Skip to main content
PermitBase
New privately-owned residential construction only

Where Montana is building

Two datasets, side by side. Growth ranks come from the U.S. Census Bureau Building Permits Survey — new privately-owned residential construction only, not total permit volume. The fee column is each city’s own published residential building-permit fee, shown verbatim for reference: it is never ranked, averaged, or presented as comparable across cities (why not →).

Census activity data covers 43 of the 43 Montana jurisdictions PermitBase tracks.

Source: U.S. Census Bureau, Building Permits Survey (BPS) · data through 2026-08

Montana cities by building-permit growth

Ranked by trailing-12-month Census units. The fee column is reference only — see how to read this table.

#JurisdictionTrailing-12 unitsYoY growthResidential permit fee *
1Unincorporated Yellowstone Countycounty-wide totals999— county estimateCalculated based on project valuation (fee schedule not published inline on the application; contact Building Codes Bureau at (406) 841-2056 for the current valuation-based fee table)†Verifieddetails →
2Missoula County (Unincorporated)county-wide totals831— county estimate$26.00Verifieddetails →
3Kalispell625+85.5%$23.50Verifieddetails →
4Billings560— insufficient history$30.00Verifieddetails →
5Helena495— insufficient history$22.00Verifieddetails →
6Missoula357(11 mo)— insufficient history$36Verifieddetails →
7Great Falls148— insufficient history$62.61Verifieddetails →
8Whitefish141(10 mo)— insufficient historyBased on a percentage of the estimated project cost (valuation-based); a deposit is required at time of permit submittal†Verifieddetails →
9Butte-Silver Bowcounty-wide totals116— county estimate$75.00Verifieddetails →
10Columbia Falls65(10 mo)— insufficient historyCalculated at time of submission based on project valuation; the City's own application form does not print a standalone valuation-fee table (field left blank for Building Department completion). No dedicated Columbia Falls fee-schedule document was found published separately from the application form after exhaustive search of the City's DocumentCenter, site search, and Resolutions listings.†Verifieddetails →
11Belgrade60(7 mo)— insufficient historyValuation x 0.0036†Verifieddetails →
12Ronan33— below floor$35.00Verifieddetails →
13Red Lodge30— below floor—
14Manhattan12— below floor—
15Hamilton8(7 mo)— insufficient history—
16Polson5(2 mo)— insufficient history35% of the Building Permit Fee†Verifieddetails →
17Pondera County (Unincorporated)county-wide totals0— county estimate—
18Richland County (Unincorporated Areas and Towns, excluding Sidney)county-wide totals0— county estimate$23.50Verifieddetails →
19Toole County (Unincorporated)county-wide totals0— county estimate—
—Anaconda-Deer Lodgeno data reported— insufficient history$12.50Verifieddetails →
—Bozemanno data reported— insufficient history(Administrative Charges/Employee/Hour + Inspector's Hourly Pay Rate) x Table A factor (amount of inspection time per sq ft, by construction type and fire rating) x Building Square FootageVerifieddetails →
—Choteauno data reported— insufficient history—
—Colstripno data reported— insufficient history—
—Conradno data reported— insufficient history—
—Cut Bankno data reported— insufficient history$23.50Verifieddetails →
—Darbyno data reported— insufficient history$29.38Verifieddetails →
—City of Deer Lodgeno data reported— insufficient history$20Verifieddetails →
—East Helenano data reported— insufficient history—
—Forsythno data reported— insufficient history—
—Glasgowno data reported— insufficient history—
—Hardinno data reported— insufficient history—
—Havreno data reported— insufficient history$23.50Verifieddetails →
—Laurelno data reported— insufficient history$36.00details →
—Lewistownno data reported— insufficient history—
—Libbyno data reported— insufficient history$24Verifieddetails →
—Livingstonno data reported— insufficient history$23.50Verifieddetails →
—Miles Cityno data reported— insufficient historySet by a City of Miles City fee schedule adopted by council resolution under City Code § 5-4; the specific dollar-valuation table was not independently locatable as a standalone published document as of the last verification (see note)†Verifieddetails →
—Shelbyno data reported— insufficient history$23.50Verifieddetails →
—Sidneyno data reported— insufficient history$23.50Verifieddetails →
—Stevensvilleno data reported— insufficient history$35Verifieddetails →
—Townsendno data reported— insufficient history—
—Troyno data reported— insufficient history$24Verifieddetails →
—West Yellowstoneno data reported— insufficient history—

How to read this table

Rows are ranked only by Census building-activity units — the one figure that’s measured the same way in every city. The fee column is never ranked, averaged, or sorted, because permit fees aren’t measured the same way from city to city: some jurisdictions charge a flat fee, others price on a sliding scale tied to construction valuation, others per square foot, others as a percentage of the building permit fee. Averaging or sorting those numbers together would compare figures that don’t measure the same thing — a “cheapest city” ranking built on that mix would be a misleading metric, so we don’t build one.

A dagger (†) next to a fee means it’s the starting tier from a valuation-based or sliding-scale schedule per the jurisdiction’s own published fee table — not a final total for every project. Open the linked permit page for the complete schedule.

The growth percentage only appears when a jurisdiction’s trailing-12-month and prior-12-month windows were both fully reported to the Census Bureau, and the prior-year total was at least 50 units. Below that floor a percentage swings too wildly on a small base to be meaningful, so we withhold it rather than publish a misleading rate. County-level rows never get a growth rank, since county totals can include Census imputation for non-reporting offices.

Two provenance regimes are stacked on this page: Census activity figures are self-reported by jurisdictions to the Bureau on a monthly cadence, while permit fees are independently verified by PermitBase against each department’s own published schedule (see the confidence badge and source link on each fee). A jurisdiction shown as “no data reported” did not report to the Census Bureau for that period — that is never the same as zero activity.

Frequently asked questions

Why don't you rank cities by permit cost?
Permit fees aren't measured the same way from city to city — one jurisdiction charges a flat fee, another prices on a sliding scale tied to construction valuation, another per square foot, another as a percentage of the building permit fee. Sorting those numbers together and calling the smallest one "cheapest" would compare figures that don't measure the same thing, which is a misleading metric dressed up as a ranking. So this page ranks only what's genuinely comparable across cities — Census building-activity units — and shows each city's own published fee next to it, verbatim, for reference only.
What does the growth percentage measure?
Year-over-year change in trailing-12-month housing units authorized for new privately-owned residential construction, per the Census Bureau Building Permits Survey. It only appears when both the current and prior 12-month windows were fully reported and the prior-year total meets a minimum reporting floor — otherwise a percentage would be either impossible to compute or too volatile to be meaningful.
What does the dagger (†) next to a fee mean?
It marks a fee that's a starting tier from a valuation-based or sliding-scale schedule, not a flat final total. Open the city's permit page for the complete fee table.
Why do some cities show “no data reported” instead of a number?
That jurisdiction didn't report to the Census Bureau for that period. We show it as unreported, never as zero — assuming zero activity for a non-reporting jurisdiction would be inventing a data point that doesn't exist.

See full Montana building-activity detail →·Look up a specific Montana permit fee →

Get this as a monthly email

The Montana Growth & Permit Costs Report: one email a month when fresh Census data lands — fastest-growing Montana cities by trailing-12-month building activity, each paired with its own published residential permit fee. New privately-owned residential construction only.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.