Inspection sequence, scheduling, and re-inspection fees for building permits in Silverthorne, Colorado.

Verified 2026-07-13 · Source

How to schedule

Inspections are requested through the building department below.

Address
601 Center Circle, P.O. Box 1309, Silverthorne, CO 80498
Phone
970-262-7360
Office hours
Monday through Friday, 8 a.m. to 5 p.m.; building permit submittal appointments required (per Community Development FAQ). Town Hall main line (970) 262-7300; Community Development/Building direct line (970) 262-7360. Electrical permits are handled separately by the Summit County Building Department, 0037 Peak One Drive / 37 S.C.R. 1005, Frisco, CO, (970) 668-3170.

Published scheduling rules

  • Building inspection requests go through the SmartGov portal by 5 p.m. the day before, but Town-specific final inspections (Engineering/Water-Sewer/Planning) must instead be emailed to buildinginfo@silverthorne.org at least 48 hours in advance — don't assume one channel covers both. (New Residential Construction Building Permit (SFR Attached and Detached))
  • If your CO is targeted for November through April, budget for the 150% landscaping-security requirement before that inspection can be scheduled. (New Residential Construction Building Permit (SFR Attached and Detached))
  • Two separate advance-notice windows apply to inspections: SmartGov-portal building inspection requests need to be made by 5 p.m. the prior business day, but Town-specific final inspections (Engineering, Water/Sewer, Planning) must be emailed to buildinginfo@silverthorne.org at least 48 hours (two business days) in advance — a stricter, separate lead time from the general inspection-request channel. (General)

Inspection sequence

Applies to: New Residential Construction Building Permit (SFR Attached and Detached)

  1. 1

    Foundation / Footing

    Performed by Summit County Building Department; a stamped Setback ILC must be submitted to the Town Planning Department at least 24 hours before this inspection is requested

  2. 2

    Foundation Drain / Damp-Proofing / Waterproofing / Foundation Insulation

    Must be inspected separately per Town amendment

  3. 3

    Framing

    Performed by Summit County Building Department; a Height ILC is required 24 hours in advance for structures near maximum building height

  4. 4

    Final Inspection (Town Engineering, Water/Sewer, Planning)

    Town of Silverthorne conducts its own final inspections (Engineering, Water/Sewer, Planning) prior to Certificate of Occupancy; request by email at least two business days in advance

Applies to: Accessory Dwelling Unit / Single Apartment Building Permit

  1. 1

    Foundation (attached/detached new construction)

    Performed by Summit County Building Department; not applicable to the remodel-of-existing-home ADU sub-type unless new footings are involved

  2. 2

    Rough Frame / Rough Trades

    Framing and trade rough-ins before concealment

  3. 3

    Final Inspection

    Town final inspections (Planning/Engineering as applicable) plus Summit County final building inspection

Applies to: Residential Addition / Remodel Building Permit

  1. 1

    Foundation (additions with new footings)

    Performed by Summit County Building Department

  2. 2

    Rough Frame / Rough Trades

    Framing, electrical, plumbing, mechanical rough-ins before concealment

  3. 3

    Final Inspection

    Town final inspections (Engineering/Water-Sewer/Planning where applicable) plus Summit County final building inspection

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Performed by Summit County Building Department before concealment

  2. 2

    Final Electrical

    Performed by Summit County Building Department; system energized and verified

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical (if applicable)

    Performed by Summit County Building Department before concealment

  2. 2

    Final Electrical

    Performed by Summit County Building Department; charging circuit energized and verified

Applies to: Residential Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Residential Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment; manufacturer specs must be posted on-site

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Silverthorne building permits

Get alerts for Silverthorne

We'll email you when Silverthorne's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.