Solar PV Permit in Lakewood, Colorado

Required for installation of rooftop or ground-mounted solar photovoltaic (PV) or thermal systems on residential and commercial properties in Lakewood. Applied for in eTRAKiT under Permit Type 'Alternative Energy' (New Residential / New Commercial / Remove and Reset PV / Remove and Reset Thermal / Wind or Other).

Verified 2026-07-01 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Solar PV / Alternative Energy Permit Fee — valuation-based (standard Building Permit Fee table)Assessed on the solar installation's valuation (labor + materials for panels, racking, inverter, and grid-interconnection electrical work) using Lakewood's standard Building Permit Fee table — $26.00 minimum (valuation $1.00-$500.00) scaling up to $5,570.15 for the first $1,000,000.00 plus $3.45 per additional $1,000.00VERIFIED — unlike Denver's published flat $50 PV fee, Lakewood has no Alternative-Energy-specific line in its Flat Fee Permits table, so Solar PV/thermal falls under the fee schedule's own governing rule: 'With the exception of the fees listed in the FLAT FEE PERMITS table, all building permit fees are based on total valuation including labor and materials.' Confirmed by re-fetching the full 2-page fee schedule PDF (Playwright browser-fetch past the Akamai/edgesuite WAF, then pdftotext -layout) and reading it in full — Alternative Energy/Solar is absent from the Flat Fee list (fence, water heater, furnace, A/C, evaporative cooler, siding, reroof, temp trailer, demolition, move-and-set) and absent from any separate solar fee table. A companion Electrical permit and inspection is also required for grid interconnection per 2023 NEC Article 690, separately fee-bearing on the same valuation-based schedule.

Review timeline

~00 business days

Typical estimate — confirm current times with the Lakewood building department

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before cover

  2. 2

    Final — Structural / Electrical

    Panel mounting, racking attachment, roof penetration sealing, and all electrical connections verified

Tips

Frequently asked questions

What permit type covers rooftop solar in Lakewood?
Solar PV and solar thermal installations are applied for under the 'Alternative Energy' permit type in eTRAKiT, with New Residential and New Commercial subtypes for new installs, and separate Remove and Reset subtypes for reinstalling existing systems during a reroof or repair.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lakewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Lakewood

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.