EV Charger / Electric Vehicle Charging Station Permit in Lochbuie, Colorado

The Town of Lochbuie has no dedicated EV-charger or EVSE permit type or fee line. Installing a Level 2 (240V) home EV charger requires a standard Town of Lochbuie Electrical Permit for the new circuit or service work. As with all Lochbuie electrical work, fee-setting is explicitly deferred to the Colorado State Electrical Board (DORA) schedule plus a 15% Town surcharge -- Lochbuie does not run its own locally-set dollar-figure electrical fee table for circuit or panel work.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical work must be performed by a contractor holding a Colorado DORA Electrical license, plus Town of Lochbuie Class E contractor registration Contractor
  • Fee is charged per the Colorado State Electrical Board's own fee schedule (set under CRS 12-23-117 / 12-115-120), plus the Town's 15% surcharge, per the Town's April 2026 Fee Schedule, Section C item 7
  • If the EV charger is added as a residential amp-upgrade Electrical Service Change, it may qualify for the faster One Stop Permit track (no plan review required); state the number of amps being upgraded on the application
  • A simple new circuit added to an existing panel with no service change does not appear to independently qualify for the One Stop track -- confirm classification with the Town before applying

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Electrical Permit Fee (EV charger circuit or service work)
Town of Lochbuie Fees, updated April 2026, Section C item 7 -- a direct pass-through of the CRS 12-23-117(3) / 12-115-120 state-mandated schedule, not a locally-set fee table. Show full citationTown of Lochbuie Fees, updated April 2026, Section C item 7 -- a direct pass-through of the CRS 12-23-117(3) / 12-115-120 state-mandated schedule, not a locally-set fee table. No distinct 'EV charger'/'EVSE' line item exists; this is the same general electrical-permit mechanism used for any circuit or service work in Lochbuie. The underlying state-mandated fee table is documented in Douglas County's official 'Electrical Permit Application and Electrical Fee Schedule' (douglasco.gov, filename dated 2025, table itself internally dated 01/12/2023 -- the most recent published copy), Section B 'ALL OTHER FEES' (applicable to a non-square-footage-based residential circuit addition like an EV charger). This is the same statewide-capped rate every Colorado jurisdiction must use as its ceiling under CRS 12-23-117(3), but the exact current-year (2026) figure is not confirmed against a state-published 2026 update, so treat the computed $65.55 as indicative rather than certain -- confirm with the Town (303-990-5776) or State Electrical Board (303-894-7800) before budgeting.
Electrical Permit fees as charged by the State of Colorado Electrical Board, plus 15% -- base state rate found: $57.00 flat for installation valuation not more than $2,000 (a standalone EV charger circuit typically falls here), or $5 per $1,000/fraction thereof plus $57.00 for valuation above $2,000; with Lochbuie's 15% surcharge, approx. $65.55 for a sub-$2,000 installation
Class E (Electrical) Contractor License -- All Classes Registration FeeProrated quarterly by month of issue per the April 2026 fee schedule; required of the installing electrical contractor, separate from the permit fee itself
$15.00 per calendar year

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Lochbuie?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    New circuit, breaker sizing, and disconnect (if required by the charger manufacturer) verified before energizing

See the full Lochbuie inspection guide — scheduling & re-inspection fees →

Tips

  • Lochbuie's electrical fees are a direct pass-through of the Colorado State Electrical Board's own fee schedule plus the Town's 15% surcharge -- there is no locally-published flat-rate fee table for an EV charger circuit; the base rate is set by the State of Colorado, not the Town.
  • If your EV charger installation is framed as a residential Electrical Service Change (amp upgrade), it may qualify for the faster One Stop Permit track -- state the amperage upgrade on your application.
  • There is no dedicated 'EV charger' or 'EVSE' checkbox or fee line anywhere in Lochbuie's published fee schedule or permit requirements list -- treat it as ordinary electrical work.
  • Confirm the exact current pass-through rate with the Town (303-990-5776 or building@lochbuie.org) or the Colorado State Electrical Board (303-894-7800) before budgeting, since the dollar amount is not published by Lochbuie itself.

Frequently asked questions

Lochbuie requires an ev charger / electric vehicle charging station permit for: Electrical work must be performed by a contractor holding a Colorado DORA Electrical license, plus Town of Lochbuie Class E contractor registration; Fee is charged per the Colorado State Electrical Board's own fee schedule (set under CRS 12-23-117 / 12-115-120), plus the Town's 15% surcharge, per the Town's April 2026 Fee Schedule, Section C item 7; If the EV charger is added as a residential amp-upgrade Electrical Service Change, it may qualify for the faster One Stop Permit track (no plan review required); state the number of amps being upgraded on the application; A simple new circuit added to an existing panel with no service change does not appear to independently qualify for the One Stop track -- confirm classification with the Town before applying. If your project isn't listed, confirm with Town of Lochbuie Building Department (Community Development), building services contracted to SAFEbuilt at 303-655-9308 before starting work.

Lochbuie does not publish its own dollar-figure electrical fee table -- the cost is whatever the Colorado State Electrical Board charges for the corresponding electrical work, plus a 15% Town surcharge. Based on the statewide-capped rate found via Douglas County's published copy of the state schedule, a standalone circuit (valuation $2,000 or less) works out to roughly $65.55 ($57.00 base plus 15%), though this figure's currency for 2026 is not independently confirmed. Contact the Town (303-990-5776) or the State Electrical Board (303-894-7800) for a current quote.

Lochbuie does not publish a plan-review timeline for this permit. Contact Town of Lochbuie Building Department (Community Development), building services contracted to SAFEbuilt at 303-655-9308 for current turnaround.

You'll need: Town of Lochbuie Electrical Permit application. See the required-documents checklist on this page for details on each.

Lochbuie requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Electrical Inspection. Schedule each through Town of Lochbuie Building Department (Community Development), building services contracted to SAFEbuilt (303-655-9308).

Apply through Town of Lochbuie Building Department (Community Development), building services contracted to SAFEbuilt at 703 Weld County Rd. 37 (WCR 37), Lochbuie, CO 80603. Phone: 303-655-9308, email: building@lochbuie.org. Office hours: Town of Lochbuie main line 303-655-9308 (fax 303-655-9311/9312), Monday-Thursday 7am-6pm (4-day/10-hour Town office schedule per site footer). Inspections are scheduled and performed by SAFEbuilt directly: 303-774-0454 or firestone-building@safebuilt.com. Chief Building Official (SAFEbuilt) Tim Moroney: 970-545-3555. Community Development Director Kevin Wrede: 303-990-5324. Community Development Technician Rachael Bender (fee payments): 303-990-5776.. Official information: https://www.lochbuie.org/community-dev/page/building-permits-and-inspections.

Lochbuie, Colorado has adopted: 2021 International Plumbing Code (IPC) — per the Town's live Building Department webpage (Adopted Building Codes section), the current governing statement; 2021 International Energy Conservation Code (IECC) — per the same live webpage statement; 2023 National Electrical Code (NEC) — per the same live webpage statement; Municipal Code Chapter 18 (Building Regulations), Town of Lochbuie — the Town's webpage directs to 'Chapter 18 - Building Regulations' of the Municode-hosted Municipal Code for local amendments. The department webpage's own explicit code-list statement (2021 IPC/IECC, 2023 NEC) is treated as the current, governing, actively-maintained source, since a live department page is a stronger authority than a static/undated artifact.; Document-currency conflict: three different code vintages appear across the Town's own published materials — the live Building Permits webpage states 2021 IPC/2021 IECC/2023 NEC; the 'Design Criteria Town of Lochbuie' PDF (undated) lists 2018 IRC/2018 IECC/2017 NEC for residential and 2018 IBC/IPC/IMC/IFGC/IECC/2017 NEC for commercial, plus 2018 IPMC/IEBC/Swimming Pool & Spa Code as 'Other Adopted Codes'; and SAFEbuilt's own trade-specific guidance documents cite yet other editions (PV Submittal Requirements, last revised 10.22.2021, cites '2020 NEC, 2018 International Codes'; the Re-Roof Requirements guide states 'Current code 2018 IRC'). No IBC or IRC edition is named anywhere on the live Building Permits webpage itself — only IPC, IECC, and NEC are explicitly stated there. Because the department's own webpage is the most current authority, this record treats 2021 IPC/2021 IECC/2023 NEC as current, and lists 2018-cycle IRC/IBC/IMC/IFGC/IPMC/IEBC/Swimming Pool & Spa Code from the Design Criteria PDF as the best-available (but visibly stale, per the department's own newer NEC/IPC/IECC citations) reference point for those code families pending confirmation directly with the Building Department.; 2018 International Residential Code (IRC) — per the Design Criteria Town of Lochbuie PDF (undated, 'Residential Construction' column); not restated on the live webpage, so carried at partial confidence pending direct confirmation; 2018 International Building Code (IBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC) — per the same Design Criteria PDF ('Commercial Construction' column); not restated on the live webpage, partial confidence; 2018 International Property Maintenance Code (IPMC), 2018 International Existing Building Code (IEBC), 2018 Swimming Pool & Spa Code — per the same Design Criteria PDF ('Other Adopted Codes' column); partial confidence. Local amendments apply — see the Lochbuie overview page for the full list.

No. The Town of Lochbuie has no dedicated EV-charger or EVSE permit type or fee line. A home Level 2 charger circuit is permitted as an ordinary Electrical Permit, with fees set by the Colorado State Electrical Board's own schedule plus a 15% Town surcharge.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lochbuie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Lochbuie's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Lochbuie yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Lochbuie lands. Privacy.