Commercial Building Permit in Frisco, Colorado

Required for new commercial construction, additions, alterations/repairs to existing commercial buildings (including re-siding a commercial or multi-family structure), change in use or occupancy, moving, and demolition within Frisco town limits. Reviewed under the 2018 ICC code family (IBC) as locally amended by Frisco Town Code Chapter 65, plus the Summit Sustainable Building Code (SSBC, Ordinance 20-04) energy overlay requiring new commercial construction to demonstrate 25% energy savings above an ASHRAE 90.1 Energy Cost Budget baseline. Administered by the Town's Community Development Department via its contracted provider, Comprehensive Building Code Services, LLC (CBCS) — not Summit County — and submitted through the CommunityCore online portal. Tenant improvements are NOT a separate permit type in Frisco; they run through this same Building Permit track (see tips).

Verified 2026-08-02 · Source

When you need this permit

  • Building Permit required for 'New building construction,' 'Additions, alterations, and repairs to existing buildings (including re-roofing a structure, replacing window or door units, and re-siding a commercial or multi-family structure),' and 'Change in use or occupancy of existing buildings' — per the Town's Building Permits page
  • Summit Sustainable Building Code (Ordinance 20-04): 'All new commercial construction must demonstrate 25% energy savings above a baseline building energy model developed using ASHRAE 90.1 Energy Cost Budget protocol' — applies to all new commercial building applications since July 1, 2020
  • Proof of Registration in LEED, Green Globe, or other program required for new construction or additions (IBC), per the Building Permit Submittal Requirements PDF
  • 4 sets of plans to scale, including 1 set of structural plans stamped by a Colorado-licensed architect or engineer, plus a set of plans uploaded on CommunityCore
  • Structural Calculations required for commercial projects
  • Soils Investigation Report required for new construction and additions
  • Signed Construction Management Plan and Standards (erosion control, noise, construction hours 7am-7pm Mon-Sat, fencing, dust/traffic control) required before permit issuance
  • Engineer's stamp required on all mechanical and plumbing plans for commercial projects
  • Contractor must hold a current Town of Frisco Business License (no town contractor's license required) Contractor
  • If Planning Commission/Planning Division approval is required, plans must be submitted to the Planning Division for review PRIOR to Building Permit issuance
  • Plan review fees are due at the time of application — CommunityCore requires at least a partial payment of the plan review fee at submission; only complete applications are accepted
  • Electrical permit for the project is issued separately by Summit County Building Inspection Division, not the Town
  • A separate Summit Fire & EMS permit (its own fee, submitted at summitfire.org) is independently required for new construction, tenant finish/remodels, occupancy/owner changes, and fire detection/suppression systems
  • Valuation of work set per Frisco Town Code Section 65-12 A(3) — the Building Official has final authority on permit valuation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 7 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Valuation Fee — $1.00 to $500.00Town of Frisco Comprehensive Fee Schedule, Adoption Date December 9, 2025 — the same valuation-based Building Permit Fee table applies to commercial and residential work; there is no separate commercial fee table
$65.00
Building Permit Valuation Fee — $500.01 to $2,000.00
$65.00 for the first $500.00 plus $1.60 for each additional $100.00, or fraction thereof, to and including $2,000.00
Building Permit Valuation Fee — $2,000.01 to $25,000.00
$89.00 for the first $2,000.00 plus $18.20 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
Building Permit Valuation Fee — $25,000.01 to $50,000.00
$507.60 for the first $25,000.00 plus $13.13 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
Building Permit Valuation Fee — $50,000.01 to $100,000.00
$835.85 for the first $50,000.00 plus $9.10 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
Building Permit Valuation Fee — $100,000.01 to $500,000.00
$1,290.89 for the first $100,000.00 plus $7.28 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
Building Permit Valuation Fee — $500,000.01 to $1,000,000.00
$4,202.89 for the first $500,000.00 plus $6.18 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
Building Permit Valuation Fee — $1,000,000.01 and up
$7,292.89 for the first $1,000,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof
Building Permit Plan Review FeeThe Town's Building Permits & Plan Review page confirms building permits carry both a plan review fee and a building permit fee, and the Building Permit Submittal Requirements PDF states plan review fees are due at application. Unlike mechanical and plumbing (each explicitly 65% of the permit fee per the Comprehensive Fee Schedule), the Dec 9, 2025 Comprehensive Fee Schedule does not publish the building-permit plan-review percentage — confirm the exact figure with CBCS before budgeting rather than assuming the ICC-standard 65%
Charged separately from and in addition to the building permit fee; due at time of application
Impact Fee — Commercial/Industrial StructuresTown of Frisco Comprehensive Fee Schedule, Adoption Date December 9, 2025
$2.00 per square foot
Additional plan review (incomplete or changed submittal documents)Or the total hourly cost to the jurisdiction, whichever is greater, per the Comprehensive Fee Schedule
$135.00 per hour (minimum charge — one hour)

