Skip to main content
PermitBase

Rigby building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Rigby, Idaho.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
158 West Fremont Avenue, Rigby, ID 83442 (City Hall); building permit applications submitted via Jefferson County PZ&B, 210 Courthouse Way, Suite 170, Rigby, ID 83442
Phone
(208) 745-8111
Email
Office hours
Mon–Fri, City Hall business hours; Jefferson County PZ&B Mon–Fri 9:00 AM – 5:00 PM

Inspection guide

See how inspections work in Rigby — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • International Building Code (IBC), current Idaho State Edition — adopted by City of Rigby Ordinance 2011-551 (7-19-2011), amended by Ordinance 2021-619 (9-14-2021); City Code 9-1-1
  • International Residential Code (IRC), current Idaho State Edition — City Code 9-1-1; Jefferson County's own Rigby-specific application help documents state 'ALL CONSTRUCTION MUST COMPLY WITH THE 2018 IRC'
  • International Mechanical Code (IMC), current Idaho State Edition — City Code 9-1-1
  • International Fuel Gas Code (IFGC), current Idaho State Edition — City Code 9-1-1
  • International Energy Conservation Code (IECC), current Idaho State Edition — City Code 9-1-1
  • International Existing Building Code (IEBC), current Idaho State Edition — City Code 9-1-1
  • NFPA 70 National Electrical Code, as currently required by the State of Idaho — City Code 9-1-1
  • Idaho Plumbing Code, as currently required by the State of Idaho — City Code 9-1-1; governing electrical and plumbing code is 'that as most currently adopted by the State of Idaho Division of Building Safety' per 9-1-1(B)(2)

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date
No data reported
Latest full year
No data reported

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • Rigby is a genuine co-administration jurisdiction, not a pure pass-through to Jefferson County and not a fully independent building department. The City of Rigby has its own City Code Title 9, Chapter 1 (Building Code and Regulations) that adopts the building code and authorizes permit issuance, its own Building/Zoning/Public Works intake and processes for zoning permits, water/sewer connections, and sidewalk inspections — but building permit applications for houses, townhouses, and additions are submitted through the shared Jefferson County PZ&B Cityworks portal, with county staff performing plan review and most inspections. The final Certificate of Occupancy or Certificate of Completion is issued by the city itself, per the county's own written process ('if the property is within incorporated city limits, the documentation will be forwarded to the city, and they will issue the CO or CC').
  • As of June 1, 2026, Jefferson County PZ&B took over new Mechanical (HVAC) permit processing and inspection for Rigby specifically, following a Joint Powers Agreement the Rigby City Council approved (discussed Feb. 19, 2026) and a subsequent public ordinance-adoption process (public hearing March 19, 2026). This was a narrow, recent expansion specific to Rigby — a January 2026 county announcement about new HVAC permitting explicitly excluded 'those within city limits,' confirming this Rigby carve-out came later and separately.
  • Plumbing and electrical inspections for Rigby construction were still routed through the Idaho Division of Occupational and Professional Licenses (DOPL) as of the most recent reporting found (March 2026) — the county had not yet hired the journeyman-credentialed inspectors that state law requires for those trades to transition to county inspection. This is an actively moving target; confirm current status before relying on it.
  • Rigby requires its own Zoning Permit/Zoning Certificate as a companion approval — this is not optional paperwork, it is explicitly listed as a required field/attachment on the county's own 'Rigby – Single Family Dwelling, Townhouse and Additions' building permit help document.
  • Decks up to 120 sq ft only need Rigby's simple city-issued Deck Permit; decks over 120 sq ft require the full county-processed building permit. The same city-direct model applies to Fence, Garage/Shed (accessory structures), Sign, Solar (structural placement), and Sidewalk/Curb/Approach permits — these are obtained directly from Rigby City Hall, not through the Cityworks portal.
  • Water and Sewer Connection Fees are billed separately by the City of Rigby, due at the time of building permit application — budget for this in addition to the county's building-permit fee invoice. No published dollar figure for this fee was found during this research pass; confirm the amount directly with Rigby City Hall or Public Works.
  • Applications go through the Jefferson County Cityworks public portal — Chrome or Firefox required, account activation mandatory before submitting.
  • Minimum 15 business days for plan review on a non-commercial (residential) building permit, per the county's official process document that governs the shared portal Rigby applications flow through.
  • A recorded warranty deed and either an Idaho Contractor's License or a completed Contractor Exemption form are required on every residential building permit application.
  • The Plan Review Fee (15% of the building permit fee), GIS/Mapping Fee ($30), and Technology Fee ($30) are added on top of the valuation-based county building permit fee for every application processed via Cityworks.
  • Minimum 24 hours' notice is required for any county inspection request.

Related guides

Comparable nearby cities

Unincorporated Jefferson County
Both in Jefferson County3 shared permit types
Compare fees →
Rexburg
3 shared permit types~12 mi away
Compare fees →
Ammon
3 shared permit types~14 mi away
Compare fees →