Electrical Permit in Mead, Colorado

Required for electrical wiring, service, and system modifications in the Town of Mead. Governed by the 2024 NEC as adopted by Ordinance No. 1092. Electrical fees are calculated according to the State of Colorado Electrical Board's fee schedule rather than Mead's own valuation table.

Verified 2026-07-06 · Source

When you need this permit

  • Permit required for adding electrical wiring, per the Town's 'Do I Need A Building Permit?' page
  • Governed by the 2024 NEC as adopted by Ordinance No. 1092
  • Electrical fees are calculated according to the most current version of the State of Colorado Electrical Board fee schedule, plus or minus 15%, per the Town's Comprehensive Fee Schedule
  • General Town of Mead business license required for the performing electrical contractor (no separate Town trade license required)
  • Application must be submitted online via the CommunityConnect Portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical FeesTown of Mead Comprehensive Fee Schedule, effective June 1, 2026, p.11 — Mead does not publish its own flat electrical fee table; it ties the fee to the state board's schedule
Calculated according to the most current State of Colorado Electrical Board fee schedule (+/-15%)
Reinspection Fee
$75

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Mead?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized

See the full Mead inspection guide — scheduling & re-inspection fees →

Tips

  • Mead ties its electrical permit fee directly to the State of Colorado Electrical Board's own fee schedule (+/-15%), rather than publishing its own flat electrical fee table — check the current state board schedule to estimate cost.
  • No separate Town of Mead contractor license is required for electrical work, but the Town's general $30 business license still applies to anyone conducting business in Mead. Contractor

Frequently asked questions

Mead requires an electrical permit for: Permit required for adding electrical wiring, per the Town's 'Do I Need A Building Permit?' page; Governed by the 2024 NEC as adopted by Ordinance No. 1092; Electrical fees are calculated according to the most current version of the State of Colorado Electrical Board fee schedule, plus or minus 15%, per the Town's Comprehensive Fee Schedule; General Town of Mead business license required for the performing electrical contractor (no separate Town trade license required); Application must be submitted online via the CommunityConnect Portal. If your project isn't listed, confirm with Town of Mead Building Division (building administration contracted to SAFEbuilt Colorado) at 970.535.4477 (Town Building Division) / 970.545.3555 (SAFEbuilt Building Official Tim Moroney) / 303.774.1388 (SAFEbuilt Colorado main line) before starting work.

Per the Town's Comprehensive Fee Schedule, electrical fees are calculated according to the most current version of the State of Colorado Electrical Board fee schedule, plus or minus 15% — Mead does not publish its own separate flat electrical fee table.

Mead does not publish a plan-review timeline for this permit. Contact Town of Mead Building Division (building administration contracted to SAFEbuilt Colorado) at 970.535.4477 (Town Building Division) / 970.545.3555 (SAFEbuilt Building Official Tim Moroney) / 303.774.1388 (SAFEbuilt Colorado main line) for current turnaround.

You'll need: Electrical Permit Application (CommunityConnect Portal). See the required-documents checklist on this page for details on each.

Mead requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Mead Building Division (building administration contracted to SAFEbuilt Colorado) (970.535.4477 (Town Building Division) / 970.545.3555 (SAFEbuilt Building Official Tim Moroney) / 303.774.1388 (SAFEbuilt Colorado main line)).

Apply through Town of Mead Building Division (building administration contracted to SAFEbuilt Colorado) at Mead Town Hall, 441 Third Street, Mead, CO 80542 (SAFEbuilt Colorado office: 11409 Business Park Circle, Suite 350, Firestone, CO 80504). Phone: 970.535.4477 (Town Building Division) / 970.545.3555 (SAFEbuilt Building Official Tim Moroney) / 303.774.1388 (SAFEbuilt Colorado main line), email: tmoroney@safebuilt.com (SAFEbuilt Building Official Tim Moroney); firestone-building@safebuilt.com (SAFEbuilt Inspection Requests); safebuiltcoloradoplanreview@safebuilt.com (SAFEbuilt Plan Review re-submittals). Office hours: Monday-Friday, 8 a.m. to 5 p.m. (Building Division contact hours, per townofmead.org/building); Mead Town Hall itself is open 8 a.m. to 4:30 p.m. Monday through Friday. Official information: https://www.townofmead.org/building.

Mead, Colorado has adopted: 2024 International Building Code (IBC) — adopted by Town of Mead Ordinance No. 1092, per the Town's own Building Codes page (townofmead.org/building/page/building-codes); 2024 International Residential Code (IRC) — adopted by Ordinance No. 1092; 2024 International Mechanical Code (IMC) — adopted by Ordinance No. 1092; 2024 International Plumbing Code (IPC) — adopted by Ordinance No. 1092; 2024 National Electrical Code (NEC) — adopted by Ordinance No. 1092; 2024 International Fuel Gas Code (IFGC) — adopted by Ordinance No. 1092; 2024 International Energy Conservation Code (IECC) — adopted by Ordinance No. 1092; 2024 International Property Maintenance Code (IPMC) — adopted by Ordinance No. 1092; 2024 International Existing Building Code (IEBC) — adopted by Ordinance No. 1092; 2024 International Swimming Pool and Spa Code (ISPSC) — adopted by Ordinance No. 1092; 2021 International Fire Code (IFC) — adopted by Ordinance No. 1036 (older edition than the 2024 suite; not updated alongside the other 2024-edition codes as of this verification); Weld County Code Concerning On-Site Waste-Water Treatment System Regulations, Chapter 30 — adopted by Ordinance No. 892; Source: Town of Mead Building Codes page (table of Current Building Code / Edition Year / Ordinance Number), https://www.townofmead.org/building/page/building-codes. Local amendments apply — see the Mead overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mead building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.