Residential Addition / Remodel Building Permit — Silverthorne, Colorado · Requirements sheet
Verified 2026-07-13 · Source: https://www.silverthorne.org/town-government/community-development/building-copy/permit-process
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Remodel Building Permit in Silverthorne, Colorado
Covers additions and interior/structural remodels to existing single-family residences in Silverthorne. Additions follow largely the same submittal package as new construction (minus excise tax); remodels have a lighter submittal package. Both route through Town Code review plus Summit County Building Code plan review.
Verified 2026-07-13 · Source
When you need this permit
- Residential Additions: site plan with topographical info, building height table, water/sewer service line details, construction management plan, erosion control/grading plan, landscape plan, tree conservation plan, exterior lighting location, architectural plans, elevations with USGS ties, stamped structural drawings, foundation and framing plans, soils report
- Residential Remodels: overall floor plans showing existing and proposed scope of work, scope of work list, stamped structural plans by a licensed Colorado engineer (lighter submittal than additions/new construction)
- Summit Fire & EMS fire mitigation permit required for additions (not listed as required for remodels specifically)
- Plan Review: Town of Silverthorne Planning and Engineering Departments review per Town Code; Summit County Building Department conducts Building Code plan review
- Water and sewer tap fees (EQRs) required for additions that add bedrooms/bathrooms
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (additions with new footings)
Performed by Summit County Building Department
- 2
Rough Frame / Rough Trades
Framing, electrical, plumbing, mechanical rough-ins before concealment
- 3
Final Inspection
Town final inspections (Engineering/Water-Sewer/Planning where applicable) plus Summit County final building inspection
See the full Silverthorne inspection guide — scheduling & re-inspection fees →
Tips
- Remodels have a noticeably lighter submittal package than additions in Silverthorne (floor plans + scope of work + structural, versus the full new-construction-style package) — confirm which category your project falls into before assembling documents.
- Additions that add bedrooms or bathrooms trigger water/sewer tap fees (EQRs) that pure remodels typically do not.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Silverthorne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Silverthorne
Residential Addition / Remodel Building Permit in other cities
Compare residential addition / remodel building permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Silverthorne project checklist
Describe your project once and get every permit, document, and fee it triggers in Silverthorne — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →