Electrical Permit in Yerington, Nevada

Required for electrical installation, alteration, or repair work in Yerington, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Standalone electrical upgrades carry a dedicated inspection fee separate from the valuation-based building permit fee.

Verified 2026-07-03 · Source

When you need this permit

  • Electrical permit required for installation, alteration, or repair of wiring and electrical equipment, governed by the 2017 NEC as adopted by the City of Yerington
  • Apply via the universal Building Permit Application (PW106), checking the 'Electric' box under the For Office Use category block
  • Electrical Contractor section of the application (name, address, phone, NV Contractors License Number, Yerington Business License Number) must be completed; missing information will delay permit issuance Contractor
  • An Electrical Upgrade inspection carries its own dedicated $85.00 inspection fee, separate from the building permit/plan check fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Inspection Fee: Electrical Upgrade (City Code 9-1-2-C2)City of Yerington Fee Schedule (Revision #33, revised 05/26/2026), Building Department section
$85.00
Re-inspection Fee (City Code 9-1-2-C2)City of Yerington Fee Schedule (Revision #33, revised 05/26/2026), Building Department section
$85.00
Building Permit Fee (electrical work bundled into new construction/addition)City of Yerington Fee Schedule (Revision #33, revised 05/26/2026) — no separate stand-alone per-fixture/per-unit electrical fee table is published; electrical work performed as part of new construction or an addition is priced through the single valuation-based Building Permit Fee
Valuation-based; determined from the City's Building Valuation Data Sheets

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Yerington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and service connections verified before walls are closed

  2. 2

    Electrical Upgrade Inspection

    Dedicated $85.00 inspection for electrical service/panel upgrades, per City Code 9-1-2-C2

  3. 3

    Final

    Devices installed and panel verified per the adopted 2017 NEC

See the full Yerington inspection guide — scheduling & re-inspection fees →

Tips

  • No electrical-permit-specific review timeline is published by the City of Yerington beyond the general 'up to ten days' (residential) / 'up to ninety days' (commercial) language on the Building Permit Application. Confirm current turnaround directly with the Building Department at (775) 463-3511.
  • An Electrical Upgrade inspection and a Re-inspection are each billed at a flat $85.00 per the City's Fee Schedule — distinct line items from the project's overall valuation-based building permit fee.

Frequently asked questions

Yerington requires an electrical permit for: Electrical permit required for installation, alteration, or repair of wiring and electrical equipment, governed by the 2017 NEC as adopted by the City of Yerington; Apply via the universal Building Permit Application (PW106), checking the 'Electric' box under the For Office Use category block; Electrical Contractor section of the application (name, address, phone, NV Contractors License Number, Yerington Business License Number) must be completed; missing information will delay permit issuance; An Electrical Upgrade inspection carries its own dedicated $85.00 inspection fee, separate from the building permit/plan check fee. If your project isn't listed, confirm with City of Yerington Building and Planning Department at (775) 463-3511 before starting work.

The Inspection Fee for an Electrical Upgrade is a flat $85.00 per inspection, per City Code Section 9-1-2-C2. A Re-inspection Fee (if a first inspection fails) is also $85.00. Source: City of Yerington Fee Schedule (Revision #33, revised 05/26/2026).

Yerington does not publish a plan-review timeline for this permit. Contact City of Yerington Building and Planning Department at (775) 463-3511 for current turnaround.

You'll need: Building Permit Application (Electric). See the required-documents checklist on this page for details on each.

Yerington requires 3 inspection(s) for an electrical permit, in order: Rough-In, Electrical Upgrade Inspection, Final. Schedule each through City of Yerington Building and Planning Department ((775) 463-3511).

Apply through City of Yerington Building and Planning Department at 14 E. Goldfield Avenue, Yerington, NV 89447. Phone: (775) 463-3511, email: pauls@yerington.net. Office hours: Monday-Friday, 8:00 AM - 5:00 PM. Primary contact: Paul Shapiro, (775) 364-8895 or (775) 463-3511, pauls@yerington.net. Secondary contact: Steve Douglas, Building Inspector, (775) 634-7422, steved@yerington.net. Building Department fax: (775) 463-2284. A 24-hour advance notice is required to schedule inspections. Projects outside city limits fall under Lyon County Building Department, (775) 463-6591.. Official information: https://www.yerington.net/296/2343/Building-Department.

Yerington, Nevada has adopted: Nevada is a home-rule state for building codes: there is no single mandatory statewide building-code edition — each city and county adopts and amends its own code. The only genuine statewide floor is the energy code, referenced through NRS 701.220, which directs the State Office of Energy to adopt and update energy-efficiency standards for new construction. Always confirm the specific adopted edition for the jurisdiction in question rather than assuming a uniform statewide code. Source: Nevada Legislature NRS Chapter 701 (State Office of Energy).; International Building Code (IBC), 2018 Edition — adopted by the City of Yerington per Yerington City Code Title 1, Chapter 9. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025), cover sheet 'Building Codes Adopted by the City of Yerington.'; International Residential Code (IRC), 2018 Edition — adopted by the City of Yerington per Yerington City Code Title 1, Chapter 9. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; International Existing Building Code (IEBC), 2018 Edition — adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; International Energy Conservation Code (IECC), 2018 Edition — adopted by the City of Yerington (also satisfies the NRS 701.220 statewide energy floor). Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; Uniform Plumbing Code (UPC), 2018 Edition — adopted by the City of Yerington; Nevada jurisdictions commonly use the Uniform Plumbing Code rather than the International Plumbing Code. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; Uniform Mechanical Code (UMC), 2018 Edition — adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; National Electrical Code (NEC), 2017 Edition — adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; International Fire Code (IFC), 2012 Edition — adopted by the City of Yerington; commercial projects are additionally subject to review by the Mason Valley Fire District (775-463-2261), which requires its own separate application, plan submittal, and fee. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; 2018 Northern Nevada Amendments (Northern Nevada Chapter of the International Code Council / NNICC) — incorporated by reference into the codes adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; The City of Yerington is a member of the International Code Council. Code adoption is referenced to Yerington City Code Title 1, Chapter 9. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).. Local amendments apply — see the Yerington overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yerington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.