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Frisco?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Rough Frame / Rough Mechanical / Rough Plumbing

    Framing, plumbing, and mechanical rough-in inspected before concealment; electrical rough-in is inspected separately by Summit County Building Inspection Division

  3. 3

    Final Inspection

    All work complete per approved plans; inspections requested online via CommunityCore before 4:00 PM are conducted the next business day. Summit Fire & EMS conducts its own inspections under its separate permit

See the full Frisco inspection guide — scheduling & re-inspection fees →

Tips

  • Tenant improvement is NOT a separate permit type in Frisco — tenant finish, interior alterations, and change-of-occupancy projects all run through this same Building Permit track via CommunityCore. The practical distinction is in review speed: CBCS's published first-comments schedule splits 'Small/Minor Commercial' (11 business days) from 'Large Commercial' (21 business days), and a typical downtown Main Street tenant finish will fall in the small/minor commercial queue.
  • Budget for the Summit Sustainable Building Code early: new commercial construction must demonstrate 25% energy savings above an ASHRAE 90.1 Energy Cost Budget baseline model, and the submittal checklist requires proof of registration in LEED, Green Globe, or another program for new construction or additions — this is genuinely above-code and affects design cost, not just paperwork.
  • Plan for TWO parallel permit tracks on tenant finishes and new commercial construction: the Town/CBCS building permit AND a separate Summit Fire & EMS permit (own fee, submitted at summitfire.org) — SFE review covers tenant finish/remodels, occupancy/owner changes, and fire detection/suppression systems and is not bundled into the Town permit.
  • Frisco's in-house Building Division was dissolved in August 2024 — commercial plan review and permit administration run through Comprehensive Building Code Services, LLC (Kara Fine, 303-910-2966, info@cbcscode.com), not town staff. Electrical permits for the project still go separately to Summit County Building Inspection Division (County Commons, 0037 Peak One Drive).
  • If your project needs Planning Commission or Planning Division approval (common for new commercial buildings and exterior changes in the downtown core), that approval must be secured BEFORE the building permit can be issued — sequence it first.
  • Commercial re-roofs and commercial/multi-family re-siding qualify for the faster Rapid Review Joint Application track (3-business-day target) rather than this full commercial building-permit process — check that list before assuming the slower track applies.
  • The Comprehensive Fee Schedule publishes the exact plan-review percentage only for mechanical and plumbing permits (65% each) — the building-permit plan-review fee is confirmed to exist and be due at application, but its percentage is not published; confirm with CBCS before budgeting.

Frequently asked questions

Frisco requires a commercial building permit for: Building Permit required for 'New building construction,' 'Additions, alterations, and repairs to existing buildings (including re-roofing a structure, replacing window or door units, and re-siding a commercial or multi-family structure),' and 'Change in use or occupancy of existing buildings' — per the Town's Building Permits page; Summit Sustainable Building Code (Ordinance 20-04): 'All new commercial construction must demonstrate 25% energy savings above a baseline building energy model developed using ASHRAE 90.1 Energy Cost Budget protocol' — applies to all new commercial building applications since July 1, 2020; Proof of Registration in LEED, Green Globe, or other program required for new construction or additions (IBC), per the Building Permit Submittal Requirements PDF; 4 sets of plans to scale, including 1 set of structural plans stamped by a Colorado-licensed architect or engineer, plus a set of plans uploaded on CommunityCore; Structural Calculations required for commercial projects; Soils Investigation Report required for new construction and additions; Signed Construction Management Plan and Standards (erosion control, noise, construction hours 7am-7pm Mon-Sat, fencing, dust/traffic control) required before permit issuance; Engineer's stamp required on all mechanical and plumbing plans for commercial projects; Contractor must hold a current Town of Frisco Business License (no town contractor's license required); If Planning Commission/Planning Division approval is required, plans must be submitted to the Planning Division for review PRIOR to Building Permit issuance; Plan review fees are due at the time of application — CommunityCore requires at least a partial payment of the plan review fee at submission; only complete applications are accepted; Electrical permit for the project is issued separately by Summit County Building Inspection Division, not the Town; A separate Summit Fire & EMS permit (its own fee, submitted at summitfire.org) is independently required for new construction, tenant finish/remodels, occupancy/owner changes, and fire detection/suppression systems; Valuation of work set per Frisco Town Code Section 65-12 A(3) — the Building Official has final authority on permit valuation. If your project isn't listed, confirm with Town of Frisco Community Development Department, Building Division at 970-668-9128 before starting work.

In Frisco, the published Building Permit Valuation Fee — $1.00 to $500.00 is: $65.00. Additional published fees: Building Permit Valuation Fee — $500.01 to $2,000.00 — $65.00 for the first $500.00 plus $1.60 for each additional $100.00, or fraction thereof, to and including $2,000.00; Building Permit Valuation Fee — $2,000.01 to $25,000.00 — $89.00 for the first $2,000.00 plus $18.20 for each additional $1,000.00, or fraction thereof, to and including $25,000.00; Building Permit Valuation Fee — $25,000.01 to $50,000.00 — $507.60 for the first $25,000.00 plus $13.13 for each additional $1,000.00, or fraction thereof, to and including $50,000.00; Building Permit Valuation Fee — $50,000.01 to $100,000.00 — $835.85 for the first $50,000.00 plus $9.10 for each additional $1,000.00, or fraction thereof, to and including $100,000.00; Building Permit Valuation Fee — $100,000.01 to $500,000.00 — $1,290.89 for the first $100,000.00 plus $7.28 for each additional $1,000.00, or fraction thereof, to and including $500,000.00; Building Permit Valuation Fee — $500,000.01 to $1,000,000.00 — $4,202.89 for the first $500,000.00 plus $6.18 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00; Building Permit Valuation Fee — $1,000,000.01 and up — $7,292.89 for the first $1,000,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof; Building Permit Plan Review Fee — Charged separately from and in addition to the building permit fee; due at time of application; Impact Fee — Commercial/Industrial Structures — $2.00 per square foot; Additional plan review (incomplete or changed submittal documents) — $135.00 per hour (minimum charge — one hour). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

CBCS publishes first-comment turnaround targets of 11 business days for small/minor commercial projects, 21 business days for large commercial projects, and 'as agreed upon' for projects over $25 million. These are initial-review figures, not full-approval guarantees — larger or incomplete submittals requiring revision cycles will take longer.

You'll need: Building Permit Application (CommunityCore Online Portal); Commercial Plans (4 sets to scale); Structural Calculations; Proof of Registration in LEED, Green Globe, or other Program; Soils Investigation Report; Construction Management Plan and Standards (signed); Summit Fire & EMS Permit Application (separate parallel track). See the required-documents checklist on this page for details on each.

Apply through Town of Frisco Community Development Department, Building Division at Frisco Town Hall, 1 East Main Street, P.O. Box 4100, Frisco, CO 80443. Phone: 970-668-9128, email: TOFPermits@townoffrisco.com. Office hours: Monday-Friday, 8:00 AM - 5:00 PM. Building permit administration is contracted to a third-party firm, Comprehensive Building Code Services, LLC (CBCS), since August 2024, when the Town's in-house Building Division was dissolved. CBCS contacts: Kara Fine, Contracted Permit Technician, 303-910-2966 / TOFPermits@townoffrisco.com; John C. Schumacher, Jr., CBO (CBCS owner), 303-550-2731. Community Development main line 970-668-5276; Planning Division 970-668-9131.. Official information: https://www.friscogov.com/departments/community-development/building-division/.

No. Tenant finish, interior alterations, and change-of-occupancy projects are processed under the standard Building Permit ('additions, alterations, and repairs to existing buildings' and 'change in use or occupancy' are explicitly listed as requiring one). The Town's contracted reviewer, CBCS, does distinguish small/minor commercial (11 business days to first comments) from large commercial (21 business days) in its published review schedule, and a separate Summit Fire & EMS permit is required for tenant finish/remodel work.

The Town of Frisco, via its Community Development Department — but administration has been contracted to a third-party firm, Comprehensive Building Code Services, LLC (CBCS), since the Town's in-house Building Division was dissolved in August 2024. Summit County's Building Inspection Division only handles the electrical (and solar) permits for the project, not the building permit itself.

On top of the 2018 ICC codes, the Summit Sustainable Building Code (Ordinance 20-04) requires all new commercial construction to demonstrate 25% energy savings above a baseline building energy model developed using the ASHRAE 90.1 Energy Cost Budget protocol, effective for all new commercial applications since July 1, 2020, and the submittal checklist requires proof of registration in LEED, Green Globe, or another program.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Frisco.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.