Commercial Tenant Improvement (Tenant Finish) Permit in Evans, Colorado
Required for tenant finish/tenant improvement work in existing commercial spaces in Evans. A genuinely distinct track from new commercial construction: tenant finishes are explicitly listed under the City's 'Building Addition and Remodel' permit category, the Commercial or Residential Addition/Remodel application carries a dedicated 'Tenant Finish' checkbox with its own valuation line, and the review clock is the 10-business-day addition/remodel period rather than the 20-business-day new-commercial period. The 2024 fee schedule even named the commercial plan-review line 'New Construction/Commercial Tenant Finish.'
Verified 2026-08-02 · Source
When you need this permit
- Categorized under 'Building Addition and Remodel' — the City's 'What Type of Permit Do I Need?' guide lists 'tenant finishes' explicitly, and the Building FAQs list tenant finishes among medium projects requiring an 'addition/remodel' permit with plans showing the intended work and usually a plot plan
- Filed on the Commercial or Residential Addition/Remodel application, which has a dedicated 'Tenant Finish' checkbox (with valuation) under the Commercial/Industrial proposed-use section, alongside New Building, Shell Only, and Remodel/Addition options
- All commercial submittals must be stamped and signed by a Colorado Registrant; only complete submittals will be reviewed
- Commercial projects must be completed by professional contractors and may not be completed by the property owner or tenant
- A site plan displaying setbacks is required with the application materials per the permit-type guide; plan review plus more than one inspection
- Any change in the use or occupancy of the building or structure must be approved prior to proceeding with construction
- Submitted electronically via CitizenServe with the business name and a detailed description of the proposed use; electrical valuation itemized separately on the form
- Permit valid 180 days without inspection activity; each inspection renews it 180 days up to a 2-year maximum, and a final inspection must occur within 2 years of issuance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical/Plumbing/Mechanical Inspections
Trade rough-ins before concealment; category is defined as plan review plus more than one inspection. Scheduled via CitizenServe with at least one working day's notice
- 2
Framing Inspection (if structural scope)
Framing and connections where the tenant finish includes structural work
- 3
Final Inspection
All work complete per approved plans; must occur within 2 years of permit issuance. Repeat visits for the same inspection incur a $75 reinspection fee
See the full Evans inspection guide — scheduling & re-inspection fees →
Tips
- Tenant finish is Evans' faster commercial track: a published 10-business-day (typically ~1 week) addition/remodel review instead of the 20-business-day new-commercial-construction review — but plan review is still billed at the commercial rate of 50% of the construction fee cost, and drawings still need a Colorado Registrant's stamp.
- If the tenant finish changes the use or occupancy of the space, that change must be approved before construction proceeds — flag any occupancy change in the application's proposed-use description up front.
- The application form itemizes electrical valuation separately from the tenant finish valuation; commercial electrical work is billed on its own valuation-based electrical fee table.
- The current Addition/Remodel application PDF still prints legacy SAFEbuilt, Inc. references and a '2017 NEC, 2012 IECC' code line that predate the City's 2025 in-house transition — the live codes page confirms 2018 I-Codes with the 2023 NEC; confirm code-edition questions with the Building Division (970-475-1110).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Evans building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Evans.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Evans
Commercial Tenant Improvement (Tenant Finish) Permit in other cities
Compare commercial tenant improvement (tenant finish) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Evans project checklist
Describe your project once and get every permit, document, and fee it triggers in Evans — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →