Residential Building Permit (New Construction) in Lakewood, Colorado

Required for new single-family detached homes, duplexes, townhomes, and new multi-family buildings in the City of Lakewood, plus new accessory dwelling units and modular/move-set residential buildings. Reviewed against the 2021 IRC/IBC with Lakewood Municipal Code Title 14 amendments. Applied for as 'Building Residential New' in eTRAKiT.

Verified 2026-06-30 · Source

When you need this permit

  • Apply via eTRAKiT (lakw-trk.aspgov.com/eTRAKiT); homeowners and contractors must first establish an eTRAKiT account
  • eTRAKiT Permit Subtypes under 'Building Residential New': New Single Family Detached, New Single Family Attached/Townhouse (3+ units), New Duplex, New Multi Family, New Accessory Dwelling Unit, New Modular or Move Set
  • Plans must comply with the 2021 IRC/IBC and Lakewood Title 14 amendments
  • Valuation must include labor and materials for all construction, including electrical/mechanical/plumbing systems
  • Plans may be required to be stamped by a Colorado-licensed design professional if the initial submittal doesn't demonstrate adequate code knowledge/constructability
  • As owner-occupant of a single-family detached home, a homeowner may pull the permit and self-perform (Homeowner as General Contractor); all other applicants must use a Lakewood-registered contractor Owner-builderContractor
  • Estimated use tax (3% of 50% of project valuation) is collected in addition to permit and plan review fees

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — valuation $1.00 to $500.00City of Lakewood Building Permit & Inspection Fee Schedule, effective Jan 1, 2021 (current published schedule as of 2026-06-30; the source document itself notes fees 'change periodically' — call 303-987-7500 to verify current amount)
$26.00
Building Permit Fee — valuation $501.00 to $2,000.00
$26.00 for the first $500.00 plus $3.45 for each additional $100.00 or fraction thereof
Building Permit Fee — valuation $2,001.00 to $25,000.00
$77.75 for the first $2,000.00 plus $13.80 for each additional $1,000.00 or fraction thereof
Building Permit Fee — valuation $25,001.00 to $50,000.00
$395.15 for the first $25,000.00 plus $9.20 for each additional $1,000.00 or fraction thereof
Building Permit Fee — valuation $50,001.00 to $100,000.00
$625.15 for the first $50,000.00 plus $6.90 for each additional $1,000.00 or fraction thereof
Building Permit Fee — valuation $100,001.00 to $500,000.00
$970.15 for the first $100,000.00 plus $5.75 for each additional $1,000.00 or fraction thereof
Building Permit Fee — valuation $500,001.00 to $1,000,000.00
$3,270.15 for the first $500,000.00 plus $4.60 for each additional $1,000.00 or fraction thereof
Building Permit Fee — valuation $1,000,001.00 and up
$5,570.15 for the first $1,000,000.00 plus $3.45 for each additional $1,000.00 or fraction thereof
Plan Review FeeMasterplan for single-family: initial use = 65% of permit fee; second and subsequent use of same masterplan = $325.00 each use
65% of the building permit fee
Estimated Use TaxCollected in addition to permit and plan review fees; valuation/use tax/permit fees are subject to audit
3% of 50% of the project valuation
Temporary Certificate of Occupancy
$1,000.00 initial issuance or extension ($500.00 refunded if converted to Final CO before TCO expiration)

Review timeline

Plan reviewTypical estimate — confirm current times with the Lakewood building department
~0–0 business days

How long did your Residential Building Permit (New Construction) permit actually take in Lakewood?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footings

    Before concrete pour — footings must extend below 36-inch frost depth

  2. 2

    Framing

    After framing complete, before insulation or wall cover

  3. 3

    MEP Rough-In

    Mechanical, electrical, and plumbing rough-in before walls closed

  4. 4

    Final

    All work complete; City issues Certificate of Occupancy for new home projects once all required inspections pass

See the full Lakewood inspection guide — scheduling & re-inspection fees →

Tips

  • Lakewood inspections scheduled through eTRAKiT by 7 a.m. are typically performed the same day (weekdays only); inspections can be scheduled up to 6 days in advance.
  • Frost depth in Lakewood is 36 inches — notably deeper than Denver's older code guidance; footings on all new construction must extend below this depth.
  • Wind design splits at the '10,000 West Block' (Kipling St.) line — properties west of Kipling require significantly higher wind design (up to 178 mph Vult Risk Cat III/IV) than east of it (up to 148 mph Vult). Confirm which side of this line your site falls on.
  • A homeowner may self-permit and self-perform a single-family DETACHED home build (not townhome/duplex/ADU by default) — contact the Permit Counter to confirm eligibility for your specific project.
  • The published Building Permit Fee Schedule is dated January 2021 and the document itself states fees change periodically — call 303-987-7500 or confirm live in eTRAKiT before budgeting a project.

