EV Charger / Electric Vehicle Charging Station Permit — Yerington, Nevada · Requirements sheet
Verified 2026-07-20 · Source: https://www.yerington.net/DocumentCenter/View/781/Coy-Building-Permit-App-V7-06-2025-Fill-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / Electric Vehicle Charging Station Permit in Yerington, Nevada
Yerington has no dedicated EV charger/EVSE permit category or fee line. Unlike solar, which the City's universal Building Permit Application (PW106) tracks as its own checkbox category ('SOLAR'), the application's category block has no separate 'EV' or 'ELECTRIC VEHICLE' checkbox — an EV charger installation is captured under the existing 'ELECTRIC' category, the same category used for any electrical work, and billed under the same GL 01-13-00-3117 valuation-based Building Permit/Plan Check fee mechanism (or the flat $85.00 Electrical Upgrade Inspection Fee under City Code 9-1-2-C2) documented in this file's electrical-permit entry. Confirmed via review of the City's Fee Schedule (Revision #33, revised 05/26/2026), which contains no line item for 'EV,' 'electric vehicle,' 'EVSE,' or 'charging station.' Re-verified 2026-07-20 via a direct live re-fetch of the same Revision #33 Fee Schedule PDF (unchanged, still current as of this review): 'Inspection Fee: Electrical Upgrade (9-1-2-C2) — $85.00 Each Inspection' and 'Re-inspection Fee (9-1-2-C2) — $85.00 Each Re-inspection' both confirmed live and unchanged.
Verified 2026-07-20 · Source
When you need this permit
- Apply via the City's universal Building Permit Application (PW106), checking the 'ELECTRIC' category under the For Office Use block (no separate EV-specific checkbox exists)
- Electrical work governed by the 2017 NEC as adopted by the City (Yerington City Code Title 1, Chapter 9); complete the Electrical Contractor section (NV Contractors License Number, Yerington Business License Number) Contractor
- A 24-hour advance notice is required to schedule inspections, per the Building Department's general inspection policy
- If the charger installation requires a panel/service upgrade, the $85.00 Electrical Upgrade Inspection Fee (City Code 9-1-2-C2) applies in addition to any base Building Permit Fee
- Confirm with the Building Department (775-463-3511) whether a standalone EV charger circuit addition is billed as a flat inspection fee or the full valuation-based Building Permit Fee before applying
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Conduit runs, wire sizing, disconnect placement, and panel work verified per the 2017 NEC as adopted; 24-hour advance notice required to schedule
See the full Yerington inspection guide — scheduling & re-inspection fees →
Tips
- Yerington's universal Building Permit Application (PW106) has no EV-specific checkbox — use the existing 'ELECTRIC' category, the same one used for any electrical work.
- If the installation only needs an inspection sign-off (e.g., a straightforward circuit addition with no separate valuation-based permit), the flat $85.00 Electrical Upgrade Inspection Fee may be the applicable charge rather than a full valuation-based Building Permit Fee — confirm which applies with the Building Department before budgeting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yerington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Yerington
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Nevada →
Look up this fee in a different city →