Residential Building Permit (New Primary Structure) — Evans, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.evanscolorado.gov/building-business-development/building-and-renovating/building-permit-applications/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Primary Structure) in Evans, Colorado
Required for new single-family homes and other new residential primary structures in Evans. Falls under the City's 'Building New Primary Structure' permit category, which requires a full plan review and inspection set. Reviewed under the 2018 IBC/IRC as adopted (2023 NEC per the State of Colorado).
Verified 2026-07-06 · Source
When you need this permit
- Categorized as 'Building New Primary Structure' per the City's 'What Type of Permit Do I Need?' guide — reserved for new residential and commercial primary structures, requiring a full plan review and inspection set
- Application materials must include plot plans with full elevations called out, a completed raw water dedication form, and a fire impact fee form
- All contractors (general, electrical, plumbing) must hold a current City of Evans business license
- Applications submitted electronically via CitizenServe (citizenserve.com/cityofevans) as PDF documents; as of May 19, 2025 all contractors must apply directly through CitizenServe
- New Residential Plan Review Fee of $700.00 due at time of application submittal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes; must occur within 2 years of permit issuance
See the full Evans inspection guide — scheduling & re-inspection fees →
Tips
- Evans brought building inspection and plan review back in-house in 2025 after years of a SAFEbuilt, Inc. contract — verify current staff/inspection-line contact directly (970-475-1110 / building@evanscolorado.gov) since some older application PDFs still print legacy SAFEbuilt contact numbers.
- New primary structures require a raw water dedication form and fire impact fee form in addition to standard plan sets — budget time to complete these alongside the CitizenServe application.
- The $700 New Residential Plan Review Fee is due at submittal, not at issuance — separate from the valuation-based Building Permit Fee itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Evans building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Evans
Residential Building Permit (New Primary Structure) in other cities
Compare residential building permit (new primary structure) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Evans project checklist
Describe your project once and get every permit, document, and fee it triggers in Evans — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →