Dillon building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Dillon, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- County Commons, 0037 Peak One Drive, Frisco, CO 80443
- Phone
- (970) 668-3170
- Office hours
- Generally Monday-Friday 8:00 a.m.-5:00 p.m. (Wednesdays 10:00 a.m.-5:00 p.m. — the department is typically unavailable Wednesday mornings until 10:30 a.m. for a weekly staff meeting); Chief Building Official: Glen Morgan
- Website
- Official site
Published scheduling rules
- Building inspections can be scheduled online via eTRAKiT once your permit is issued. (Building Permit (New Construction / Foundation, Framing, Finish))
- This is a genuinely separate permit from anything the Town of Dillon or Summit County Building Inspection Department issues — Summit Fire & EMS District runs its own online AccessGov application, its own fee schedule, and its own inspection scheduling line, (970) 262-5215. (Fire Sprinkler and Fire Alarm System Permit (Summit Fire & EMS District))
- Cancelling a scheduled inspection within 24 hours, or an incomplete inspection, can trigger a re-inspection fee — confirm your system is truly ready before booking. (Fire Sprinkler and Fire Alarm System Permit (Summit Fire & EMS District))
- Inspections must be requested at least two business days in advance by calling (970) 262-5215 or using the District's online inspection-request tool; each permitted contractor must request inspections for that contractor's own scope of work (Fire Sprinkler and Fire Alarm System Permit (Summit Fire & EMS District))
- Incomplete inspections and cancellations within 24 hours of a scheduled inspection may incur a re-inspection fee (Fire Sprinkler and Fire Alarm System Permit (Summit Fire & EMS District))
Inspection sequence
Applies to: Building Permit (New Construction / Foundation, Framing, Finish)
- 1
Foundation / Footings
Before concrete pour
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Mechanical, electrical, and plumbing rough-in before walls closed
- 4
Final
All work complete, ready for Certificate of Occupancy
Applies to: Commercial Building Permit (including Tenant Improvement / Tenant Finish)
- 1
Foundation / Footings
Before concrete pour (new construction)
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Mechanical, electrical, and plumbing rough-in before walls closed
- 4
Final
All work complete per approved plans, ready for Certificate of Occupancy
Applies to: Building Permit — Addition, Remodel, Deck, Guard Replacement
- 1
Framing
After framing complete, before wall cover
- 2
MEP Rough-In
If mechanical, electrical, or plumbing work is part of the scope
- 3
Final
All work complete per approved plans
Applies to: Plumbing Permit
- 1
Underground / Under-slab
Before concrete pour — pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Electrical Permit
- 1
Rough-In
Wiring and conduit installed before walls closed
- 2
Final
All devices installed, panel labeled, system energized
Applies to: EV Charger / EVSE Permit (Standard Electrical Permit)
- 1
Rough-In
Wiring and conduit installed before walls closed (if applicable)
- 2
Final
Charger circuit/unit installed, breaker sized correctly, energized
Applies to: Fire Sprinkler and Fire Alarm System Permit (Summit Fire & EMS District)
- 1
Rough-In Inspection
Piping (sprinkler) or wiring/devices (alarm) visible and in place before concealment; each permitted contractor must request inspection of their own scope
- 2
Final Inspection (Sprinkler and Alarm, coordinated)
Fire sprinkler and fire alarm final inspections must be coordinated and scheduled for the same time per the District's own Permits page; certification letters required before final approval
Applies to: Mechanical Permit
- 1
Rough-In / Equipment
Equipment installation and ductwork before walls closed
- 2
Final
Equipment operational, combustion air and venting verified
Applies to: Photovoltaic (Solar) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, and all electrical connections verified
Final inspection only: Demolition Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Online permit portal
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dillon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Dillon building permits
Get alerts for Dillon
We'll email you when Dillon's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.