Residential/Commercial Addition or Remodel Permit — Evans, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.evanscolorado.gov/media/3asbgunw/commercial-and-residential-addition-or-remodel-application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential/Commercial Addition or Remodel Permit in Evans, Colorado
Required for additions, basement finishes, remodels, and tenant finishes in Evans. Falls under the City's 'Building Addition and Remodel' permit category (plan review plus more than one inspection), or 'Building Accessory Structure' for detached garages, sheds, carports, and gazebos.
Verified 2026-07-06 · Source
When you need this permit
- Categorized as 'Building Addition and Remodel' (patio covers, pergolas, basement finishes, additions, tenant finishes) or 'Building Accessory Structure' (detached garages, shops, sheds, carports, gazebos) per the City's 'What Type of Permit Do I Need?' guide
- A site plan displaying setbacks is required for both categories; accessory structures additionally require evidence the structure's materials/colors match the primary structure
- Structural drawings (floor/roof framing) must bear an original seal and signature of a Colorado-registered architect or engineer where applicable
- A plot plan is required if adding onto an existing structure, placing a new detached structure on the lot, or replacing an existing structure
- All commercial submittals must be stamped and signed by a Colorado Registrant
- Final inspection must occur within 2 years of permit issuance; permit is void if construction doesn't commence within 180 days or halts for 180 continuous days
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (if new footings)
Before concrete pour, if applicable
- 2
Framing
Framing and connection to existing structure
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
See the full Evans inspection guide — scheduling & re-inspection fees →
Tips
- Detached accessory structures (garages, sheds, carports, gazebos) require evidence that materials and colors match the primary structure — plan the exterior finish selection before submittal, not after.
- A plot plan is required any time you're adding on to a structure, placing a new detached structure, or replacing an existing structure — even if the replacement sits in the exact same footprint.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Evans building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Evans
Residential/Commercial Addition or Remodel Permit in other cities
Compare residential/commercial addition or remodel permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Evans project checklist
Describe your project once and get every permit, document, and fee it triggers in Evans — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →