Demolition Permit in Edgewater, Colorado

Required for demolition of structures in Edgewater. Governed by Edgewater Municipal Code Chapter 18, with a specific expiration rule distinct from other permit types: work must commence within 30 days of issuance and remain continuous, or the permit expires after a 10-day suspension.

Verified 2026-07-06 · Source

When you need this permit

  • Work authorized by a demolition permit must commence within 30 days of issuance and be continuous per normal trade-standard progress rates
  • If work is suspended or abandoned for 10+ days after commencing, the permit expires (Sec. 18-1-50(c))
  • Wrecking may only be performed by a licensed wrecking contractor, except a licensed Class A or Class B general contractor may wreck minor buildings or portions thereof as part of an alteration/remodeling program
  • All contractors must hold a current City of Edgewater Contractor's License Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Wrecking FeeFee Surcharge Schedule, Code Ref. 18-1-40(a)
$10.00 plus $0.03 per square foot of floor area (includes basement, first floor, and all other floors)
Plan Review Fee
65% of the Permit Fee, where plans/data are required to be submitted

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Edgewater?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (demolition)

    Site cleared, utilities properly capped/disconnected, no remaining hazards

See the full Edgewater inspection guide — scheduling & re-inspection fees →

Tips

  • Demolition permits carry a stricter expiration rule than other Edgewater permit types: work must start within 30 days of issuance and stay continuous, or the permit expires after just a 10-day suspension (versus the general permit expiration rule that turns on 'normal rate of progress' without a fixed suspension trigger).

Frequently asked questions

Edgewater requires a demolition permit for: Work authorized by a demolition permit must commence within 30 days of issuance and be continuous per normal trade-standard progress rates; If work is suspended or abandoned for 10+ days after commencing, the permit expires (Sec. 18-1-50(c)); Wrecking may only be performed by a licensed wrecking contractor, except a licensed Class A or Class B general contractor may wreck minor buildings or portions thereof as part of an alteration/remodeling program; All contractors must hold a current City of Edgewater Contractor's License. If your project isn't listed, confirm with City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 before starting work.

In Edgewater, the published Wrecking Fee is: $10.00 plus $0.03 per square foot of floor area (includes basement, first floor, and all other floors). Additional published fees: Plan Review Fee — 65% of the Permit Fee, where plans/data are required to be submitted. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Edgewater does not publish a plan-review timeline for this permit. Contact City of Edgewater Community Development Department, Building & Planning Division at (720) 763-3001 for current turnaround.

You'll need: Demolition Permit Application. See the required-documents checklist on this page for details on each.

Edgewater requires 1 inspection(s) for a demolition permit, in order: Final Inspection (demolition). Schedule each through City of Edgewater Community Development Department, Building & Planning Division ((720) 763-3001).

Apply through City of Edgewater Community Development Department, Building & Planning Division at 1800 Harlan St, Edgewater, CO 80214. Phone: (720) 763-3001, email: lhubble@edgewaterco.com. Office hours: Community Development is available Monday - Thursday 9am - 5pm, except holidays. Best reached at (720) 763-3001 (Logan Hubble, Planning & Development Manager). Building Permit Technician (Bridget McGeoghegan, SAFEbuilt) direct line (303) 450-8745. Inspection requests: call (303) 450-8748 by 4pm the business day before the desired inspection, or call (303) 450-8745 after 8:30am the morning of the inspection for a two-hour arrival window. The City has contracted its building division services (plan review, inspections, code enforcement) to SAFEbuilt since 2013.. Official information: https://www.edgewaterco.gov/city-services/building-planning.

Edgewater, Colorado has adopted: 2021 International Building Code (IBC), with appendices I and N — Edgewater Municipal Code Sec. 18-2-10, adopted pursuant to Title 31, Article 16, Part 2, C.R.S.; 2021 International Residential Code (IRC), with all appendices — Sec. 18-3-10; 2023 National Electrical Code (NFPA 70) — Sec. 18-4-10, adopted by Ord. 2024-06 (2024), no local amendments ('none' per Sec. 18-4-30); 2021 International Mechanical Code (IMC) — Sec. 18-5-10; 2021 International Plumbing Code (IPC) — Sec. 18-6-10, with local amendments at Sec. 18-6-30 (administrative sections re-pointing to City fee/appeal provisions); 2021 International Fire Code (IFC) — Sec. 18-7-10; 2021 International Fuel Gas Code (IFGC) — Sec. 18-8-10; 2021 International Existing Building Code (IEBC) — Sec. 18-9-10 (explicitly includes all buildings moved into the City, including manufactured/modular buildings, per Sec. 18-1-10(8)); 2021 International Energy Conservation Code (IECC) — Sec. 18-10-10, with locally adopted Appendix RB/CB (Solar Ready), Appendix RD/CD (EV Ready), and Electric Ready provisions per Ord. 2023-08 (effective Sept. 1, 2023); 1997 Uniform Code for the Abatement of Dangerous Buildings (UCADB) — Sec. 18-13-10; 2021 International Swimming Pool and Spa Code — listed on the City's live Applicable Codes & Design Criteria page (not independently cross-checked against a Municode chapter section during this review); ANSI A117.1-2012 Accessible and Usable Buildings and Facilities — listed on the City's live Applicable Codes & Design Criteria page; Discrepancy note: the City's live 'Applicable Codes & Design Criteria' webpage (edgewaterco.gov) lists '2020 National Electrical Code,' but the codified Edgewater Municipal Code Sec. 18-4-10 (Municode, current through Ord. 2024-06, adopted 2024) explicitly adopts 'NFPA 70 National Electric Code 2023.' The codified ordinance text is treated as the current, governing adoption in this file since it is dated later (2024) and is the actual legal text of Chapter 18, not a summary webpage that may lag a code update — consistent with this corpus's practice of trusting the actively-maintained legal source over a potentially stale summary page (see Vail's identical pattern).. Local amendments apply — see the Edgewater overview page for the full list.

Work authorized by a demolition permit must commence within 30 days of issuance and remain continuous; if suspended or abandoned for 10 or more days after work has started, the permit expires per Edgewater Municipal Code Sec. 18-1-50(c).

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edgewater building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.