Change of Use / Change of Occupancy in Kersey, Colorado

The Town of Kersey adopted the International Existing Building Code, 2024 edition, by reference via Ordinance No. 2025-0010 (adopted 9/9/25), alongside the 2024 editions of the IBC, IRC, IFGC, IPC, IMC, International Property Maintenance Code, International Swimming Pool and Spa Code, and IECC — this is the governing code for a change of use or change of occupancy of an existing building within Town limits. No standalone 'change of use' application distinct from the general building-permit process was located on the Town's website.

Verified 2026-08-14 · Source

When you need this permit

  • Governed by the International Existing Building Code, 2024 edition, adopted by reference via Ordinance No. 2025-0010 (adopted 9/9/25)
  • No standalone change-of-use or change-of-occupancy application distinct from the general Town Building Permit process was found published on the Town's website as of this review
  • Building permitting is handled via the Town's CommunityCore online portal
  • Contact the Building Inspection Department (SAFEbuilt Windsor office, 970-353-1681 or 970-686-7511) to confirm requirements for a specific change-of-use project

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (if construction accompanies the change)No standalone change-of-use fee line was located on the Town's building-permit page. Contact the Building Inspection Department (970-353-1681) for a current fee quote.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Change of Occupancy permit actually take in Kersey?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection / Occupancy

    Verified against the approved permit application and applicable IEBC 2024 change-of-occupancy provisions

See the full Kersey inspection guide — scheduling & re-inspection fees →

Tips

  • Kersey has adopted the 2024 International Existing Building Code (Ordinance No. 2025-0010) as the governing code for change-of-use/change-of-occupancy analysis, even though the Town publishes no standalone change-of-use application distinct from its general Building Permit process — call the Building Inspection Department (970-353-1681) to confirm the applicable process for a specific project.

Frequently asked questions

Kersey requires a change of use / change of occupancy permit for: Governed by the International Existing Building Code, 2024 edition, adopted by reference via Ordinance No. 2025-0010 (adopted 9/9/25); No standalone change-of-use or change-of-occupancy application distinct from the general Town Building Permit process was found published on the Town's website as of this review; Building permitting is handled via the Town's CommunityCore online portal; Contact the Building Inspection Department (SAFEbuilt Windsor office, 970-353-1681 or 970-686-7511) to confirm requirements for a specific change-of-use project. If your project isn't listed, confirm with Town of Kersey Building Inspection Department (building inspection services contracted to SAFEbuilt Colorado, Windsor Office) at 970-353-1681 before starting work.

Kersey does not publish a plan-review timeline for this permit. Contact Town of Kersey Building Inspection Department (building inspection services contracted to SAFEbuilt Colorado, Windsor Office) at 970-353-1681 for current turnaround.

You'll need: Building Permit Application (Change of Use). See the required-documents checklist on this page for details on each.

Kersey requires 1 inspection(s) for a change of use / change of occupancy permit, in order: Final Inspection / Occupancy. Schedule each through Town of Kersey Building Inspection Department (building inspection services contracted to SAFEbuilt Colorado, Windsor Office) (970-353-1681).

Apply through Town of Kersey Building Inspection Department (building inspection services contracted to SAFEbuilt Colorado, Windsor Office) at 446 1st Street, P.O. Box 657, Kersey, CO 80644. Phone: 970-353-1681, email: kdamrell@kerseygov.com. Office hours: Not published on the Town of Kersey website (Building Inspection Department page, Administration Department page, or building permit how-to page were all checked directly). Town Hall main line 970-353-1681; SAFEbuilt Windsor office line 970-686-7511 (cited on the Town's Current Building Regulations page for building-code clarification); SAFEbuilt inspection requests may also be emailed to windsor@safebuilt.com per the Town's Re-Roofing guide.. Official information: https://www.kerseygov.com/departments/building_inspection_department/index.php.

Kersey, Colorado has adopted: 2024 International Residential Code (IRC) — actively cited as the current adopted code on all nine of the Town's SAFEbuilt-published 'Building Guides for Homeowners' (Additions, Accessory Structures, Re-Roofing, Basement Finish, Decks, Patio Covers/Carports, Window Replacement, Pole Barns, Swimming Pools), each stamped 'Document published by SAFEbuilt, Inc. 1.1.2026' and headed '2024 IRC' — these are the Town's most recently updated, actively maintained permitting documents (site-wide document-center timestamps show a 2026-03-30 publish date).; 2020 National Electrical Code (NEC) — per the Town's Planning Department 'Current Building Regulations' page, which references a '2020 NEC - Significant Changes Residential Electrical' resource alongside the Municipal Code Chapter 18 structure.; RESOLVED 2026-07-23 (live primary source, Municode Library, library.municode.com/co/kersey, Kersey Municipal Code 'VERSION: OCT 23, 2025 (CURRENT)', codified through Ordinance No. 2025-0008 enacted 6/10/2025): the Municipal Code's own home page lists 'Adopted Ordinances Not Yet Codified,' including Ordinance No. 2025-0010, adopted 9/9/2025, titled verbatim 'AN ORDINANCE ADOPTING BY REFERENCE THE INTERNATIONAL BUILDING CODE, 2024 EDITION, THE INTERNATIONAL RESIDENTIAL CODE, 2024 EDITION, THE INTERNATIONAL FUEL GAS CODE, 2024 EDITION, THE INTERNATIONAL PLUMBING CODE, 2024 EDITION, THE INTERNATIONAL MECHANICAL CODE, 2024 EDITION, THE INTERNATIONAL EXISTING BUILDING CODE, 2024 EDITION, THE INTERNATIONAL PROPERTY MAINTENANCE CODE, 2024 EDITION, THE INTERNATIONAL SWIMMING POOL and SPA CODE, 2024 EDITION, AND THE INTERNATIONAL ENERGY CONSERVATION CODE, 2024 EDITION, PROMULGATED BY THE INTERNATIONAL CODE COUNCIL.' This is a real, dated, numbered ordinance (not a guess or inference) and directly confirms the SAFEbuilt-published '2024 IRC' guides were current and correct — the Town has adopted 2024 editions of IBC, IRC, IFGC, IPC, IMC, IEBC, IPMC, ISPSC, and IECC, superseding the 2018/2012 editions still shown in Chapter 18's currently-codified section text (Sec. 18-19 Building Code = 2018 IBC, Sec. 18-44 Residential Code = 2018 IRC, Sec. 18-64 Mechanical Code = 2018 IMC, Sec. 18-89 Fuel Gas Code = 2018 IFGC, Sec. 18-109 Plumbing Code = 2018 IPC, Sec. 18-134 Energy Conservation Code = 2012 IECC, Sec. 18-154 Property Maintenance Code = 2018 IPMC, Sec. 18-179 Existing Building Code = 2018 IEBC) — those codified sections simply have not yet been updated in Municode's online supplement to reflect the 9/9/2025 ordinance, exactly as the Municode banner itself discloses ('This Code of Ordinances... may not reflect the most current legislation adopted by the Municipality'). Notably, Ordinance No. 2025-0010's list does NOT include the International Fire Code — Article X (Sec. 18-199, adopted separately by Ordinance No. 2021-0001) remains the 2018 International Fire Code with no 2024-edition update found. Per this corpus's practice of treating the more current, actively-distributed and now ordinance-confirmed source as authoritative, this file treats IBC/IRC/IFGC/IPC/IMC/IEBC/IPMC/ISPSC as 2024 editions (per Ord. No. 2025-0010, 9/9/2025) and IFC as the 2018 edition (per Ord. No. 2021-0001, 1/12/2021, locally amended by Sec. 18-200) — the prior 'partial' flag on the non-residential code editions is resolved.; HB22-1362 (Colorado statewide energy code floor, 2021 IECC + electric/solar/EV-ready provisions, effective window July 2023-July 2026): RESOLVED IN PART 2026-07-23 — Municode confirms Chapter 18, Article VII (Sec. 18-134) currently codifies the 2012 IECC (not the ambiguous, undated 'Energy Conservation Code' the static Current Building Regulations page implied), and the same live Ordinance No. 2025-0010 (adopted 9/9/2025, not yet codified) adopts by reference the 2024 IECC, which post-dates and satisfies HB22-1362's 2021-IECC-floor requirement. The Home Additions guide's instruction to submit an 'Energy Code Compliance Report (www.energycodes.gov) or REScheck calculations' is consistent with 2024 IECC compliance documentation but still does not itself name an edition year — the 2024 IECC edition-year figure comes from the Ordinance 2025-0010 citation above, not from the SAFEbuilt guide.. Local amendments apply — see the Kersey overview page for the full list.

The Town has adopted the 2024 International Existing Building Code (Ordinance No. 2025-0010) to govern change-of-use/change-of-occupancy of existing buildings, but publishes no standalone change-of-use application — contact the Building Inspection Department (970-353-1681) to confirm current requirements for a specific project.

Sources & verification

Verified against official sources. Last reviewed 2026-08-14.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kersey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.