Residential/Commercial Solar Photovoltaic (PV) Permit — Star, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://staridaho.org/DocumentCenter/View/1603/Mechanical-Electrical--Plumbing-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential/Commercial Solar Photovoltaic (PV) Permit in Star, Idaho
Required for installation of a rooftop or ground-mounted solar photovoltaic system in Star. The City's own Mechanical, Electrical & Plumbing Fee Schedule (Resolution 2025-03, approved 6/17/2025) explicitly lists 'solar' as one of the project types billed under the Electrical Permit's 'Commercial/Other — valuation-based' fee tier, rather than under the flat per-square-footage residential wiring tiers — a real, distinct, City-published fee mechanism for solar. A separate Building Permit (Table 1-A, valuation-based) applies to the mounting/racking structural scope.
Verified 2026-07-20 · Source
When you need this permit
- Electrical interconnection/wiring for a solar PV system is billed under the Electrical Permit's 'Commercial/Other' valuation-based fee tier, per the City's MEP Fee Schedule, which explicitly states this tier 'applies to commercial, industrial, solar, fire alarm, new SF residential over 4,500 sq. ft., multi-family'
- Mounting/racking structural work is permitted via the standard Residential or Commercial Building Permit (Table 1-A, valuation-based), using the same IWORQ Permit Portal process documented elsewhere in this file
- Apply via IWORQ Permit Portal (staridpermit.portal.iworq.net); contractor must be registered in the City system before accessing the portal
- Homeowners may perform their own electrical work on their primary/secondary residence; commercial-scope work requires an Idaho state-licensed electrical contractor Owner-builderContractor
- Governed by the 2023 National Electrical Code (NEC) — adopted statewide by the Idaho Electrical Board (IDAPA 24.39.10), effective July 1, 2024 — for the interconnection scope, and the 2018 IBC/IRC for the structural mounting scope
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Interconnection wiring, disconnect placement, and conduit before energizing; schedule online via IWORQ Portal before 4:00 PM for next-business-day inspection.
- 2
Final Electrical / Interconnection
Panel/array wiring complete, disconnect labeled, system ready for utility interconnection.
See the full Star inspection guide — scheduling & re-inspection fees →
Tips
- Star's own Mechanical, Electrical & Plumbing Fee Schedule (Resolution 2025-03) is one of the few documents in this batch of jurisdictions to explicitly name 'solar' as its own billed category — it is priced on the Commercial/Other valuation-based tier, not the flat per-square-footage new-home wiring tiers.
- Budget for two separate permits: an Electrical Permit (interconnection, billed on the Commercial/Other valuation tier) and, if the racking/mounting changes the structure, a Building Permit (Table 1-A valuation-based).
- Electrical permits are typically issued same-day if the associated building permit (if one is required) is already approved, per the Star Building Department FAQ.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Star building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Star
Residential/Commercial Solar Photovoltaic (PV) Permit in other cities
Compare residential/commercial solar photovoltaic (pv) permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Star project checklist
Describe your project once and get every permit, document, and fee it triggers in Star — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →