EV Charging Station Permit (State-Issued Electrical Permit) in Red Lodge, Montana
Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within Red Lodge city limits. Because Red Lodge is DLI-certified for Building ONLY (not Electrical), the electrical-connection scope of an EV charger install is permitted directly by the Montana DLI Building Codes Bureau via its statewide Application for Residential Electrical Permit, the same mechanism the electrical-permit-state entry documents for other residential wiring work. No separate City building permit is required for a standalone EVSE circuit unless it also involves a new structure (e.g. carport) or triggers structural work, in which case the City's own certified Building Permit program applies to that scope.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit is filed with the Montana DLI Building Codes Bureau (statewide Application for Residential Electrical Permit), not the City of Red Lodge, since Red Lodge holds no Electrical certification
- If the project produces 90 or more volts of electricity, a licensed electrical contractor must do the work, UNLESS the homeowner is doing the work on their own private house
- A dedicated branch circuit sized to the EVSE manufacturer's specifications is required, consistent with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by Montana
- If the charger install requires a panel/service upgrade, that scope may fall under the service-size fee categories already documented in the electrical-permit-state entry rather than the addition/alteration category
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Montana DLI Building Codes Bureau, Application for Residential Electrical Permit — the research could not directly machine-parse the fee-schedule PDF (it renders as encoded binary rather than… Show full citationHide
Montana DLI Building Codes Bureau, Application for Residential Electrical Permit — the research could not directly machine-parse the fee-schedule PDF (it renders as encoded binary rather than extractable text), so this figure is drawn from an indexed search-result quotation of the official bsd.dli.mt.gov document rather than a direct read of the PDF text itself; treat as needing a direct confirmation call before relying on it for a specific project. An EV charger circuit is a natural fit for this 'additional circuit or piece of equipment' remodel/addition category, but DLI does not publish a dedicated EV/EVSE line item.Review timeline
Inspection process
- 1
Electrical Rough-In (if applicable)
Required only if new circuit wiring is enclosed before final; conduit runs, wire sizing, and grounding verified; 48 hours' notice required
- 2
Electrical Final
EVSE breaker sizing, working clearances, and charger mounting verified against NEC Article 625
See the full Red Lodge inspection guide — scheduling & re-inspection fees →
Tips
- Because Red Lodge is not certified for Electrical, an EV charger's electrical scope is a STATE Application for Residential Electrical Permit through the Montana DLI Building Codes Bureau, not a City permit — the same finding the electrical-permit-state and solar-pv-permit entries document.
- The DLI fee schedule's 'single family interior/exterior wire or rewire (remodel/addition) — 1 additional circuit or piece of equipment' category at $45 is the closest published fit for an EV charger circuit, though DLI does not publish a dedicated EV/EVSE line item — confirm directly with the Bureau, (406) 841-2056, before budgeting.
- If the charger install requires a panel or service upgrade rather than just an added circuit, the service-size fee tiers ($200 up to 200-amp, $380 for 201-400-amp) documented in the electrical-permit-state entry may apply instead.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Red Lodge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Red Lodge's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Red Lodge yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Red Lodge lands. Privacy.
Other permits in Red Lodge
EV Charging Station Permit (State-Issued Electrical Permit) in other cities
Compare ev charging station permit (state-issued electrical permit) fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Red Lodge project checklist
Describe your project once and get every permit, document, and fee it triggers in Red Lodge — in one checklist. Free, for any city and any number of projects.
Get started →