Change of Use / Certificate of Occupancy — Red Lodge, Montana · Requirements sheet
Verified 2026-07-22 · Source: https://www.cityofredlodge.net/com-dev/page/applications-and-petitions
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Certificate of Occupancy in Red Lodge, Montana
Red Lodge has no standalone 'Change of Use Permit' or separate Certificate of Occupancy application or fee schedule. A certificate-of-occupancy/final inspection is issued as part of the same City of Red Lodge Building Permit Application used for new construction, additions, and alterations (see this file's residential-building-permit entry), once the structure and the property it sits on comply with the City-adopted International Building Codes and the terms, procedures, and standards of the Zoning Regulations (Red Lodge Zoning Regulations §12.4.1.64, 'Building Permit and Certification of Occupancy,' Ord. 957, 5-10-2022). Where an existing building's use or occupancy classification is changing, the project is reviewed under the 2021 International Existing Building Code (IEBC), which the City adopts by resolution under Municipal Code §9-1-1(B) alongside the 2021 IBC/IRC, using the same Building Permit Application and the same DLI Building (B)-only certification scope documented throughout this file.
Verified 2026-07-22 · Source
When you need this permit
- No separate/standalone Change of Use application exists — the City's own 'Applications and Petitions' page (Planning & Zoning Division) lists only Use of City-Owned Land, Temporary Use Permit, and Sign Permits as standalone applications; a change of use or occupancy classification is processed as a Building Permit Application
- Per Zoning Regulations §12.4.1.64: 'No building permit shall be issued except in compliance with the terms, procedures and standards of these Zoning Regulations. A certificate-of-occupancy/final inspection shall not be issued for any structure except when said structure is compliant with the applicable section of the City-adopted International Building Codes; and both said structure or development and property it is on is in compliance with the terms, procedures and standards of these Zoning Regulations'
- Where an existing building's use or occupancy classification is changing, review is conducted against the 2021 International Existing Building Code (IEBC) as adopted by Municipal Code §9-1-1(B), applied by City Building Inspector Brian Hanna under Red Lodge's DLI Building-only certification
- The Building Permit Application's class-of-work and use-of-building fields must reflect the new use; subject to the Building Official's discretion, plans may need to be stamped/certified by a licensed design professional
- A City Business Registration is required before a permit is issued, consistent with all other Building Permit Application-based permit types in this file
- If the change of use also alters a building's fire-protection design requirements (e.g., a new occupancy classification needing different sprinkler or alarm coverage), a separate Red Lodge Fire Rescue Commercial Building Construction Permit may additionally be required — see this file's fire-sprinkler-alarm-permit entry
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
After the building or space is ready for the new use/occupancy; a certificate-of-occupancy may be issued upon request once compliance with both the City-adopted Building Codes and the Zoning Regulations is confirmed (RLZR §12.4.1.64)
See the full Red Lodge inspection guide — scheduling & re-inspection fees →
Tips
- Red Lodge does not have a distinct 'Change of Use Permit' or standalone Certificate of Occupancy application — a change of use or occupancy classification is handled through the same Building Permit Application used for new construction, additions, and alterations, reviewed under the 2021 IEBC for existing buildings.
- Confirm with Building Inspector Brian Hanna, (406) 446-1606 x8, whether your specific change of use requires structural/life-safety plan review, and whether it also triggers a separate Red Lodge Fire Rescue fire-protection design review.
- A certificate-of-occupancy/final inspection cannot be issued unless the structure AND the property comply with both the City-adopted Building Codes and the Zoning Regulations (RLZR §12.4.1.64) — zoning compliance (parking, setbacks, use classification) is checked alongside the building-code review, not just the structural work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Red Lodge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Red Lodge
Change of Use / Certificate of Occupancy in other cities
Compare change of use / certificate of occupancy fees across Montana →
Look up this fee in a different city →
Now live
Build your Red Lodge project checklist
Describe your project once and get every permit, document, and fee it triggers in Red Lodge — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →