Skip to main content
PermitBase

Mead building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Mead, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
Mead Town Hall, 441 Third Street, Mead, CO 80542 (SAFEbuilt Colorado office: 11409 Business Park Circle, Suite 350, Firestone, CO 80504)
Phone
970.535.4477 (Town Building Division) / 970.545.3555 (SAFEbuilt Building Official Tim Moroney) / 303.774.1388 (SAFEbuilt Colorado main line)
Office hours
Monday-Friday, 8 a.m. to 5 p.m. (Building Division contact hours, per townofmead.org/building); Mead Town Hall itself is open 8 a.m. to 4:30 p.m. Monday through Friday

Inspection guide

See how inspections work in Mead — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2024 International Building Code (IBC) — adopted by Town of Mead Ordinance No. 1092, per the Town's own Building Codes page (townofmead.org/building/page/building-codes)
  • 2024 International Residential Code (IRC) — adopted by Ordinance No. 1092
  • 2024 International Mechanical Code (IMC) — adopted by Ordinance No. 1092
  • 2024 International Plumbing Code (IPC) — adopted by Ordinance No. 1092
  • 2024 National Electrical Code (NEC) — adopted by Ordinance No. 1092
  • 2024 International Fuel Gas Code (IFGC) — adopted by Ordinance No. 1092
  • 2024 International Energy Conservation Code (IECC) — adopted by Ordinance No. 1092
  • 2024 International Property Maintenance Code (IPMC) — adopted by Ordinance No. 1092
  • 2024 International Existing Building Code (IEBC) — adopted by Ordinance No. 1092
  • 2024 International Swimming Pool and Spa Code (ISPSC) — adopted by Ordinance No. 1092
  • 2021 International Fire Code (IFC) — adopted by Ordinance No. 1036 (older edition than the 2024 suite; not updated alongside the other 2024-edition codes as of this verification)
  • Weld County Code Concerning On-Site Waste-Water Treatment System Regulations, Chapter 30 — adopted by Ordinance No. 892
  • Source: Town of Mead Building Codes page (table of Current Building Code / Edition Year / Ordinance Number), https://www.townofmead.org/building/page/building-codes

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
5units

5 buildings · $2.2M valuation

Trailing 12 months
84units

12 of 12 months reported · #32 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
32units

32 buildings · $17.6M valuation

5 month(s) reported to Census

Full year 2025
88units

88 buildings · $40.9M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Mead's Building Division is administered under contract by SAFEbuilt Colorado; the Building Official is Tim Moroney (tmoroney@safebuilt.com, 970.545.3555), and inspection requests route to firestone-building@safebuilt.com or 303.774.0454. The Town's own Permit Technician, Ana Bohl, handles portal/administrative questions at 970.805.4197.
  • All permit applications — including One-Stop Permits — must be submitted through the CommunityConnect online portal; paper applications have not been accepted since January 27, 2021.
  • The Town does not require its own contractor trade license, but does require a general $30 annual Town of Mead business license for anyone conducting business (including contractors) within Town limits.
  • Development Impact Fees are a substantial addition to the cost of new residential construction ($17,319 for a detached single-family home as of the June 1, 2026 fee schedule) and are adjusted every January 1 based on a 5-year construction-cost-index formula — budget for the current-year rate rather than a prior year's figure.
  • The Town's adopted code suite is mostly the 2024 I-Codes (via Ordinance No. 1092), but the International Fire Code is still the 2021 edition (Ordinance No. 1036) — do not assume every adopted code shares the same 2024 edition year.
  • No jurisdiction-published numeric plan-review or permit-issuance turnaround time exists anywhere on townofmead.org or in the Comprehensive Fee Schedule; every permit type in this file reflects that genuine gap rather than an invented figure.

Comparable nearby cities

Firestone
Both in Weld County10 shared permit types~5 mi away
Compare fees →
Johnstown
Both in Weld County10 shared permit types~7 mi away
Compare fees →
Milliken
Both in Weld County10 shared permit types~9 mi away
Compare fees →