EV Charging Station Permit (State-Issued Electrical Permit) in Rigby, Idaho
Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within Rigby city limits. Rigby and Jefferson County do not locally administer electrical trade permits (the same finding this file's solar-pv-permit entry documents): the electrical-connection scope is permitted directly by the Idaho Division of Occupational and Professional Licenses (DOPL). Jefferson County publishes no dedicated 'EV Charger Help Information' document (unlike its Solar Array and Detached Accessory Building help sheets), so no separate structural building permit is expected for a standalone EVSE install unless it also involves a new structure or a service/panel upgrade, in which case the shared Jefferson County/City of Rigby Cityworks building-permit process applies to that scope.
Verified 2026-07-20 · Source
When you need this permit
- Electrical work must be performed by an Idaho-licensed electrical contractor (or the homeowner on their own primary residence, per Idaho Code Section 54-1016 exemptions), permitted through Idaho DOPL rather than the City of Rigby or Jefferson County
- Installation must comply with National Electrical Code Article 625 (Electric Vehicle Power Transfer System) as adopted by Idaho under IDAPA 24.39.10.250
- A dedicated branch circuit sized to the EVSE manufacturer's specifications is required; GFCI protection applies per NEC 625 where the EVSE is cord-and-plug connected
- If a panel/service upgrade or new structure is involved, that scope must be submitted through the Jefferson County Planning, Zoning & Building Permit & Application Portal (Cityworks), the same co-administration model used for Rigby's other building permits
- No dedicated EV/EVSE fee line item is published by DOPL, Jefferson County, or the City of Rigby — the statewide DOPL 'Other Installation' fee schedule under IDAPA 24.39.10, Rule 500 applies to the electrical scope
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Rough-In (if applicable)
Required only if new circuit wiring is enclosed before final; conduit runs, wire sizing, and grounding verified (DOPL electrical inspection)
- 2
Electrical Final
EVSE circuit breaker sizing, GFCI protection (where applicable), working clearances, and charger mounting verified against NEC Article 625 (DOPL electrical inspection)
See the full Rigby inspection guide — scheduling & re-inspection fees →
Tips
- Rigby and Jefferson County have no local electrical-permitting program — an EV charger's electrical scope is a STATE permit through DOPL, not a city or county permit, the same as this file's solar-pv-permit entry.
- A homeowner installing EVSE wiring on their own primary residence may use DOPL's Homeowner Electrical Permit Application instead of hiring a licensed contractor, subject to Idaho Code Section 54-1016. Contractor
- Unlike solar arrays and detached accessory buildings, Jefferson County has not published a dedicated 'EV Charger Help Information' document — if the project is a standalone EVSE circuit with no new structure, expect only the DOPL electrical permit, not a Cityworks building-permit submission.
- If the charger install requires a panel/service upgrade or accompanies a new structure, submit that scope through the shared Jefferson County/Rigby Cityworks building-permit portal.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rigby building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Rigby
EV Charging Station Permit (State-Issued Electrical Permit) in other cities
Compare ev charging station permit (state-issued electrical permit) fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Rigby project checklist
Describe your project once and get every permit, document, and fee it triggers in Rigby — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →