Electric Vehicle (EV) Charger / EVSE Permit — Kersey, Colorado · Requirements sheet
Reviewed 2026-07-23 · Source: https://www.kerseygov.com/Documents/Departments/Building%20Inspection%20Department/Electrical%20Permit%20Information/Electrical%20License%20Contemporaneous%20Review%20Guidelines%20(PDF).pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Kersey, Colorado
Kersey has no dedicated EV charger/EVSE fee line or standalone permit category. EV charger (Level 2 or DC fast charging equipment) circuit installation is 'electrical only' work under the Town's standard Electrical Permit process, governed by the 2020 NEC per the Town's Current Building Regulations page, with the same contemporaneous Colorado DORA license-verification requirement applied to all electrical permits. The Town's own Home Additions and Accessory Structures guides direct applicants with questions about the State of Colorado 'Electric Ready Code' to contact the Building Department for applicability — a reference to new-construction electric/EV-readiness wiring requirements under HB22-1362, not a distinct EV charger permit fee or process. Kersey's population (well under 2,000) is far below the 10,000-resident municipal threshold that triggers Colorado HB24-1173's requirement to adopt a standardized/expedited EV charging system permitting program, so the Town is not required to have adopted a distinct EV permitting track.
Reviewed 2026-07-23 · Source
When you need this permit
- Electrician's name and Colorado state electrical license number must be listed on the 'electrical only' permit application for the EV charger circuit; applications missing this are rejected
- The Town verifies the listed electrician's license is active via the Colorado DORA online License Lookup before approving the permit
- Governed by the 2020 NEC as adopted by the Town, including NEC Article 625 (Electric Vehicle Charging System) provisions
- Submitted via the Town's Community Core online portal
- Kersey's population is well below Colorado HB24-1173's 10,000-resident municipal threshold, so no distinct state-mandated EV charging permit standard applies here
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Circuit and conduit installed before concealment, if applicable; part of the combined 'Rough Trade' inspection
- 2
Final Inspection
Charger mounted, circuit labeled, and installation verified per the adopted 2020 NEC; inspector may verify electrician identity/licensure at discretion
See the full Kersey inspection guide — scheduling & re-inspection fees →
Tips
- Kersey does not price EV chargers separately from other electrical work — expect the same 'electrical only' permit process and fee used for any other electrical installation.
- As with any electrical-only permit in Kersey, make sure whoever is actually performing the EV charger installation matches the Colorado-licensed electrician's name on file — inspectors may re-verify identity/licensure at any inspection at their discretion. Contractor
- As one of this dataset's smaller Colorado jurisdictions, Kersey is well under the population threshold that would legally require it to adopt a distinct, streamlined EV charging permit process under Colorado HB24-1173.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kersey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Kersey
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Kersey project checklist
Describe your project once and get every permit, document, and fee it triggers in Kersey — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →