Demolition Permit in Evans, Colorado

Required for demolition of whole or partial buildings in Evans. Its own named category on the City's 'What Type of Permit Do I Need?' guide, requiring a State of Colorado Asbestos Mitigation form.

Verified 2026-07-06 · Source

When you need this permit

  • Demolition is its own named permit category, for whole or partial building demolition
  • Requires a State of Colorado Asbestos Mitigation form to be submitted with the application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (general valuation table)No demolition-specific flat fee was found published; billed under the same Valuation Chart as other permits
$26.24 minimum, scaling per valuation tiers

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Evans?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Site cleared and graded per approved demolition plan

See the full Evans inspection guide — scheduling & re-inspection fees →

Tips

  • Don't overlook the State of Colorado Asbestos Mitigation form — it's a state-level requirement bundled into the City's local demolition application, and applications are treated as incomplete without it.

Frequently asked questions

Yes. The City requires a State of Colorado Asbestos Mitigation form to be submitted along with the local Demolition Permit application.

In Evans, the published Building Permit Fee (general valuation table) is: $26.24 minimum, scaling per valuation tiers. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Evans does not publish a plan-review timeline for this permit. Contact City of Evans Building Division (in-house City staff since 2025; formerly contracted to SAFEbuilt, Inc.) at 970-475-1110 for current turnaround.

You'll need: Demolition Permit Application (CitizenServe); State of Colorado Asbestos Mitigation Form. See the required-documents checklist on this page for details on each.

Evans requires 1 inspection(s) for a demolition permit, in order: Final Inspection. Schedule each through City of Evans Building Division (in-house City staff since 2025; formerly contracted to SAFEbuilt, Inc.) (970-475-1110).

Apply through City of Evans Building Division (in-house City staff since 2025; formerly contracted to SAFEbuilt, Inc.) at 1100 37th Street, Evans, CO 80620. Phone: 970-475-1110, email: building@evanscolorado.gov. Office hours: Weekdays, 8:00 a.m. to 5:00 p.m.; Inspection Line 970-475-2211 (per the City's current Addition/Remodel application form's inspection contact; note some older One Stop application copy still lists a legacy SAFEbuilt inspection line, 303-774-0454 / 303-774-1388, that predates the 2025 in-house transition). Official information: https://www.evanscolorado.gov/building-business-development/building-and-renovating/.

Evans, Colorado has adopted: 2018 International Building Code (IBC), adopted and enforced per the City's 'Current Codes and Zoning' page; 2018 International Residential Code (IRC); 2018 International Mechanical Code (IMC); 2018 International Plumbing Code (IPC); 2018 International Fuel Gas Code (IFGC); 2023 National Electrical Code (NEC), adopted 'per the State of Colorado' — per the City's current 'Current Codes and Zoning' page, https://www.evanscolorado.gov/building-business-development/building-and-renovating/current-codes-and-zoning/; 2018 International Property Maintenance Code; 2018 International Existing Building Code (IEBC); 2018 International Energy Conservation Code (IECC), applied together with the Colorado Model Energy Efficiency Construction and Renovation Standards; 2018 International Fire Code (IFC); 2018 International Swimming Pool and Spa Code; Evans Municipal Code (Title 15, Buildings and Construction) governs adoption — https://library.municode.com/co/evans/codes/municipal_code?nodeId=MUCO_TIT15BUCO; DISCREPANCY NOTE: the City's dedicated 'Current Codes and Zoning' webpage (the canonical source, checked live) lists 2023 NEC, while several of the City's own downloadable application PDFs (One Stop Building Application, 'Last Revised 2/2020'; Commercial/Residential Addition or Remodel Application) still print the older line 'Current Adopted Code is 2018 IRC, IMC, IFGC, IPC, IFC; 2017 NEC, 2012 IECC.' This corpus follows the live Current Codes and Zoning page as authoritative since it is the City's dedicated, more recently-maintained code-reference source and 2023 NEC aligns with the statewide NEC adoption cycle other Colorado jurisdictions (e.g., Northglenn) are also on; the application-PDF text appears to be an un-updated holdover from before the 2025 in-house transition and should be re-verified directly with Building Division staff before treating it as current.. Local amendments apply — see the Evans overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Evans building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.