EV Charger / EVSE Permit (Billed as Electrical Upgrade / Building One Stop) — Evans, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.evanscolorado.gov/media/rlgo2iov/what-type-of-permit-do-i-need.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit (Billed as Electrical Upgrade / Building One Stop) in Evans, Colorado
Required for installation of a Level 2 (or higher) electric vehicle charger/EVSE in Evans. The City's own 'What Type of Permit Do I Need?' guide lists 'electrical upgrades' among its Building One Stop category examples (smaller projects requiring one inspection, no plan review, quick approval) — an EV charger circuit falls under this same category, since no EV-specific line item or checklist is published. Billed on the same area-based (residential) or valuation-based (commercial) Electrical Permit fee schedule used for any other standalone electrical upgrade, reviewed under the 2023 NEC as adopted (per the City's live Current Codes and Zoning page), including Article 625 (Electric Vehicle Power Transfer System).
Verified 2026-07-20 · Source
When you need this permit
- Electrical upgrades (including EV charger circuits) are a 'Building One Stop' category permit, per the City's 'What Type of Permit Do I Need?' guide — one inspection, no plan review, quick approval
- Governed by the 2023 NEC per the State of Colorado, per the City's live Current Codes and Zoning page
- Electrical contractors must hold current state licensure; state license number recorded on the application
- Submitted via the One Stop Building Application (CitizenServe)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Single inspection per the One Stop category, covering charger circuit wiring, breaker sizing, and GFCI/disconnect
See the full Evans inspection guide — scheduling & re-inspection fees →
Tips
- EV charger circuits are billed by enclosed square footage for residential work (the same area-based table as other electrical upgrades), not by project valuation — don't apply the general Building Permit Fee valuation table to a standalone EV charger permit.
- The City's guide explicitly distinguishes Photovoltaic (solar) permits from electrical upgrades, noting 'electric upgrades must be submitted as a separate permit' from the PV permit — an EV charger circuit is processed as a standalone electrical upgrade under the same rule.
- As a Building One Stop category item, an EV charger permit gets one inspection and no plan review, the fastest track the City publishes, though no specific day-count turnaround is stated.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Evans building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Evans
EV Charger / EVSE Permit (Billed as Electrical Upgrade / Building One Stop) in other cities
Look up this fee in a different city →
Related guides
Now live
Build your Evans project checklist
Describe your project once and get every permit, document, and fee it triggers in Evans — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →