Mechanical Permit in Dillon, Colorado

Required for installation of furnaces and ducts, boilers and circulation piping, and exhaust fans and ducts in Dillon. Issued and inspected by the Summit County Building Inspection Department under the 2024 IMC series (as part of the 2024 I-Code adoption). Gas fireplaces, wood stoves, and outdoor fire pits are billed as a distinct Fireplace Permit.

Verified 2026-07-06 · Source

When you need this permit

  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office
  • Fee is total mechanical valuation multiplied by a constant of 0.0075, $65.00 minimum
  • Mechanical permit fees associated with an existing Building Permit must use the Building Permit's valuation to calculate fees
  • For new SFR/commercial projects, mechanical valuation is based on 10% of the project's total valuation
  • A separate Fireplace Permit (flat valuation x 0.0075, $65.00 minimum) applies to gas fireplaces, wood stoves, and outdoor fire pits — check the department's list of approved wood-burning devices

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mechanical Permit FeeSummit County Building Permit Fee Schedule; for new SFR/commercial work, valuation is based on 10% of total project valuation
Total mechanical valuation x 0.0075, $65.00 minimum
Fireplace Permit Fee (gas fireplace, wood stove, or outdoor fire pit)
Total fireplace valuation x 0.0075, $65.00 minimum
Plan Review Fee (when required)
65% of the mechanical permit fee, minimum $65.00 per hour

Review timeline

Plan review
Not published — contact the department

How long did your Mechanical Permit permit actually take in Dillon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In / Equipment

    Equipment installation and ductwork before walls closed

  2. 2

    Final

    Equipment operational, combustion air and venting verified

See the full Dillon inspection guide — scheduling & re-inspection fees →

Tips

  • Furnace, boiler, and exhaust-fan installations are billed at 0.75% of valuation with a $65.00 floor — get a written contractor valuation before applying so the fee is calculated correctly.
  • A wood-burning device (wood stove, fire pit) must be on Summit County's approved wood-burning devices list.

Frequently asked questions

Dillon requires a mechanical permit for: Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office; Fee is total mechanical valuation multiplied by a constant of 0.0075, $65.00 minimum; Mechanical permit fees associated with an existing Building Permit must use the Building Permit's valuation to calculate fees; For new SFR/commercial projects, mechanical valuation is based on 10% of the project's total valuation; A separate Fireplace Permit (flat valuation x 0.0075, $65.00 minimum) applies to gas fireplaces, wood stoves, and outdoor fire pits — check the department's list of approved wood-burning devices. If your project isn't listed, confirm with Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at (970) 668-3170 before starting work.

In Dillon, the published Mechanical Permit Fee is: Total mechanical valuation x 0.0075, $65.00 minimum. Additional published fees: Fireplace Permit Fee (gas fireplace, wood stove, or outdoor fire pit) — Total fireplace valuation x 0.0075, $65.00 minimum; Plan Review Fee (when required) — 65% of the mechanical permit fee, minimum $65.00 per hour. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dillon does not publish a plan-review timeline for this permit. Contact Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at (970) 668-3170 for current turnaround.

You'll need: Technical Permit Application (or Technical Permit Application Writeable). See the required-documents checklist on this page for details on each.

Dillon requires 2 inspection(s) for a mechanical permit, in order: Rough-In / Equipment, Final. Schedule each through Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) ((970) 668-3170).

Apply through Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at County Commons, 0037 Peak One Drive, Frisco, CO 80443. Phone: (970) 668-3170, email: Contact via Email link at summitcountyco.gov/services/community_development/building_inspection/index.php. Office hours: Generally Monday-Friday 8:00 a.m.-5:00 p.m. (Wednesdays 10:00 a.m.-5:00 p.m. — the department is typically unavailable Wednesday mornings until 10:30 a.m. for a weekly staff meeting); Chief Building Official: Glen Morgan. Official information: https://www.summitcountyco.gov/services/community_development/building_inspection/index.php.

Dillon, Colorado has adopted: 2024 International Building Code (IBC) series with local amendments — Summit County Building Inspection Department completed adoption of the 2024 I-Code series; per the department's live announcement (checked 2026-07-06), all plans submitted on or after July 1, 2026 must comply with the 2024 I-Codes; 2024 International Residential Code (IRC) with local amendments — part of the same 2024 I-Code series adoption; 2024 International Energy Conservation Code (IECC) with amendments — replaces the former 'Summit County Sustainable Code' option for single-family homes; the Sustainable Code is no longer an energy-compliance pathway as of this adoption, per the department's own announcement; Appendix REMP (Renewable Energy Mitigation Program) — added with the 2024 code adoption, per Summit County Building Inspection Department announcement; Appendix BC (Accessory Dwelling Units for existing construction) — added with the 2024 code adoption, per Summit County Building Inspection Department announcement; Colorado Wildfire Resiliency Code — any permit applied for on or after May 4, 2026 is subject to the newly adopted fire codes, including the updated sprinkler square-footage threshold; the full code is published by the Colorado Division of Fire Prevention & Control (dfpc.colorado.gov/colorado-wildfire-resiliency-code); Sprinkler requirement: all new residential structures 4,500 sq ft or greater must have fire sprinkler systems installed, per the Colorado Wildfire Resiliency Code as adopted by Summit County; Town of Dillon Municipal Code, Chapter 18 — the Town has, 'in conjunction with Summit County... in general adopted the 2018 series of Building Codes with amendments' at the town-code level; however, the Summit County Building Inspection Department (which actually performs plan review/inspection for Dillon) has since moved forward to the 2024 I-Code series described above — this is a genuine, honestly-flagged discrepancy between the Dillon Municipal Code's own text (last referencing 2018) and the county department's current live practice (2024, effective July 1, 2026); applicants should confirm the currently-enforced edition directly with Summit County Building Inspection at time of submittal. Local amendments apply — see the Dillon overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dillon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.