Demolition Permit — Lakewood, Colorado · Requirements sheet
Verified 2026-06-30 · Source: https://www.lakewoodco.gov/Local-Government/Departments/Public-Works/Building-and-Construction-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Lakewood, Colorado
Required for demolition of structures, interior demolition, and asbestos abatement in Lakewood. Applied for in eTRAKiT under Permit Type 'Demolition' (subtypes: Interior Demo/Asbestos Abatement, Commercial or Multi Family Building, Residential Building, Accessory Building). Underground storage tank removal requires a West Metro Fire permit first.
Verified 2026-06-30 · Source
When you need this permit
- eTRAKiT Permit Type 'Demolition' with subtypes: Interior Demo/Asbestos Abatement, Commercial or Multi Family Building, Residential Building, Accessory Building (detached garage, shed, carport, or non-primary building)
- Underground Storage Tank Removal requires a permit from West Metro Fire BEFORE applying for the Lakewood demolition permit
- An asbestos survey/report is required for most demolition/renovation projects per State of Colorado requirements
- All demolition contractors must be registered with the City of Lakewood
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Demolition Utilities Verification
Verification that utilities are disconnected before demolition begins
- 2
Final
Site cleared, debris removed
See the full Lakewood inspection guide — scheduling & re-inspection fees →
Tips
- Demolition fees in Lakewood are flat-rate and scale with scope: $80.00 for interior demo/asbestos abatement, $140.00 for a single-family/duplex building plus its accessory buildings, and $255.00 for all other structures (commercial, multi-family, etc.).
- If removing an underground storage tank, get the West Metro Fire permit FIRST — Lakewood will not issue the demolition permit for UST removal without it.
- Budget for an asbestos survey/report before demolition, per State of Colorado requirements referenced in Lakewood's homeowner permit guidance.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lakewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lakewood
Demolition Permit in other cities
Compare demolition permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Lakewood project checklist
Describe your project once and get every permit, document, and fee it triggers in Lakewood — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →