Residential Building Permit (New Construction / Addition) in Unincorporated Bannock County, Idaho

Required for new single-family dwellings, additions, and alterations, and most accessory structures (garages, shops, pole barns) in unincorporated Bannock County. Governed by the Building Code Ordinance of Bannock County (Ordinance No. 2020-07, effective January 1, 2021), which adopts the 2018 IBC/IRC/IECC/IEBC with local amendments. Plan review and permitting are handled by Bannock County Planning and Development Services; applications are submitted through the County's online ViewPoint Cloud portal or in person at the Planning and Development office.

Verified 2026-07-08 · Source

When you need this permit

  • Building permit required for constructing, enlarging, altering, repairing, moving, demolishing, or changing the occupancy classification of a building or structure in unincorporated Bannock County
  • Completed and signed permit application form (no empty boxes)
  • Copy of current, recorded property deed showing name(s) of owner(s)
  • Site plan meeting County site plan requirements: roughly to scale, north arrow, dimensions and setbacks of proposed/existing structures, location/width of easements, roads, driveways, parking, rights-of-way, canals, septic tank and drainfield location, and relevant natural features
  • Building plans (electronic submittal, or 1 paper copy) including floor plan with dimensions, wall section from footing to trusses, truss engineering specifications (member sizes and state-required snow load), and elevations for all directions
  • Sizing and placement shown or noted for footing/foundation dimensions, rebar/anchor bolts/hold-downs, and wall/floor joist/truss member sizes
  • Post-frame (pole barn) and steel buildings: stamped engineering typically required for non-prescriptive designs; Bannock County's Post-Frame (Pole Barn) Guide is available as a basic plan-submittal design aid for prescriptive residential accessory structures
  • Snow/roof load compliance based on elevation (35–100+ PSF roof live load depending on elevation band; see County design criteria table)
  • If a new septic system is being installed, a permit from Southeastern Idaho Public Health is required; if increasing bedroom count on an existing septic system, written approval from the same agency is required
  • If within the Chubbuck Area of City Impact and installing a new septic system, a completed Sewer Availability Release Form from the Chubbuck Impact Area Wastewater Collection Authority (CIAWCA) is required
  • If connecting to a municipal sewer or water system, written approval from the servicing entity is required
  • If the project disturbs 1+ acre of land, a Construction General Permit from the EPA is required
  • If disturbing more than a quarter acre within the Bannock Urbanized Area, an Erosion and Sediment Control permit/licensure is required (coordinated with the City of Pocatello)
  • Manufactured/mobile homes: installation permit required prior to placement; must be HUD-certified and installed on a permanent foundation per the Idaho Manufactured Home Installation Standard
  • Electrical, plumbing, mechanical, and fuel-gas work is NOT permitted by Bannock County — apply separately to the Idaho Division of Occupational and Professional Licenses (DOPL)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building permit fee — $1.00 to $500 valuationBannock County Building Code Ordinance No. 2020-07, Appendix A, Table No. 1-A (extracted from the 1997 Uniform Building Code), effective January 1, 2021
$23.00
Building permit fee — $501 to $2,000 valuationOrdinance No. 2020-07, Appendix A, Table No. 1-A
$23.50 for the first $500, plus $3.05 for each additional $100 or fraction thereof
Building permit fee — $2,001 to $25,000 valuationOrdinance No. 2020-07, Appendix A, Table No. 1-A
$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof
Building permit fee — $25,001 to $50,000 valuationOrdinance No. 2020-07, Appendix A, Table No. 1-A
$391.25 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof
Building permit fee — $50,001 to $100,000 valuationOrdinance No. 2020-07, Appendix A, Table No. 1-A
$643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof
Building permit fee — $100,001 to $500,000 valuationOrdinance No. 2020-07, Appendix A, Table No. 1-A
$993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof
Building permit fee — $500,001 to $1,000,000 valuationOrdinance No. 2020-07, Appendix A, Table No. 1-A
$3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof
Building permit fee — $1,000,001 and up valuationOrdinance No. 2020-07, Appendix A, Table No. 1-A
$5,608.75 for the first $1,000,000, plus $3.15 for each additional $1,000 or fraction thereof

Review timeline

Plan reviewUnincorporated Bannock County’s published plan-review target
7–10 business days

How long did your Residential Building Permit (New Construction / Addition) permit actually take in Unincorporated Bannock County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing

    Foundation excavation and footing form/rebar inspection prior to pour

  2. 2

    Framing

    Structural framing, wall/roof sheathing, and rough-ins complete before insulation or wall cover

  3. 3

    Final

    All work complete per approved plans before occupancy

See the full Unincorporated Bannock County inspection guide — scheduling & re-inspection fees →

Tips

  • Call 208-236-7090 to request an inspection. A permit must be issued and active before an inspection can be requested. A 24-hour notice is required; requests made after hours are processed the next business day. Inspections occur Monday–Thursday 8:00 AM–5:00 PM and Friday 8:00 AM–1:00 PM. Specific inspection times cannot be requested.
  • Electrical, plumbing, mechanical, and fuel-gas fixtures are NOT permitted or inspected by Bannock County. Contact the Idaho Division of Occupational and Professional Licenses (DOPL) at 1-800-955-3044 or dbs.idaho.gov.
  • Post-frame (pole barn) construction is common in unincorporated Bannock County; the County publishes a dedicated Post-Frame (Pole Barn) Guide as a design aid for prescriptive plan submittals.
  • Snow/roof live loads are elevation-dependent in Bannock County, ranging from 35 PSF roof live load / 44 PSF ground snow load below 4,600 feet up to 100 PSF roof live load / 125 PSF ground snow load above 6,800 feet.
  • Structures under 200 square feet and under 12 feet high used as a tool shed, playhouse, or similar accessory use, fences 7 feet or less, retaining walls 4 feet or less, playground equipment, detached decks under 200 square feet and less than 30 inches above grade, and swimming pools under 5,000 gallons and less than 48 inches deep do not require a building permit — but a zoning/development permit may still apply.
  • Habitable space, communication towers, and photovoltaic (solar) systems always require a building permit even if they would otherwise fall under a size exemption.
  • An address is typically issued at the same time as the first building permit for a property. Addresses are not assigned to agricultural-exempt buildings or structures under 200 square feet.
  • If the property is served by septic, contact Southeastern Idaho Public Health (208-239-5276) — a new system requires a permit, and adding bedrooms to a home on an existing system requires written approval.

Frequently asked questions

Yes, if it exceeds the size/height exemption (200 square feet and 12 feet high for simple accessory structures like tool sheds). Post-frame (pole barn) buildings commonly need a building permit; Bannock County publishes a Post-Frame (Pole Barn) Guide as a design aid for prescriptive plan submittals. Larger or non-prescriptive designs require stamped engineering. Source: bannockcounty.gov/planning/ (Building Documents) and Building Permit Exemptions FAQ.

Fees are valuation-based per Table No. 1-A in Appendix A of Ordinance No. 2020-07 (extracted from the 1997 Uniform Building Code). For example, a project valued at $150,000 would be charged $993.75 for the first $100,000 plus $5.60 for each additional $1,000 (50 x $5.60 = $280), totaling $1,273.75. Source: Building Code Ordinance of Bannock County, Ordinance No. 2020-07, Appendix A.

Bannock County Planning and Development states it is usually able to issue permits within seven to ten business days of receiving a complete application with all necessary supporting documentation. The full process — from receipt of a complete application to permit issuance — can take 2 to 4 weeks depending on current workload, with summer and fall typically busier. Source: bannockcounty.gov/planning/ (FAQ and Plan Reviews sections).

You'll need: Building Permit Application; Site Plan; Building Plans (floor plan, wall section, truss engineering, elevations); Copy of Recorded Property Deed. Depending on your project, Unincorporated Bannock County may also ask for: Letter of Authorization (if applicant is not the owner); Prescriptive Specification Worksheet; Post-Frame (Pole Barn) Guide submittal drawing; Southeastern Idaho Public Health Septic Permit or Approval. See the required-documents checklist on this page for details on each.

Unincorporated Bannock County requires 3 inspection(s) for a residential building permit (new construction / addition), in order: Footing, Framing, Final. Schedule each through Bannock County Planning and Development Services (208-236-7230).

Apply through Bannock County Planning and Development Services at 5500 S. 5th Avenue, Pocatello, ID 83204. Phone: 208-236-7230, email: development@bannockcounty.gov. Office hours: Monday–Thursday 8:00 AM – 5:00 PM, Friday 8:00 AM – 1:00 PM; closed all federal holidays. Official information: https://www.bannockcounty.gov/planning/.

Unincorporated Bannock County, Idaho has adopted: 2018 International Building Code (IBC) — adopted via Ordinance No. 2020-07, Building Code Ordinance of Bannock County; 2018 International Residential Code (IRC), Parts I–III and Part IX — adopted via Ordinance No. 2020-07; 2018 International Energy Conservation Code (IECC) — adopted via Ordinance No. 2020-07, with Idaho-specific amendments to Sections R402.6 (log home thermal envelope), R403.5.3 (hot water pipe insulation), R404.1 (lighting equipment), and R406.3/R406.4 (Energy Rating Index, Climate Zone 6 = ERI 68); 2018 International Existing Building Code (IEBC) — adopted via Ordinance No. 2020-07; 2018 International Solar Energy Provisions (ISEP) — adopted via Ordinance No. 2020-07; 2018 International Swimming Pool and Spa Code (ISPSC) — adopted via Ordinance No. 2020-07; 2018 International Wildland-Urban Interface Code (IWUIC) — adopted via Ordinance No. 2020-07; Uniform Code for the Abatement of Dangerous Buildings, 1994 edition — adopted via Ordinance No. 2020-07; ANSI 117.1 Accessibility and Usable Building and Facilities, 2003 edition — adopted via Ordinance No. 2020-07; Bannock County Zoning Ordinance No. 1998-1 (as amended); Bannock County Flood Damage Prevention Ordinance. Local amendments apply — see the Unincorporated Bannock County overview page for the full list.

No. Per Section 301.B of the Building Code Ordinance of Bannock County (Ordinance No. 2020-07), all references to fuel gas, mechanical, plumbing, and electrical work in the adopted codes are referred to the State of Idaho. These permits and inspections are handled by the Idaho Division of Occupational and Professional Licenses (DOPL), not the County. Contact DOPL at 1-800-955-3044 or dbs.idaho.gov. Source: Building Code Ordinance of Bannock County, Ordinance No. 2020-07, Section 301.B.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Bannock County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare residential building permit (new construction / addition) fees across Idaho

Look up this fee in a different city →

Embed this data card →

Now live

Build your Unincorporated Bannock County project checklist

Describe your project once and get every permit, document, and fee it triggers in Unincorporated Bannock County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →