Required for new commercial primary structures (including shell buildings) in Evans. Administered by the City of Evans Building Division (in-house City staff since 2025). Falls under the City's 'Building New Primary Structure' permit category — 'reserved for new residential and commercial primary structures' with a full plan review and inspection set — and carries the City's published 20-business-day commercial plan review period. Reviewed under the 2018 I-Codes with the 2023 NEC as adopted by the State of Colorado.

Verified 2026-08-02 · Source

When you need this permit

  • Categorized as 'Building New Primary Structure' per the City's 'What Type of Permit Do I Need?' guide — reserved for new residential and commercial primary structures, requiring a full plan review and inspection set; the City's Building FAQs list 'commercial buildings' explicitly under this permit type
  • Commercial projects must be completed by professional contractors and may not be completed by the property owner or tenant, per the City's 'How To: Obtain A Building Permit' guide
  • Design professionals may submit the application if a contractor has not yet been selected for a commercial project, but the contractor must be added to the permit prior to issuance (Building FAQs)
  • The general contractor must hold a current City of Evans business license (the City does not issue contractor licenses); plumbing and electrical contractors must provide Colorado State license numbers Contractor
  • Application, plans, and documents submitted electronically via CitizenServe (citizenserve.com/cityofevans); invoice issued and paid online (credit card or e-check) before the permit is issued — no work may commence before issuance
  • Per the Building FAQs, new primary structure submittals require a full plan set, plot plan, soils report, energy report, fire impact fee form, and raw water dedication certification
  • All commercial submittals must be stamped and signed by a Colorado Registrant (Commercial or Residential Addition/Remodel application checklist)
  • Commercial plan review fee (50% of construction fee cost) and the $75 administration fee are owed regardless of whether the permit is ultimately obtained, per the application's signed acknowledgment
  • A permit is valid for 180 days if no inspection activity occurs; each passed inspection renews it for another 180 days, up to a maximum of 2 years — extension requests must be made in writing before expiration

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 7 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Administration FeeCharged to review building permit applications and issue permits (2026 Fee Schedule)
$75.00
Plan Review Fee — Commercial (New Construction/Addition and Remodel)Due at time of submittal (2026 Fee Schedule, p.3); the 2024 schedule labeled this same line 'New Construction/Commercial Tenant Finish'
50% of Construction Fee Cost
Building Permit Fee — valuation $100,000.01 to $500,000'Building Permit – All Other Occupancies – Total Valuation' table, 2026 Fee Schedule; minimum $26.24 at the lowest tier
$1,109.38 for the first $100,000 plus $6.26 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $500,000.01 to $1,000,000
$3,613.38 for the first $500,000 plus $5.23 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $1,000,000.01 and upValuations based on the semi-annual ICC Building Data Value Table (BDVT)
$6,228.38 for the first $1,000,000 plus $4.02 for each additional $1,000 or fraction thereof
Use TaxPer the 2024 Building Permit Fee Schedule (worked example: $100,000 valuation -> $50,000 -> 4.5% = $2,250); not restated in the 2026 schedule
4.5% of half the total building valuation
Stormwater (MS4) Inspection Fee — Commercial2026 Fee Schedule, Stormwater Inspection Fees
$2,150.00 per building
Transportation Impact Fee — Commercial2026 Fee Schedule; Office/Other $5,543, Industrial/Flex $3,500, Institutional $5,114 per KSF
$12,793.00 per 1,000 sq ft of floor area
Fire/Rescue Services Impact Fee — Commercial2026 Fee Schedule; Office/Other Services $1,255, Light Industrial $564, Institutional $1,247 per KSF, Hotel $925 per room
$3,256.00 per KSF
Police Protection Services Impact Fee — Commercial2026 Fee Schedule; Office/Institutional $567, Industrial/Flex $289 per KSF. Park Facility Impact Fee is $0.00 for commercial/office/industrial
$1,449.00 per 1,000 sq ft of floor area
Stormwater Development Fee — Commercial/Industrial2026 Fee Schedule; 23rd Avenue Drainage Basin Fee $213.12 + $0.02/sq ft over 10,000 applies in that basin
$1,364.00 (undeveloped property) plus $0.14 for each sq ft of area over 10,000 sq ft
Water/Wastewater System Development Fees (non-residential)Full tables by tap/meter size in the 2026 Fee Schedule, pp.6-7; water meter fees additional
Varies by meter/tap size — e.g., 3/4" tap water system development $24,109 inside city without non-potable availability; 3/4" non-residential wastewater $10,426 inside city
Use of Outside Consultants (plan review)2026 Fee Schedule
Actual Costs + 3% Admin

Review timeline

Plan reviewEvans’s published plan-review target
1–20 business days

How long did your Commercial Building Permit (New Commercial Construction) permit actually take in Evans?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation Inspection

    Typical first structural inspection of the full commercial inspection set; exact required inspections are set at plan review. All inspections scheduled by the permit holder via CitizenServe

  2. 2

    Framing Inspection

    Structural framing complete before cover

  3. 3

    Rough Electrical/Plumbing/Mechanical Inspections

    Trade rough-ins before concealment; give not less than one working day's notice

  4. 4

    Stormwater (MS4) Inspection

    Commercial buildings carry a separately fee-scheduled $2,150 per-building stormwater inspection

  5. 5

    Final Inspection

    All work complete per approved plans; a final inspection must occur within 2 years of permit issuance or a new permit must be obtained. Repeat visits for the same inspection incur a $75 reinspection fee

See the full Evans inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial plan review runs on a 20-business-day published clock — double the 10-business-day residential period — and revisions for incomplete or unclear applications restart the extension risk, so submit a complete, Colorado-Registrant-stamped package the first time; the City states only complete submittals will be reviewed.
  • Impact and development fees will usually dwarf the building permit fee itself on commercial work: transportation alone is $12,793 per 1,000 sq ft of commercial floor area, plus fire/rescue ($3,256/KSF), police ($1,449/KSF), stormwater, and meter-size-based water/wastewater system development fees.
  • Inspection requests must be entered in CitizenServe by midnight for a next-day inspection; same-day requests are not granted unless the inspector deems them urgent.
  • Some of the City's downloadable application PDFs still print legacy SAFEbuilt, Inc. contacts and '2017 NEC, 2012 IECC' code lines — these predate the 2025 in-house transition; the live Building and Renovating page confirms the 2018 I-Codes with the 2023 NEC, and the Building Division is reachable at 970-475-1110 / building@evanscolorado.gov.

Frequently asked questions

Evans requires a commercial building permit (new commercial construction) for: Categorized as 'Building New Primary Structure' per the City's 'What Type of Permit Do I Need?' guide — reserved for new residential and commercial primary structures, requiring a full plan review and inspection set; the City's Building FAQs list 'commercial buildings' explicitly under this permit type; Commercial projects must be completed by professional contractors and may not be completed by the property owner or tenant, per the City's 'How To: Obtain A Building Permit' guide; Design professionals may submit the application if a contractor has not yet been selected for a commercial project, but the contractor must be added to the permit prior to issuance (Building FAQs); The general contractor must hold a current City of Evans business license (the City does not issue contractor licenses); plumbing and electrical contractors must provide Colorado State license numbers; Application, plans, and documents submitted electronically via CitizenServe (citizenserve.com/cityofevans); invoice issued and paid online (credit card or e-check) before the permit is issued — no work may commence before issuance; Per the Building FAQs, new primary structure submittals require a full plan set, plot plan, soils report, energy report, fire impact fee form, and raw water dedication certification; All commercial submittals must be stamped and signed by a Colorado Registrant (Commercial or Residential Addition/Remodel application checklist); Commercial plan review fee (50% of construction fee cost) and the $75 administration fee are owed regardless of whether the permit is ultimately obtained, per the application's signed acknowledgment; A permit is valid for 180 days if no inspection activity occurs; each passed inspection renews it for another 180 days, up to a maximum of 2 years — extension requests must be made in writing before expiration. If your project isn't listed, confirm with City of Evans Building Division (in-house City staff since 2025; formerly contracted to SAFEbuilt, Inc.) at 970-475-1110 before starting work.

