Silverthorne building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Silverthorne, Colorado.
Verified 2026-07-13 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 601 Center Circle, P.O. Box 1309, Silverthorne, CO 80498
- Phone
- 970-262-7360
- Office hours
- Monday through Friday, 8 a.m. to 5 p.m.; building permit submittal appointments required (per Community Development FAQ). Town Hall main line (970) 262-7300; Community Development/Building direct line (970) 262-7360. Electrical permits are handled separately by the Summit County Building Department, 0037 Peak One Drive / 37 S.C.R. 1005, Frisco, CO, (970) 668-3170.
- Website
- Official site
Published scheduling rules
- Building inspection requests go through the SmartGov portal by 5 p.m. the day before, but Town-specific final inspections (Engineering/Water-Sewer/Planning) must instead be emailed to buildinginfo@silverthorne.org at least 48 hours in advance — don't assume one channel covers both. (New Residential Construction Building Permit (SFR Attached and Detached))
- If your CO is targeted for November through April, budget for the 150% landscaping-security requirement before that inspection can be scheduled. (New Residential Construction Building Permit (SFR Attached and Detached))
- Sprinkler and fire-alarm final inspections must be scheduled together, not separately — coordinate your contractors so both trades are ready for the same inspection date. (Fire Sprinkler / Fire Alarm System Permit)
- Fire sprinkler and alarm final inspections must be coordinated and scheduled for the same time; inspections requested at least two business days in advance via the Inspection Request portal or (970) 262-5215 (Fire Sprinkler / Fire Alarm System Permit)
- Two separate advance-notice windows apply to inspections: SmartGov-portal building inspection requests need to be made by 5 p.m. the prior business day, but Town-specific final inspections (Engineering, Water/Sewer, Planning) must be emailed to buildinginfo@silverthorne.org at least 48 hours (two business days) in advance — a stricter, separate lead time from the general inspection-request channel. (General)
Inspection sequence
Applies to: New Residential Construction Building Permit (SFR Attached and Detached)
- 1
Foundation / Footing
Performed by Summit County Building Department; a stamped Setback ILC must be submitted to the Town Planning Department at least 24 hours before this inspection is requested
- 2
Foundation Drain / Damp-Proofing / Waterproofing / Foundation Insulation
Must be inspected separately per Town amendment
- 3
Framing
Performed by Summit County Building Department; a Height ILC is required 24 hours in advance for structures near maximum building height
- 4
Final Inspection (Town Engineering, Water/Sewer, Planning)
Town of Silverthorne conducts its own final inspections (Engineering, Water/Sewer, Planning) prior to Certificate of Occupancy; request by email at least two business days in advance
Applies to: Accessory Dwelling Unit / Single Apartment Building Permit
- 1
Foundation (attached/detached new construction)
Performed by Summit County Building Department; not applicable to the remodel-of-existing-home ADU sub-type unless new footings are involved
- 2
Rough Frame / Rough Trades
Framing and trade rough-ins before concealment
- 3
Final Inspection
Town final inspections (Planning/Engineering as applicable) plus Summit County final building inspection
- 1
Foundation / Footing
Performed by the Building Department that reviewed and approved the plans (Summit County Building Department per the Town-wide intergovernmental arrangement)
- 2
Framing
Per the same review-and-inspect department as plan review
- 3
Final Inspection (Town Engineering, Water/Sewer, Planning, plus Building Code final)
The department that reviewed and approved the building permit plans also conducts the final inspections prior to CO/Completion. Building inspection requests are made via the SmartGov portal by 4 p.m. the business day before the desired inspection, per the Permit Process accordion pages. This is not a residential-vs-commercial split with the 5 p.m. cutoff shown elsewhere on the Town's site: the Town's dedicated Inspections page states the SmartGov cutoff as 5 p.m. ('Inspections may be scheduled up to 5 p.m. the business day before the inspection') while also announcing 'On 8/14/26 the cut off time for inspections will change to 4 p.m. the day before the inspection,' alongside a vendor change: 'As of 8/17/26 we will be using Comprehensive Building Code Services for all Building Department inspections and plan review' (replacing the Summit County Building Department in that role). The Permit Process by Project Type accordion pages — residential and commercial alike — already show the post-8/14/26 value (4 p.m.) site-wide, while the Inspections page shows the pre-8/14/26 value (5 p.m.) alongside the change notice. The differing times are a same-site publishing lag around a real, dated policy/vendor transition — the 5 p.m. cutoff applies before 8/14/26 and the 4 p.m. cutoff from 8/14/26 — not a permit-type conflict.
Applies to: Residential Addition / Remodel Building Permit
- 1
Foundation (additions with new footings)
Performed by Summit County Building Department
- 2
Rough Frame / Rough Trades
Framing, electrical, plumbing, mechanical rough-ins before concealment
- 3
Final Inspection
Town final inspections (Engineering/Water-Sewer/Planning where applicable) plus Summit County final building inspection
- 1
Rough Trades (electrical/plumbing/mechanical, as applicable to scope)
Before concealment; scope-dependent since TI submittal is not a full new-construction package
- 2
Final Inspection
The department that reviewed and approved the building permit plans also conducts the final inspections prior to CO/Completion. Building inspection requests go through the SmartGov portal by 4 p.m. the day before the desired inspection, per the Commercial Remodels accordion page. An apparent 4 p.m./5 p.m. discrepancy between the Town's pages reflects a dated, site-wide policy/vendor change, not a permit-type split: the Town's Inspections page states the SmartGov cutoff was 5 p.m. until 8/14/26, when it changed to 4 p.m., alongside a vendor transition to Comprehensive Building Code Services effective 8/17/26 (replacing the Summit County Building Department for Building Code plan review/inspections). The Permit Process accordion pages — including this one — show the post-8/14/26 value (4 p.m.).
Applies to: Electrical Permit
- 1
Rough Electrical
Performed by Summit County Building Department before concealment
- 2
Final Electrical
Performed by Summit County Building Department; system energized and verified
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical (if applicable)
Performed by Summit County Building Department before concealment
- 2
Final Electrical
Performed by Summit County Building Department; charging circuit energized and verified
Applies to: Residential Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Residential Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment; manufacturer specs must be posted on-site
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silverthorne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Silverthorne building permits
Get alerts for Silverthorne
We'll email you when Silverthorne's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.