EV Charger / EVSE Permit (Standard Electrical Permit) in Dillon, Colorado

Installation of an electric vehicle charging station in Dillon is not a distinct permit type — it is billed and processed as ordinary electrical work through the Summit County Building Inspection Department's standard Technical Permit Application, the same process and fee schedule as the Electrical Permit entry. Summit County's published Building Permit Fee Schedule has NO distinct 'EV charger,' 'electric vehicle,' or 'EVSE' line item; a dedicated Level 2 charger circuit is billed under the same unit-area or valuation-based standalone electrical fee tiers used for any other electrical work. Summit County's Sustainability/Electric Vehicles page (which covers the County's own public charging infrastructure) likewise describes no dedicated EV-charger permitting process, fee, or land-use code, and does not reference Colorado's HB24-1173 (Electric Vehicle Charging System Permits, 2024) despite Summit County's population exceeding that law's 20,000-resident county threshold — the County has published no HB24-1173-driven adoption of streamlined EV-charging land-use permitting.

Verified 2026-07-20 · Source

When you need this permit

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific EV charger installation also requires a Town Development Permit (e.g., if bundled with a larger project) — the same check as for the Electrical Permit
  • Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office, the same form used for all standalone electrical work
  • The Summit County Building Permit Fee Schedule has no distinct EV-charger/EVSE fee line; a dedicated charger circuit is billed under the standard unit-area tier (where it is part of a larger area calculation) or under the valuation-based 'All other electrical work' tiers
  • Work must comply with the 2024 National Electrical Code series as adopted by Summit County (same code as the Electrical Permit entry)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

All other electrical work — valuation not more than $2,000.00 (typical dedicated EV charger circuit)Summit County Building Permit Fee Schedule — same flat fee as the Electrical Permit entry; no distinct EV-charger/EVSE line item exists
$146.00
All other electrical work — valuation more than $2,000.00 (e.g., charger install bundled with a panel upgrade)Summit County Building Permit Fee Schedule
$15.00 per $1,000 or fraction thereof plus $146.00
Initial plan reviewSummit County Building Permit Fee Schedule
65% of the electrical permit fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit (Standard Electrical Permit) permit actually take in Dillon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring and conduit installed before walls closed (if applicable)

  2. 2

    Final

    Charger circuit/unit installed, breaker sized correctly, energized

See the full Dillon inspection guide — scheduling & re-inspection fees →

Tips

  • There is no distinct 'EV charger permit' in Dillon/Summit County — apply for a standard electrical permit via the Technical Permit Application; a dedicated charger circuit under $2,000 in valuation is billed at the flat $146.00 rate.
  • Summit County's population exceeds the 20,000-resident threshold that would trigger mandatory compliance action under Colorado's HB24-1173 (EV Charging System Permits law) by December 31, 2025, but no published County adoption of the state's streamlined EV Charging Model Land Use Code or an opt-out ordinance was found — confirm current status directly with the County before assuming a streamlined process exists.
  • Confirm with the Dillon Town Planner whether your specific project also needs a Town Development Permit before or alongside the Summit County electrical permit.

Frequently asked questions

Dillon requires an ev charger / evse permit (standard electrical permit) for: Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific EV charger installation also requires a Town Development Permit (e.g., if bundled with a larger project) — the same check as for the Electrical Permit; Submit the Technical Permit Application in person at the Summit County Building Inspection Department Frisco office, the same form used for all standalone electrical work; The Summit County Building Permit Fee Schedule has no distinct EV-charger/EVSE fee line; a dedicated charger circuit is billed under the standard unit-area tier (where it is part of a larger area calculation) or under the valuation-based 'All other electrical work' tiers; Work must comply with the 2024 National Electrical Code series as adopted by Summit County (same code as the Electrical Permit entry). If your project isn't listed, confirm with Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at (970) 668-3170 before starting work.

In Dillon, the published All other electrical work — valuation not more than $2,000.00 (typical dedicated EV charger circuit) is: $146.00. Additional published fees: All other electrical work — valuation more than $2,000.00 (e.g., charger install bundled with a panel upgrade) — $15.00 per $1,000 or fraction thereof plus $146.00; Initial plan review — 65% of the electrical permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dillon does not publish a plan-review timeline for this permit. Contact Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at (970) 668-3170 for current turnaround.

You'll need: Technical Permit Application (or Technical Permit Application Writeable). See the required-documents checklist on this page for details on each.

Dillon requires 2 inspection(s) for an ev charger / evse permit (standard electrical permit), in order: Rough-In, Final. Schedule each through Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) ((970) 668-3170).

Apply through Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at County Commons, 0037 Peak One Drive, Frisco, CO 80443. Phone: (970) 668-3170, email: Contact via Email link at summitcountyco.gov/services/community_development/building_inspection/index.php. Office hours: Generally Monday-Friday 8:00 a.m.-5:00 p.m. (Wednesdays 10:00 a.m.-5:00 p.m. — the department is typically unavailable Wednesday mornings until 10:30 a.m. for a weekly staff meeting); Chief Building Official: Glen Morgan. Official information: https://www.summitcountyco.gov/services/community_development/building_inspection/index.php.

Dillon, Colorado has adopted: 2024 International Building Code (IBC) series with local amendments — Summit County Building Inspection Department completed adoption of the 2024 I-Code series; per the department's live announcement, all plans submitted on or after July 1, 2026 must comply with the 2024 I-Codes; 2024 International Residential Code (IRC) with local amendments — part of the same 2024 I-Code series adoption; 2024 International Energy Conservation Code (IECC) with amendments — replaces the former 'Summit County Sustainable Code' option for single-family homes; the Sustainable Code is no longer an energy-compliance pathway as of this adoption, per the department's own announcement; Appendix REMP (Renewable Energy Mitigation Program) — added with the 2024 code adoption, per Summit County Building Inspection Department announcement; Appendix BC (Accessory Dwelling Units for existing construction) — added with the 2024 code adoption, per Summit County Building Inspection Department announcement; Colorado Wildfire Resiliency Code — any permit applied for on or after May 4, 2026 is subject to the newly adopted fire codes, including the updated sprinkler square-footage threshold; the full code is published by the Colorado Division of Fire Prevention & Control (dfpc.colorado.gov/colorado-wildfire-resiliency-code); Sprinkler requirement: all new residential structures 4,500 sq ft or greater must have fire sprinkler systems installed, per the Colorado Wildfire Resiliency Code as adopted by Summit County; Town of Dillon Municipal Code, Chapter 18 — the Town has, 'in conjunction with Summit County... in general adopted the 2018 series of Building Codes with amendments' at the town-code level; however, the Summit County Building Inspection Department (which actually performs plan review/inspection for Dillon) has since moved forward to the 2024 I-Code series described above — this is a genuine, honestly-flagged discrepancy between the Dillon Municipal Code's own text (last referencing 2018) and the county department's current live practice (2024, effective July 1, 2026); applicants should confirm the currently-enforced edition directly with Summit County Building Inspection at time of submittal. Local amendments apply — see the Dillon overview page for the full list.

No. Summit County's Building Permit Fee Schedule has no distinct EV-charger or EVSE line item. An EV charging station circuit is billed as a standard electrical permit through the Summit County Building Inspection Department — typically the flat $146.00 fee for electrical work valued at $2,000 or less.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Online permit portal

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dillon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Dillon's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Dillon yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.