Sign Permit — Silverthorne, Colorado · Requirements sheet
Verified 2026-08-14 · Source: https://www.silverthorne.org/town-government/community-development/planning/signs-and-banners
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Silverthorne, Colorado
Required for any new sign, or any change to an existing sign, in Silverthorne, per the Town's dedicated Signs and Banners page (Community Development / Planning). Planning reviews all sign permit applications and inspects signs once installed. Commercial signs are additionally governed by location and the Sign District in which they sit, and any property applying for a sign permit must first have an approved Comprehensive Sign Plan on file with the Community Development Department (Town Code Sec. 4-9-13). Temporary banners are a related, separate permit category.
Verified 2026-08-14 · Source
When you need this permit
- Any new sign, or any change to an existing sign, requires a sign permit
- Planning reviews all sign permit applications and inspects signs once they are installed
- Any property applying for a sign permit must have an approved Comprehensive Sign Plan on file; if the property does not already have one, see Sec. 4-9-13 of the Town's Sign Code for requirements — comprehensive sign plans are compiled by building owners and kept on file with the Community Development Department
- Commercial signs are governed by location and the Sign District in which the property sits
- Submittal documents required for staff review: landowner authorization letter; one complete scalable drawing showing size, shape, design, materials, colors, site plan, building elevations, specific sign location, copy, mounting method, and lighting; building elevations (for wall signs); site plan (for freestanding signs)
- Temporary banners are a related, separate permit: one banner per address, maximum 32 sq ft, maximum 18 weeks per year (in one-week intervals), attached to a permanent structure on all four corners, per Town Code Sec. 4-9-5(h)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Sign Installation Inspection
Planning inspects signs once they are installed
See the full Silverthorne inspection guide — scheduling & re-inspection fees →
Tips
- A sign permit in Silverthorne requires an approved Comprehensive Sign Plan on file for the property FIRST — if your building doesn't already have one, budget time to compile and submit it under Sec. 4-9-13 before your individual sign permit can be approved.
- The $2/sq ft sign fee is based on total sign area, so get an accurate area measurement (not just face dimensions) before budgeting.
- Banners are billed weekly ($15/week, up to 18 weeks/year) and capped at 32 sq ft, one per address — a materially different fee mechanism from the per-square-foot permanent sign fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silverthorne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Silverthorne
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Silverthorne project checklist
Describe your project once and get every permit, document, and fee it triggers in Silverthorne — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →