EV Charger / EVSE Permit — Lakewood, Colorado · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.lakewoodco.gov/Local-Government/Departments/Public-Works/Building-and-Construction-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Lakewood, Colorado
Electric vehicle charging equipment (EVSE) installation in Lakewood is processed as ordinary electrical work — a new 240V/Level 2 EV circuit requires the City's standard Electrical permit (eTRAKiT Permit Type 'Electrical', Commercial or Residential subtype) and a final inspection. No dedicated 'EV Charger' or 'Alternative Energy' subtype covers EVSE the way Lakewood's Alternative Energy permit type covers solar PV/thermal; billing follows the same valuation-based Building Permit Fee table used for the general Electrical Permit, since EVSE is not one of Lakewood's itemized Flat Fee Permits (fence, water heater/boiler, furnace, A/C, evaporative cooler, siding, reroof, temporary trailer, demolition, move-and-set).
Reviewed 2026-07-20 · Source
When you need this permit
- Electrical permit required for EVSE/EV charger circuit installation (eTRAKiT Permit Type 'Electrical', Commercial or Residential subtype), governed by the 2023 NEC as adopted by the City
- All electrical contractors and sub-contractors must be registered with the City of Lakewood via eTRAKiT, separate from their Colorado DORA electrical license/registration
- As owner-occupant of a single-family detached home, a homeowner may pull the electrical permit and self-perform EVSE circuit work by adding themselves as the contractor in eTRAKiT Owner-builder
- No dedicated EVSE/EV-charger fee line exists — EV chargers are not among Lakewood's itemized Flat Fee Permits, so the general valuation-based Building Permit Fee table applies, the same as for any other non-flat-fee electrical work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Lakewood Building Permit & Inspection Fee Schedule (effective Jan 1, 2021, the current published version) — EV chargers and EVSE are not itemized in the Flat Fee Permits table (fence, water… Show full citationHide
City of Lakewood Building Permit & Inspection Fee Schedule (effective Jan 1, 2021, the current published version) — EV chargers and EVSE are not itemized in the Flat Fee Permits table (fence, water heater, furnace, A/C, evaporative cooler, siding, reroof, temp trailer, demolition, move-and-set), so the schedule's own governing rule applies: 'With the exception of the fees listed in the FLAT FEE PERMITS table, all building permit fees are based on total valuation including labor and materials' — the same mechanism described on the general Electrical Permit entry. Note that www.lakewood.org 301-redirects to www.lakewoodco.gov (the same City of Lakewood, Colorado — not the separate City of Lakewood, Washington, which publishes a similarly-named fee schedule that does not apply here), and the fee-schedule PDF is not consistently reachable at either domain, with no archived copy available. Confirm current amounts with the Permit Counter (303-987-7500) before relying on them for budgeting.Review timeline
Inspection process
- 1
Rough-In
Wiring and conduit installed before walls closed, where applicable
- 2
Final
EVSE circuit, breaker/disconnect, and NEC Article 625 compliance verified; devices installed, panel labeled, system energized
See the full Lakewood inspection guide — scheduling & re-inspection fees →
Tips
- Lakewood has no dedicated EV-charger permit type or subtype — apply under the standard 'Electrical' permit type in eTRAKiT, the same as any other circuit installation.
- As a home-rule city with its own eTRAKiT-based building department (not deferring to the Colorado DORA State Electrical Board for permit issuance), Lakewood is a 'covered municipality' under HB24-1173 and was required to take a compliance action on EV charger permitting by December 31, 2025 — confirm directly with the City whether a distinct expedited process now applies before assuming the standard electrical-permit timeline governs.
- Single-family detached homeowners may self-perform and self-permit their own EVSE circuit work by adding themselves as the contractor for that system in eTRAKiT. Owner-builder
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Online permit portal
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lakewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Lakewood's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Lakewood yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Lakewood lands. Privacy.
Other permits in Lakewood
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Lakewood project checklist
Describe your project once and get every permit, document, and fee it triggers in Lakewood — in one checklist. Free, for any city and any number of projects.
Get started →