In Evans, the published Administration Fee is: $75.00. Additional published fees: Plan Review Fee — Commercial (New Construction/Addition and Remodel) — 50% of Construction Fee Cost; Building Permit Fee — valuation $100,000.01 to $500,000 — $1,109.38 for the first $100,000 plus $6.26 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $500,000.01 to $1,000,000 — $3,613.38 for the first $500,000 plus $5.23 for each additional $1,000 or fraction thereof; Building Permit Fee — valuation $1,000,000.01 and up — $6,228.38 for the first $1,000,000 plus $4.02 for each additional $1,000 or fraction thereof; Use Tax — 4.5% of half the total building valuation; Stormwater (MS4) Inspection Fee — Commercial — $2,150.00 per building; Transportation Impact Fee — Commercial — $12,793.00 per 1,000 sq ft of floor area; Fire/Rescue Services Impact Fee — Commercial — $3,256.00 per KSF; Police Protection Services Impact Fee — Commercial — $1,449.00 per 1,000 sq ft of floor area; Stormwater Development Fee — Commercial/Industrial — $1,364.00 (undeveloped property) plus $0.14 for each sq ft of area over 10,000 sq ft; Water/Wastewater System Development Fees (non-residential) — Varies by meter/tap size — e.g., 3/4" tap water system development $24,109 inside city without non-potable availability; 3/4" non-residential wastewater $10,426 inside city; Use of Outside Consultants (plan review) — Actual Costs + 3% Admin. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The City of Evans publishes a 20-business-day review period for new commercial construction permits (versus 10 business days for residential), and states it strives to complete reviews sooner. Incomplete or unclear applications that require revisions can extend the review period.

You'll need: Building Permit Application (CitizenServe); Full Plan Set; Plot Plan with Full Elevations; Soils Report; Energy Report; Fire Impact Fee Form; Raw Water Dedication Certification. See the required-documents checklist on this page for details on each.

Evans requires 5 inspection(s) for a commercial building permit (new commercial construction), in order: Footing/Foundation Inspection, Framing Inspection, Rough Electrical/Plumbing/Mechanical Inspections, Stormwater (MS4) Inspection, Final Inspection. Schedule each through City of Evans Building Division (in-house City staff since 2025; formerly contracted to SAFEbuilt, Inc.) (970-475-1110).

Apply through City of Evans Building Division (in-house City staff since 2025; formerly contracted to SAFEbuilt, Inc.) at 1100 37th Street, Evans, CO 80620. Phone: 970-475-1110, email: building@evanscolorado.gov. Office hours: Weekdays, 8:00 a.m. to 5:00 p.m.; Inspection Line 970-475-2211 (per the City's current Addition/Remodel application form's inspection contact; note some older One Stop application copy still lists a legacy SAFEbuilt inspection line, 303-774-0454 / 303-774-1388, that predates the 2025 in-house transition). Official information: https://www.evanscolorado.gov/building-business-development/building-and-renovating/.

No. The City's own permit guide states commercial projects must be completed by professional contractors and may not be completed by the property owner or tenant. A design professional may submit the application before a contractor is selected, but a licensed contractor must be added to the permit before it is issued.

The City of Evans Building Division (1100 37th Street, Evans, CO 80620, 970-475-1110) administers permits inside city limits, with plan review and inspections performed by in-house City staff since 2025. Colorado has no state-level building permit agency for standard commercial construction.

Sources & verification

Verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Evans building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Evans.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.