Accessory Dwelling Unit / Single Apartment Building Permit in Silverthorne, Colorado

Required for construction of an accessory dwelling unit (ADU) / single apartment in Silverthorne, whether as an attached addition, a detached structure, or a remodel of an existing home. Each ADU sub-type has its own dedicated submittal path on the Town's Permit Process page, all routed through Town Code review plus Summit County Building Code plan review.

Verified 2026-07-13 · Source

When you need this permit

  • Attached Addition ADU: site plan with existing/proposed structures, construction management plan, erosion control/grading plan, overall floor plans (existing and proposed), stamped structurals by a licensed Colorado engineer, architectural elevations
  • Detached Structure ADU: site plan showing existing/proposed structures to-scale, overall floor plans, stamped structurals by a licensed Colorado engineer, architectural elevations
  • Remodel-of-Existing-Home ADU: site plan with ADU footprint outlined to scale, stamped overall floor plans showing existing/proposed scope of work, stamped structurals, architectural elevations if exterior is modified
  • HOA approval if applicable; warranty deed if applicable for new ownership; exterior lighting spec sheet (attached/detached types); outside agency approvals prior to issuance
  • Summit Fire & EMS fire mitigation permit for all new construction, additions, and decks; life-safety/sprinkler permit required for Eagles Nest Golf Course Filings 1-5 or homes over 6,000 SF
  • Plan Review: Town of Silverthorne Planning (and Engineering, for attached/detached types) Department(s) review per Town Code; Summit County Building Department conducts Building Code plan review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Review FeeDue at submittal for all three ADU sub-types
65% of the Building Permit Fee
Building Permit Fee (same valuation table as new construction)Town of Silverthorne Permit Fees page, re-verified 2026-07-13 (supersedes the $23.50 minimum recorded 2026-07-06)
$65.00 minimum, scaling per valuation tiers
Water and Sewer Tap Fees / Impact Fees / Stormwater System Development FeePer the Town's Permit Process page, fee scope differs by ADU sub-type
Applicable for attached-addition and detached-structure ADUs (new construction); the remodel-of-existing-home ADU type lists only permit fees and water/sewer tap fees due before issuance, no stormwater/impact fee listed

Review timeline

Plan review
Not published — contact the department

How long did your Accessory Dwelling Unit / Single Apartment Building Permit permit actually take in Silverthorne?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation (attached/detached new construction)

    Performed by Summit County Building Department; not applicable to the remodel-of-existing-home ADU sub-type unless new footings are involved

  2. 2

    Rough Frame / Rough Trades

    Framing and trade rough-ins before concealment

  3. 3

    Final Inspection

    Town final inspections (Planning/Engineering as applicable) plus Summit County final building inspection

See the full Silverthorne inspection guide — scheduling & re-inspection fees →

Tips

  • Silverthorne treats ADUs as three distinct permit sub-types with three separate online application links (attached addition, detached structure, remodel-of-existing-home) — apply under the correct one, since submittal packages and fee scope differ.
  • The remodel-of-existing-home ADU path has a lighter fee scope (no stormwater/impact fee line item published) than the attached-addition or detached-structure paths, which are treated more like new construction.

Frequently asked questions

Silverthorne requires an accessory dwelling unit / single apartment building permit for: Attached Addition ADU: site plan with existing/proposed structures, construction management plan, erosion control/grading plan, overall floor plans (existing and proposed), stamped structurals by a licensed Colorado engineer, architectural elevations; Detached Structure ADU: site plan showing existing/proposed structures to-scale, overall floor plans, stamped structurals by a licensed Colorado engineer, architectural elevations; Remodel-of-Existing-Home ADU: site plan with ADU footprint outlined to scale, stamped overall floor plans showing existing/proposed scope of work, stamped structurals, architectural elevations if exterior is modified; HOA approval if applicable; warranty deed if applicable for new ownership; exterior lighting spec sheet (attached/detached types); outside agency approvals prior to issuance; Summit Fire & EMS fire mitigation permit for all new construction, additions, and decks; life-safety/sprinkler permit required for Eagles Nest Golf Course Filings 1-5 or homes over 6,000 SF; Plan Review: Town of Silverthorne Planning (and Engineering, for attached/detached types) Department(s) review per Town Code; Summit County Building Department conducts Building Code plan review. If your project isn't listed, confirm with Town of Silverthorne Community Development Department, Building Division at 970-262-7360 before starting work.

