schedule each through City of Edgewater Community Development Department, Building & Planning Division ((720) 763-3001).

Apply through City of Edgewater Community Development Department, Building & Planning Division at 1800 Harlan St, Edgewater, CO 80214. Phone: (720) 763-3001, email: lhubble@edgewaterco.com. Office hours: Community Development is available Monday - Thursday 9am - 5pm, except holidays. Best reached at (720) 763-3001 (Logan Hubble, Planning & Development Manager). Building Permit Technician (Bridget McGeoghegan, SAFEbuilt) direct line (303) 450-8745. Inspection requests: call (303) 450-8748 by 4pm the business day before the desired inspection, or call (303) 450-8745 after 8:30am the morning of the inspection for a two-hour arrival window. The City has contracted its building division services (plan review, inspections, code enforcement) to SAFEbuilt since 2013.. Official information: https://www.edgewaterco.gov/city-services/building-planning.

Edgewater, Colorado has adopted: 2021 International Building Code (IBC), with appendices I and N — Edgewater Municipal Code Sec. 18-2-10, adopted pursuant to Title 31, Article 16, Part 2, C.R.S.; 2021 International Residential Code (IRC), with all appendices — Sec. 18-3-10; 2023 National Electrical Code (NFPA 70) — Sec. 18-4-10, adopted by Ord. 2024-06 (2024), no local amendments ('none' per Sec. 18-4-30); 2021 International Mechanical Code (IMC) — Sec. 18-5-10; 2021 International Plumbing Code (IPC) — Sec. 18-6-10, with local amendments at Sec. 18-6-30 (administrative sections re-pointing to City fee/appeal provisions); 2021 International Fire Code (IFC) — Sec. 18-7-10; 2021 International Fuel Gas Code (IFGC) — Sec. 18-8-10; 2021 International Existing Building Code (IEBC) — Sec. 18-9-10 (explicitly includes all buildings moved into the City, including manufactured/modular buildings, per Sec. 18-1-10(8)); 2021 International Energy Conservation Code (IECC) — Sec. 18-10-10, with locally adopted Appendix RB/CB (Solar Ready), Appendix RD/CD (EV Ready), and Electric Ready provisions per Ord. 2023-08 (effective Sept. 1, 2023); 1997 Uniform Code for the Abatement of Dangerous Buildings (UCADB) — Sec. 18-13-10; 2021 International Swimming Pool and Spa Code — listed on the City's live Applicable Codes & Design Criteria page (not independently cross-checked against a Municode chapter section during this review); ANSI A117.1-2012 Accessible and Usable Buildings and Facilities — listed on the City's live Applicable Codes & Design Criteria page; Discrepancy note: the City's live 'Applicable Codes & Design Criteria' webpage (edgewaterco.gov) lists '2020 National Electrical Code,' but the codified Edgewater Municipal Code Sec. 18-4-10 (Municode, current through Ord. 2024-06, adopted 2024) explicitly adopts 'NFPA 70 National Electric Code 2023.' The codified ordinance text is treated as the current, governing adoption in this file since it is dated later (2024) and is the actual legal text of Chapter 18, not a summary webpage that may lag a code update — consistent with this corpus's practice of trusting the actively-maintained legal source over a potentially stale summary page (see Vail's identical pattern).. Local amendments apply — see the Edgewater overview page for the full list.

Generally yes — per the City's adopted 2021 IRC (R908.3), roof replacement must include removal of existing layers of roof covering down to the roof deck unless a specific code exemption is met.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewater building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.