Kersey building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Kersey, Colorado.

Reviewed 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
446 1st Street, P.O. Box 657, Kersey, CO 80644
Phone
970-353-1681
Office hours
Not published on the Town of Kersey website (Building Inspection Department page, Administration Department page, or building permit how-to page were all checked directly). Town Hall main line 970-353-1681; SAFEbuilt Windsor office line 970-686-7511 (cited on the Town's Current Building Regulations page for building-code clarification); SAFEbuilt inspection requests may also be emailed to windsor@safebuilt.com per the Town's Re-Roofing guide.

Published scheduling rules

  • Ladders must be set up and secured properly for one- and two-story homes, and contractors should check for animals/hazards before setting up in a backyard, per the guide's inspection scheduling notes. (Re-Roof Permit)

Inspection sequence

Applies to: Residential Building Permit (New Construction / Additions)

  1. 1

    Foundation & Foundation Wall

    After trenches excavated, reinforcement steel placed, forms erected, prior to concrete placement

  2. 2

    Underground Plumbing

    Prior to covering any piping or wiring and prior to placing concrete

  3. 3

    Rough Trade (Plumbing/Mechanical/Electrical)

    After rough installation complete, prior to covering; may be combined with rough frame inspection

  4. 4

    Rough Frame

    After roof, framing, fire stopping, sheathing, draft stopping, bracing, and fasteners are in place

  5. 5

    Insulation

    After insulation placed, prior to covering walls

  6. 6

    Final Inspection

    After the addition/construction is completed

Applies to: Deck / Patio Cover / Carport Permit

  1. 1

    Footing Inspection

    After holes/trenches excavated and reinforcing steel/forms in place, prior to concrete placement

  2. 2

    Framing Inspection

    Rim board/ledger attachment, floor joists, beams, hangers (decks) or roof/truss/rafter attachment (patio covers/carports) prior to finished flooring or ceiling being applied; a rough electrical inspection is called at the same time if electric is being installed for a patio cover/carport

  3. 3

    Final Inspection

    After the deck or patio cover/carport is completed, including any final electrical

Applies to: Plumbing Permit

  1. 1

    Underground Plumbing

    Before covering piping/wiring and before concrete placement

  2. 2

    Rough Plumbing

    Part of the combined Rough Trade inspection, before concealment

  3. 3

    Final Inspection

Applies to: Residential Addition / Basement Finish Remodel

  1. 1

    Rough Trade (Plumbing/Mechanical/Electrical)

    Before concealment

  2. 2

    Rough Frame / Insulation

    After framing and insulation placed, before cover

  3. 3

    Final Inspection

    After work complete

Applies to: Electric Vehicle (EV) Charger / EVSE Permit

  1. 1

    Rough Electrical

    Circuit and conduit installed before concealment, if applicable; part of the combined 'Rough Trade' inspection

  2. 2

    Final Inspection

    Charger mounted, circuit labeled, and installation verified per the adopted 2020 NEC; inspector may verify electrician identity/licensure at discretion

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and rough-in before concealment; part of the combined 'Rough Trade' inspection

  2. 2

    Final Inspection

    Devices installed, system verified; inspector may verify electrician identity/licensure at discretion

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Part of the combined Rough Trade inspection, before concealment

  2. 2

    Final Inspection

Applies to: Re-Roof Permit

  1. 1

    Mid-Roof Inspection

    May be required per the guide's FAQ section, though the same guide's Additional Information section states mid-roof inspections are NOT required on residential projects — confirm directly with the Building Department which applies to your project

  2. 2

    Final Roof Inspection

    Mandatory for all re-roof permits

Applies to: Rooftop Solar Photovoltaic Permit

  1. 1

    Foundation/Footing (ground-mount) or Framing (rooftop racking)

    Structural attachment verified before panels are installed, per SAFEbuilt's standard inspection sequence

  2. 2

    Final Electrical/Interconnection

    Interconnection wiring verified; electrical contractor licensure re-checked against DORA's License Lookup per the Town's Electrical License Contemporaneous Review Guidelines

Re-inspection fees

Residential Building Permit (New Construction / Additions)Re-inspection Fee · 2026 Fee Schedule
$50.00/hour, 2-hour minimum

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kersey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Kersey building permits

Get alerts for Kersey

We'll email you when Kersey's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.