EV Charger / EVSE Permit in Silverthorne, Colorado

Silverthorne has no distinct electric-vehicle-charging-station permit type or fee line-item. As with all other electrical work in Town, an EV charger (EVSE) circuit is permitted and inspected entirely by the Summit County Building Department, not the Town of Silverthorne — the Town does not intake, fee, or issue electrical permits at all. Summit County's published Building Permit Fee Schedule has no separate EV/EVSE line-item; EV charger installs are billed under the same square-footage/dwelling-unit-based Electrical Permit Fee tiers used for any other electrical circuit addition (same fee mechanism documented in this file's Electrical Permit entry). Summit County's population (~30,000) exceeds the 20,000-population threshold in Colorado HB24-1173, meaning the County was required to adopt, by 12/31/2025, an ordinance either adopting the Colorado Energy Office's EV Charger Permitting Model Code, establishing its own objective EV-charger permitting standards, or affirming continued use of its existing review process — no County ordinance or public confirmation of which of the three compliance paths Summit County chose was located as of this review.

Verified 2026-07-20 · Source

When you need this permit

  • EV charger (EVSE) circuit/panel work must be submitted directly to the Summit County Building Department (37 S.C.R. 1005, Frisco, CO), not to the Town of Silverthorne, per the same Outside Agency Permits routing documented for all electrical work in Town
  • Governed by the 2023 NFPA 70 National Electrical Code as adopted (same code cited in this file's Electrical Permit entry)
  • No EV/EVSE-specific line-item appears on Summit County's published Building Permit Fee Schedule; the general residential Electrical Permit Fee (based on total building area and number of dwelling units) applies
  • Summit County (population >20,000) is a 'covered county permitting agency' under Colorado HB24-1173 (effective 8/7/2024), obligated by 12/31/2025 to adopt an ordinance addressing EV-charger permit standards — no public confirmation of the County's chosen compliance path (model code adoption, custom standards, or status-quo affirmation) was located in this review; this is reported as a genuinely open point rather than assumed

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit Fee (EV charger circuit, billed under general electrical fee tiers)Assessed by and paid to Summit County Building Department, (970) 668-3170 — not published on the Town of Silverthorne's fee schedule since the Town does not issue this permit. Confirmed against Summit County's own published Building Permit Fee Schedule, which lists Building, Window, Fireplace, Hot Tub, Electrical, Photovoltaic, Mechanical, Plumbing, and Mobile Home permit fee categories but no separate EV/EVSE category.
Based on total building area (sq ft) plus number of dwelling units; no distinct EV/EVSE fee line published

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Silverthorne?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical (if applicable)

    Performed by Summit County Building Department before concealment

  2. 2

    Final Electrical

    Performed by Summit County Building Department; charging circuit energized and verified

See the full Silverthorne inspection guide — scheduling & re-inspection fees →

Tips

  • Do not submit an EV charger electrical permit through the Town of Silverthorne's SmartGov portal or Building Division — it will not be processed there. Contact the Summit County Building Department directly at (970) 668-3170.
  • Because Summit County's fee schedule has no distinct EV/EVSE line-item, budget for the general residential Electrical Permit Fee (area- and unit-count-based) rather than a flat EV-specific fee.
  • Summit County is large enough to be covered by Colorado's HB24-1173 EV-charger-permitting law (population threshold >20,000), but this review could not confirm which of the three statutory compliance options the County chose by the 12/31/2025 deadline — call ahead to ask whether a streamlined EV-charger review track now exists beyond the standard Electrical Permit process.

Frequently asked questions

Silverthorne requires an ev charger / evse permit for: EV charger (EVSE) circuit/panel work must be submitted directly to the Summit County Building Department (37 S.C.R. 1005, Frisco, CO), not to the Town of Silverthorne, per the same Outside Agency Permits routing documented for all electrical work in Town; Governed by the 2023 NFPA 70 National Electrical Code as adopted (same code cited in this file's Electrical Permit entry); No EV/EVSE-specific line-item appears on Summit County's published Building Permit Fee Schedule; the general residential Electrical Permit Fee (based on total building area and number of dwelling units) applies; Summit County (population >20,000) is a 'covered county permitting agency' under Colorado HB24-1173 (effective 8/7/2024), obligated by 12/31/2025 to adopt an ordinance addressing EV-charger permit standards — no public confirmation of the County's chosen compliance path (model code adoption, custom standards, or status-quo affirmation) was located in this review; this is reported as a genuinely open point rather than assumed. If your project isn't listed, confirm with Town of Silverthorne Community Development Department, Building Division at 970-262-7360 before starting work.

No. Summit County's published Building Permit Fee Schedule (the agency that issues all electrical permits for Silverthorne) has no separate EV/EVSE line-item; an EV charger circuit is billed under the same area- and dwelling-unit-based Electrical Permit Fee used for any other electrical work.

Silverthorne does not publish a plan-review timeline for this permit. Contact Town of Silverthorne Community Development Department, Building Division at 970-262-7360 for current turnaround.

You'll need: Electrical Permit Application (Summit County Building Department). See the required-documents checklist on this page for details on each.

Silverthorne requires 2 inspection(s) for an ev charger / evse permit, in order: Rough Electrical (if applicable), Final Electrical. Schedule each through Town of Silverthorne Community Development Department, Building Division (970-262-7360).

Apply through Town of Silverthorne Community Development Department, Building Division at 601 Center Circle, P.O. Box 1309, Silverthorne, CO 80498. Phone: 970-262-7360, email: buildinginfo@silverthorne.org. Office hours: Monday through Friday, 8 a.m. to 5 p.m.; building permit submittal appointments required (per Community Development FAQ). Town Hall main line (970) 262-7300; Community Development/Building direct line (970) 262-7360. Electrical permits are handled separately by the Summit County Building Department, 0037 Peak One Drive / 37 S.C.R. 1005, Frisco, CO, (970) 668-3170.. Official information: https://www.silverthorne.org/town-government/community-development/building-copy.

Silverthorne, Colorado has adopted: 2018 International Building Code (IBC), with Town of Silverthorne local amendments — Town of Silverthorne Building Codes & Amendments page, https://www.silverthorne.org/town-government/community-development/building-copy/building-codes-construction-resources; 2018 International Fire Code (IFC), with Town of Silverthorne local amendments — same source; 2023 NFPA 70 National Electrical Code (NEC), adopted by Town Ordinance 2023-10 — the Town's own Building Codes & Amendments page attributes this specific adoption to the Summit County Building Department ('Ordinance 2023-10 2023 NFPA70 National Electrical Code Adoption - from the Summit County Building Department'), consistent with Summit County issuing and governing all electrical permits Town-wide; Underlying building-code plan review and inspection for all permit types is performed by the Summit County Building Department 'based on the Building Code most recently adopted by the Town' — Town of Silverthorne Plan Review page, https://www.silverthorne.org/town-government/community-development/building-copy/resubmittals-and-revisions; IRC Section 321.1 as locally amended (temporary/permanent address numbering requirements) and IBC Sections 105.4, 105.6, 109.1, 109.5, 109.7, 104.10, 104.11, and 3402.1 as locally amended (administrative provisions: permit suspension/revocation, inspection access, reinspection fees, code-modification authority, alternate materials/methods, and additions/alterations conforming to new-construction code) — Town of Silverthorne Building Codes & Construction Resources page, General Requirements / Administrative Requirements sections. Local amendments apply — see the Silverthorne overview page for the full list.

Yes, by population — HB24-1173 covers counties with more than 20,000 residents, and Summit County's population (~30,000) exceeds that threshold, making the County a 'covered county permitting agency' required to address EV-charger permit standards by 12/31/2025. This review did not find public confirmation of which compliance path (model code, custom standards, or status quo) the County selected.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silverthorne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.