In Silverthorne, the published Plan Review Fee is: 65% of the Building Permit Fee. Additional published fees: Building Permit Fee (same valuation table as new construction) — $65.00 minimum, scaling per valuation tiers; Water and Sewer Tap Fees / Impact Fees / Stormwater System Development Fee — Applicable for attached-addition and detached-structure ADUs (new construction); the remodel-of-existing-home ADU type lists only permit fees and water/sewer tap fees due before issuance, no stormwater/impact fee listed. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Silverthorne does not publish a plan-review timeline for this permit. Contact Town of Silverthorne Community Development Department, Building Division at 970-262-7360 for current turnaround.

You'll need: ADU Building Permit Application (SmartGov Portal); Stamped Structural Plans. See the required-documents checklist on this page for details on each.

Silverthorne requires 3 inspection(s) for an accessory dwelling unit / single apartment building permit, in order: Foundation (attached/detached new construction), Rough Frame / Rough Trades, Final Inspection. Schedule each through Town of Silverthorne Community Development Department, Building Division (970-262-7360).

Apply through Town of Silverthorne Community Development Department, Building Division at 601 Center Circle, P.O. Box 1309, Silverthorne, CO 80498. Phone: 970-262-7360, email: buildinginfo@silverthorne.org. Office hours: Monday through Friday, 8 a.m. to 5 p.m.; building permit submittal appointments required (per Community Development FAQ). Town Hall main line (970) 262-7300; Community Development/Building direct line (970) 262-7360. Electrical permits are handled separately by the Summit County Building Department, 0037 Peak One Drive / 37 S.C.R. 1005, Frisco, CO, (970) 668-3170.. Official information: https://www.silverthorne.org/town-government/community-development/building-copy.

Silverthorne, Colorado has adopted: 2018 International Building Code (IBC), with Town of Silverthorne local amendments — Town of Silverthorne Building Codes & Amendments page, https://www.silverthorne.org/town-government/community-development/building-copy/building-codes-construction-resources; 2018 International Fire Code (IFC), with Town of Silverthorne local amendments — same source; 2023 NFPA 70 National Electrical Code (NEC), adopted by Town Ordinance 2023-10 — the Town's own Building Codes & Amendments page attributes this specific adoption to the Summit County Building Department ('Ordinance 2023-10 2023 NFPA70 National Electrical Code Adoption - from the Summit County Building Department'), consistent with Summit County issuing and governing all electrical permits Town-wide; Underlying building-code plan review and inspection for all permit types is performed by the Summit County Building Department 'based on the Building Code most recently adopted by the Town' — Town of Silverthorne Plan Review page, https://www.silverthorne.org/town-government/community-development/building-copy/resubmittals-and-revisions; IRC Section 321.1 as locally amended (temporary/permanent address numbering requirements) and IBC Sections 105.4, 105.6, 109.1, 109.5, 109.7, 104.10, 104.11, and 3402.1 as locally amended (administrative provisions: permit suspension/revocation, inspection access, reinspection fees, code-modification authority, alternate materials/methods, and additions/alterations conforming to new-construction code) — Town of Silverthorne Building Codes & Construction Resources page, General Requirements / Administrative Requirements sections. Local amendments apply — see the Silverthorne overview page for the full list.

No. The Town publishes three separate ADU permit sub-types — attached addition, detached structure, and remodel of an existing home — each with its own application link, submittal checklist, and fee scope.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silverthorne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.