Residential Building Permit (New Construction) — Star, Idaho · Requirements sheet
Verified 2026-07-16 · Source: https://staridaho.org/1243/Building-Department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Star, Idaho
Required for all new single-family residential construction in Star. Applications submitted and payments made online through the IWORQ Permit Portal. Plans must be 24" × 36", submitted in landscape orientation as PDF. Contractors must register before accessing the portal. Typical review: small residential projects 2–4 weeks; larger residential projects approximately 4–6 weeks. Revisions add 3–4 weeks per cycle.
Verified 2026-07-16 · Source
When you need this permit
- All new construction requires a building permit
- Contractors must complete the Contractor Registration Form before accessing the permit portal Contractor
- All plans submitted online via IWORQ Portal (staridpermit.portal.iworq.net); no in-person paper submissions
- Plan size must be 24" × 36" in landscape orientation with space reserved for City approval stamps
- Sewer certificate required from Star Sewer & Water District for all new homes with sewer service
- If structure is in flood plain, contact the City Zoning Administrator before submitting
- Structures 4,000 sq. ft. or more require Fire review for hydrant flow adequacy
- Soils/geotechnical report required if project includes a basement; must be stamped by Idaho licensed engineer
- Structural drawings and calculations must be stamped, signed, and dated by Idaho licensed design professional if applicable
- Fire sprinkler/alarm plans (3 sets, under separate cover) if required — may be deferred
- Energy compliance required: Alternate Energy Path (signed, all pages) or Prescriptive Method
- Plans must include a plan check report as the first pages of the submittal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 6 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing / Foundation
Schedule online via IWORQ Portal before 4:00 PM for next-business-day inspection. No phone or email inspection requests accepted.
- 2
Framing / Rough-In
After framing and rough-in trades complete, before insulation or wall cover. Rough and final inspections cannot be scheduled for the same day.
- 3
Final
All work complete per approved plans; Certificate of Occupancy issued after passing final inspection. Rough and final inspections cannot be scheduled same day.
See the full Star inspection guide — scheduling & re-inspection fees →
Tips
- Small residential projects review in 2–4 weeks; larger residential projects approximately 4–6 weeks. Each revision or correction cycle adds 3–4 weeks.
- All inspection requests must be submitted online through the IWORQ Portal by 4:00 PM the business day before the inspection is needed — no phone or email inspection requests accepted.
- Rough and final inspections cannot be scheduled on the same day.
- Contractors must register with the City before accessing the permit portal; use the Contractor Registration Form on the building department website. Contractor
- Contact your HOA before contacting the building department — HOA restrictions may be stricter than city code, and the building department has no authority over HOAs.
- A sewer certificate from Star Sewer & Water District (208-286-7388) is required for all new homes on public sewer before obtaining a building permit.
- Plan reviews become null and void if no progress or payment within 180 days of the last plan review completion; expired plan reviews are not eligible for extension or refund.
- Working without a permit may result in double fees, civil penalties, or both.
- Up to 80% refund of permit fee on written request, depending on number of inspections performed; 20% retained as processing cost.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Star building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Star
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Star project checklist
Describe your project once and get every permit, document, and fee it triggers in Star — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →