EV Charger / EVSE Permit (Standard Electrical Permit) in Dillon, Colorado
Installation of an electric vehicle charging station in Dillon is not a distinct permit type — it is billed and processed as ordinary electrical work through the Summit County Building Inspection Department's standard Technical Permit Application, the same process and fee schedule documented on this file's electrical-permit entry. Summit County's published Building Permit Fee Schedule (directly fetched and reviewed this session) has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item; a dedicated Level 2 charger circuit is billed under the same unit-area or valuation-based standalone electrical fee tiers used for any other electrical work. Summit County's Sustainability/Electric Vehicles page (which covers the County's own public charging infrastructure) likewise describes no dedicated EV-charger permitting process, fee, or land-use code, and does not reference Colorado's HB24-1173 (Electric Vehicle Charging System Permits, 2024) despite Summit County's population exceeding that law's 20,000-resident county threshold — no evidence of a HB24-1173-driven adoption of streamlined EV-charging land-use permitting was found published by the County as of this session.
Verified 2026-07-20 · Source
When you need this permit
- Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific EV charger installation also requires a Town Development Permit (e.g., if bundled with a larger project) — the same check documented on this file's electrical-permit entry
- Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office, the same form used for all standalone electrical work
- Confirmed directly against the Summit County Building Permit Fee Schedule: no distinct EV-charger/EVSE fee line exists; a dedicated charger circuit is billed under the standard unit-area (if part of a larger area calculation) or valuation-based 'All other electrical work' tiers
- Work must comply with the 2024 National Electrical Code series as adopted by Summit County (same code cited on this file's electrical-permit entry)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring and conduit installed before walls closed (if applicable)
- 2
Final
Charger circuit/unit installed, breaker sized correctly, energized
See the full Dillon inspection guide — scheduling & re-inspection fees →
Tips
- There is no distinct 'EV charger permit' in Dillon/Summit County — apply for a standard electrical permit via the Technical Permit Application; a dedicated charger circuit under $2,000 in valuation is billed at the flat $146.00 rate.
- Summit County's population exceeds the 20,000-resident threshold that would trigger mandatory compliance action under Colorado's HB24-1173 (EV Charging System Permits law) by December 31, 2025, but no published County adoption of the state's streamlined EV Charging Model Land Use Code or an opt-out ordinance was found — confirm current status directly with the County before assuming a streamlined process exists.
- Confirm with the Dillon Town Planner whether your specific project also needs a Town Development Permit before or alongside the Summit County electrical permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dillon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Dillon
EV Charger / EVSE Permit (Standard Electrical Permit) in other cities
Compare ev charger / evse permit (standard electrical permit) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Dillon project checklist
Describe your project once and get every permit, document, and fee it triggers in Dillon — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →