Plumbing Permit in Frisco, Colorado

Required for installation, alteration, or repair of plumbing systems in Frisco. Issued by the Town's Building Division (administered by CBCS), not Summit County. Frisco conducts a distinctive 'contemporaneous review' of plumbing contractor licensure at time of inspection, per C.R.S. 12-58-114.5.

Verified 2026-07-06 · Source

When you need this permit

  • Permit required for plumbing installation, alteration, or repair, including water heater installation/replacement (product spec sheets required, except direct-vent equivalents are exempt in some Rapid Review contexts) and sewage ejectors
  • State-licensed plumbers only; the Town verifies DORA licensure directly with the state, and may perform a contemporaneous on-site review of the plumbing contractor's and any apprentices' licenses per C.R.S. 12-58-105 and 12-58-117 Contractor
  • Engineer's stamp required on plumbing plans for commercial projects
  • Plumbing can be applied for concurrently with a building permit application via CommunityCore

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit FeeTown of Frisco Comprehensive Fee Schedule (Dec 9, 2025), citing Frisco Town Code Section 65-13 D(1)
Determined by applying the project valuation to the corresponding Building Permit Valuation fee tiers
Plumbing Permit Plan Review FeeSeparate from and in addition to the permit fee; an additional plan review fee applies if submittal documents are incomplete or changed
65% of the plumbing permit fee
Building, Plumbing and Mechanical Combined Permit — valuation $1.00 to $500.00Applies when plumbing and mechanical work is bundled with a building permit under one combined valuation-based fee
$74.75

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Frisco?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Plumbing

    Requested after pipes installed and before concealment; inspector may conduct a contemporaneous licensure check of the plumbing contractor and any apprentices on site per C.R.S. 12-58

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

See the full Frisco inspection guide — scheduling & re-inspection fees →

Tips

  • Have your State Master Plumbing License and DORA registration ready at the jobsite — Frisco's contemporaneous review policy means an inspector can terminate an inspection on the spot and issue a correction notice if licensure can't be verified.
  • Bundling plumbing with a building permit under a single combined valuation uses a different (higher) fee table than a standalone plumbing permit — check the Comprehensive Fee Schedule's 'Building, Plumbing and Mechanical Combined' tiers versus standalone 'Plumbing Permit Fee' language before budgeting.

Frequently asked questions

Frisco requires a plumbing permit for: Permit required for plumbing installation, alteration, or repair, including water heater installation/replacement (product spec sheets required, except direct-vent equivalents are exempt in some Rapid Review contexts) and sewage ejectors; State-licensed plumbers only; the Town verifies DORA licensure directly with the state, and may perform a contemporaneous on-site review of the plumbing contractor's and any apprentices' licenses per C.R.S. 12-58-105 and 12-58-117; Engineer's stamp required on plumbing plans for commercial projects; Plumbing can be applied for concurrently with a building permit application via CommunityCore. If your project isn't listed, confirm with Town of Frisco Community Development Department, Building Division at 970-668-9128 before starting work.

In Frisco, the published Plumbing Permit Fee is: Determined by applying the project valuation to the corresponding Building Permit Valuation fee tiers. Additional published fees: Plumbing Permit Plan Review Fee — 65% of the plumbing permit fee; Building, Plumbing and Mechanical Combined Permit — valuation $1.00 to $500.00 — $74.75. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Frisco does not publish a plan-review timeline for this permit. Contact Town of Frisco Community Development Department, Building Division at 970-668-9128 for current turnaround.

You'll need: Plumbing Permit Application (CommunityCore, standalone or combined with Building Permit); Product spec sheets (water heaters, sewage ejectors). See the required-documents checklist on this page for details on each.

Yes. Per Colorado Revised Statutes 12-58-114.5, Frisco's Building Department conducts contemporaneous reviews verifying State-licensed plumbers' and apprentices' credentials directly against the DORA database at the time of inspection, and may terminate an inspection and issue a correction notice if licensure cannot be verified.

Apply through Town of Frisco Community Development Department, Building Division at Frisco Town Hall, 1 East Main Street, P.O. Box 4100, Frisco, CO 80443. Phone: 970-668-9128, email: TOFPermits@townoffrisco.com. Office hours: Monday-Friday, 8:00 AM - 5:00 PM. Building permit administration is contracted to a third-party firm, Comprehensive Building Code Services, LLC (CBCS), since August 2024, when the Town's in-house Building Division was dissolved. CBCS contacts: Kara Fine, Contracted Permit Technician, 303-910-2966 / TOFPermits@townoffrisco.com; John C. Schumacher, Jr., CBO (CBCS owner), 303-550-2731. Community Development main line 970-668-5276; Planning Division 970-668-9131.. Official information: https://www.friscogov.com/departments/community-development/building-division/.

Frisco, Colorado has adopted: The Town of Frisco currently uses the 2018 International Code Council (ICC) code family — Town of Frisco Building Permits & Plan Review page states verbatim: 'The Town of Frisco currently uses the 2018 International Code Council codes.' (International Building Code, International Residential Code, and related I-Codes; specific IECC/IMC/IPC/IFC edition years beyond '2018 ICC family' are not individually broken out on the Town's public pages — local amendments live in Frisco Town Code Chapter 65, Building Construction and Housing Standards, which is hosted on Municode (library.municode.com/co/frisco) but renders as a JavaScript single-page app that could not be retrieved as readable text via direct fetch, browser-header curl, or the Wayback Machine snapshot (which mirrors the same JS shell) during this research session — flagged as an open item below rather than guessed at.); Summit Sustainable Building Code (SSBC) — adopted by Town Council Ordinance 20-04 on April 14, 2020, as an 'above-code' energy standard layered on top of the 2018 ICC base codes. Source: Town of Frisco Building Permits & Plan Review page.; National Electrical Code (NEC) — electrical permits and their governing NEC edition are administered entirely by Summit County Building Inspection Division, not the Town; edition not independently confirmed on the Town's own pages (see localAmendments).. Local amendments apply — see the Frisco overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Frisco building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.