Frequently asked questions

Lakewood requires a residential building permit (new construction) for: Apply via eTRAKiT (lakw-trk.aspgov.com/eTRAKiT); homeowners and contractors must first establish an eTRAKiT account; eTRAKiT Permit Subtypes under 'Building Residential New': New Single Family Detached, New Single Family Attached/Townhouse (3+ units), New Duplex, New Multi Family, New Accessory Dwelling Unit, New Modular or Move Set; Plans must comply with the 2021 IRC/IBC and Lakewood Title 14 amendments; Valuation must include labor and materials for all construction, including electrical/mechanical/plumbing systems; Plans may be required to be stamped by a Colorado-licensed design professional if the initial submittal doesn't demonstrate adequate code knowledge/constructability; As owner-occupant of a single-family detached home, a homeowner may pull the permit and self-perform (Homeowner as General Contractor); all other applicants must use a Lakewood-registered contractor; Estimated use tax (3% of 50% of project valuation) is collected in addition to permit and plan review fees. If your project isn't listed, confirm with City of Lakewood — Public Works Department, Permit Counter (Building Division) at 303-987-7500 before starting work.

In Lakewood, the published Building Permit Fee — valuation $1.00 to $500.00 is: $26.00. Additional published fees: Building Permit Fee — valuation $501.00 to $2,000.00 — $26.00 for the first $500.00 plus $3.45 for each additional $100.00 or fraction thereof; Building Permit Fee — valuation $2,001.00 to $25,000.00 — $77.75 for the first $2,000.00 plus $13.80 for each additional $1,000.00 or fraction thereof; Building Permit Fee — valuation $25,001.00 to $50,000.00 — $395.15 for the first $25,000.00 plus $9.20 for each additional $1,000.00 or fraction thereof; Building Permit Fee — valuation $50,001.00 to $100,000.00 — $625.15 for the first $50,000.00 plus $6.90 for each additional $1,000.00 or fraction thereof; Building Permit Fee — valuation $100,001.00 to $500,000.00 — $970.15 for the first $100,000.00 plus $5.75 for each additional $1,000.00 or fraction thereof; Building Permit Fee — valuation $500,001.00 to $1,000,000.00 — $3,270.15 for the first $500,000.00 plus $4.60 for each additional $1,000.00 or fraction thereof; Building Permit Fee — valuation $1,000,001.00 and up — $5,570.15 for the first $1,000,000.00 plus $3.45 for each additional $1,000.00 or fraction thereof; Plan Review Fee — 65% of the building permit fee; Estimated Use Tax — 3% of 50% of the project valuation; Temporary Certificate of Occupancy — $1,000.00 initial issuance or extension ($500.00 refunded if converted to Final CO before TCO expiration). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a residential building permit (new construction) in Lakewood typically runs 0–0 business days. This is an estimate, not a published figure — confirm current review times with City of Lakewood — Public Works Department, Permit Counter (Building Division) at 303-987-7500.

You'll need: Building Permit Application (via eTRAKiT); Construction Drawings; Site Plan. Depending on your project, Lakewood may also ask for: Homeowner Permit Agreement (if self-performing). See the required-documents checklist on this page for details on each.

Lakewood requires 4 inspection(s) for a residential building permit (new construction), in order: Foundation / Footings, Framing, MEP Rough-In, Final. Schedule each through City of Lakewood — Public Works Department, Permit Counter (Building Division) (303-987-7500).

Apply through City of Lakewood — Public Works Department, Permit Counter (Building Division) at 480 S. Allison Pkwy, Lakewood, CO 80226 (Civic Center North). Phone: 303-987-7500, email: permitcounter@lakewoodco.gov. Office hours: Contact Permit Counter at 303-987-7500; permits are applied for, tracked, and paid online through eTRAKiT (lakw-trk.aspgov.com/eTRAKiT). Official information: https://www.lakewoodco.gov/Local-Government/Departments/Public-Works/Building-and-Construction-Permits.

The City of Lakewood has adopted the 2021 International Building Code (IBC), 2021 IRC, and related 2021 I-Codes (IPC, IMC, IFGC, IECC, IEBC, IFC, ISPSC, IPMC), plus the 2023 National Electrical Code, per the City of Lakewood Codes and Loads permit handout. Local amendments are codified in Lakewood Municipal Code Title 14, adopted by City Council on May 8, 2023, effective June 30, 2023.

Yes, if you are the owner and occupant of a single-family DETACHED home performing the work yourself. You must establish an eTRAKiT account and complete a Homeowner Permit Agreement. Owner-occupants of townhomes/duplexes may qualify in some circumstances; LLCs, trusts, and corporations are never issued homeowner permits.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lakewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.