Demolition Permit in Dillon, Colorado

Required for the removal of structures and safe disconnection of utility services in Dillon. Issued by the Summit County Building Inspection Department. A Town of Dillon Development Permit is not explicitly listed among the Town's named Development Permit project types, but applicants should confirm with the Dillon Town Planner whether a demolition triggers Town-level review given the scope of the specific project.

Verified 2026-07-06 · Source

When you need this permit

  • Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific demolition project also requires a Town of Dillon Development Permit or Grading and Excavation Permit
  • Demolition permit authorizes removal of structures and safe disconnection of utility services to the structure
  • Submit in person at the Summit County Building Inspection Department Frisco office

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit FeeGAP: Summit County's live Building Permits page confirms a Demo Permit exists ('required for the removal of structures and safe disconnection of utility services') but the Building Permit Fee Schedule page does not list a distinct demolition fee tier separate from the general Building Permit Fee table; likely billed under the standard valuation-based Building Permit Fee schedule, but this was not explicitly confirmed in the source text and is not invented here
Not separately published on the Summit County Building Permit Fee Schedule as a distinct line item

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Dillon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Confirm structure removed, utilities safely disconnected

See the full Dillon inspection guide — scheduling & re-inspection fees →

Tips

  • Confirm utility disconnection requirements (gas and electric) with the respective utility purveyor before applying — Summit County's Demo Permit description explicitly ties the permit to 'safe disconnection of utility services.'

Frequently asked questions

Dillon requires a demolition permit for: Confirm with Dillon Town Planner Ned West, (970) 262-3421, whether the specific demolition project also requires a Town of Dillon Development Permit or Grading and Excavation Permit; Demolition permit authorizes removal of structures and safe disconnection of utility services to the structure; Submit in person at the Summit County Building Inspection Department Frisco office. If your project isn't listed, confirm with Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at (970) 668-3170 before starting work.

In Dillon, the published Demolition Permit Fee is: Not separately published on the Summit County Building Permit Fee Schedule as a distinct line item. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Dillon does not publish a plan-review timeline for this permit. Contact Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at (970) 668-3170 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Dillon requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) ((970) 668-3170).

Apply through Summit County Building Inspection Department (performing building-code review/inspection for the Town of Dillon under an intergovernmental services arrangement — not the Town's own department, and not the County's primary unincorporated-area jurisdiction) at County Commons, 0037 Peak One Drive, Frisco, CO 80443. Phone: (970) 668-3170, email: Contact via Email link at summitcountyco.gov/services/community_development/building_inspection/index.php. Office hours: Generally Monday-Friday 8:00 a.m.-5:00 p.m. (Wednesdays 10:00 a.m.-5:00 p.m. — the department is typically unavailable Wednesday mornings until 10:30 a.m. for a weekly staff meeting); Chief Building Official: Glen Morgan. Official information: https://www.summitcountyco.gov/services/community_development/building_inspection/index.php.

Dillon, Colorado has adopted: 2024 International Building Code (IBC) series with local amendments — Summit County Building Inspection Department completed adoption of the 2024 I-Code series; per the department's live announcement (checked 2026-07-06), all plans submitted on or after July 1, 2026 must comply with the 2024 I-Codes; 2024 International Residential Code (IRC) with local amendments — part of the same 2024 I-Code series adoption; 2024 International Energy Conservation Code (IECC) with amendments — replaces the former 'Summit County Sustainable Code' option for single-family homes; the Sustainable Code is no longer an energy-compliance pathway as of this adoption, per the department's own announcement; Appendix REMP (Renewable Energy Mitigation Program) — added with the 2024 code adoption, per Summit County Building Inspection Department announcement; Appendix BC (Accessory Dwelling Units for existing construction) — added with the 2024 code adoption, per Summit County Building Inspection Department announcement; Colorado Wildfire Resiliency Code — any permit applied for on or after May 4, 2026 is subject to the newly adopted fire codes, including the updated sprinkler square-footage threshold; the full code is published by the Colorado Division of Fire Prevention & Control (dfpc.colorado.gov/colorado-wildfire-resiliency-code); Sprinkler requirement: all new residential structures 4,500 sq ft or greater must have fire sprinkler systems installed, per the Colorado Wildfire Resiliency Code as adopted by Summit County; Town of Dillon Municipal Code, Chapter 18 — the Town has, 'in conjunction with Summit County... in general adopted the 2018 series of Building Codes with amendments' at the town-code level; however, the Summit County Building Inspection Department (which actually performs plan review/inspection for Dillon) has since moved forward to the 2024 I-Code series described above — this is a genuine, honestly-flagged discrepancy between the Dillon Municipal Code's own text (last referencing 2018) and the county department's current live practice (2024, effective July 1, 2026); applicants should confirm the currently-enforced edition directly with Summit County Building Inspection at time of submittal. Local amendments apply — see the Dillon overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dillon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.