Skip to main content
PermitBase

EV Charger / Electric Vehicle Charging Station Permit in Yerington, Nevada

Yerington has no dedicated EV charger/EVSE permit category or fee line. Unlike solar, which the City's universal Building Permit Application (PW106) tracks as its own checkbox category ('SOLAR'), the application's category block has no separate 'EV' or 'ELECTRIC VEHICLE' checkbox — an EV charger installation is captured under the existing 'ELECTRIC' category, the same category used for any electrical work, and billed under the same GL 01-13-00-3117 valuation-based Building Permit/Plan Check fee mechanism (or the flat $85.00 Electrical Upgrade Inspection Fee under City Code 9-1-2-C2) documented in this file's electrical-permit entry. Confirmed via review of the City's Fee Schedule (Revision #33, revised 05/26/2026), which contains no line item for 'EV,' 'electric vehicle,' 'EVSE,' or 'charging station.' Re-verified 2026-07-20 via a direct live re-fetch of the same Revision #33 Fee Schedule PDF (unchanged, still current as of this review): 'Inspection Fee: Electrical Upgrade (9-1-2-C2) — $85.00 Each Inspection' and 'Re-inspection Fee (9-1-2-C2) — $85.00 Each Re-inspection' both confirmed live and unchanged.

Verified 2026-07-20 · Source

When you need this permit

  • Apply via the City's universal Building Permit Application (PW106), checking the 'ELECTRIC' category under the For Office Use block (no separate EV-specific checkbox exists)
  • Electrical work governed by the 2017 NEC as adopted by the City (Yerington City Code Title 1, Chapter 9); complete the Electrical Contractor section (NV Contractors License Number, Yerington Business License Number) Contractor
  • A 24-hour advance notice is required to schedule inspections, per the Building Department's general inspection policy
  • If the charger installation requires a panel/service upgrade, the $85.00 Electrical Upgrade Inspection Fee (City Code 9-1-2-C2) applies in addition to any base Building Permit Fee
  • Confirm with the Building Department (775-463-3511) whether a standalone EV charger circuit addition is billed as a flat inspection fee or the full valuation-based Building Permit Fee before applying

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Inspection Fee: Electrical Upgrade (City Code 9-1-2-C2)City of Yerington Fee Schedule (Revision #33, revised 05/26/2026), Building Department section — same flat fee documented in this file's electrical-permit and solar-pv-permit entries; no dedicated EV-specific line item exists
$85.00
Building Permit Fee (electrical work bundled into new construction/addition, valuation-based)City of Yerington Fee Schedule (Revision #33) — applies if the EV charger installation is billed under the general valuation-based mechanism rather than the flat Electrical Upgrade Inspection Fee
Determined from the City's Building Valuation Data Sheets (not published online — located at the Building and Planning Department)

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Yerington?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Conduit runs, wire sizing, disconnect placement, and panel work verified per the 2017 NEC as adopted; 24-hour advance notice required to schedule

See the full Yerington inspection guide — scheduling & re-inspection fees →

Tips

  • Yerington's universal Building Permit Application (PW106) has no EV-specific checkbox — use the existing 'ELECTRIC' category, the same one used for any electrical work.
  • If the installation only needs an inspection sign-off (e.g., a straightforward circuit addition with no separate valuation-based permit), the flat $85.00 Electrical Upgrade Inspection Fee may be the applicable charge rather than a full valuation-based Building Permit Fee — confirm which applies with the Building Department before budgeting.

Frequently asked questions

Yerington requires an ev charger / electric vehicle charging station permit for: Apply via the City's universal Building Permit Application (PW106), checking the 'ELECTRIC' category under the For Office Use block (no separate EV-specific checkbox exists); Electrical work governed by the 2017 NEC as adopted by the City (Yerington City Code Title 1, Chapter 9); complete the Electrical Contractor section (NV Contractors License Number, Yerington Business License Number); A 24-hour advance notice is required to schedule inspections, per the Building Department's general inspection policy; If the charger installation requires a panel/service upgrade, the $85.00 Electrical Upgrade Inspection Fee (City Code 9-1-2-C2) applies in addition to any base Building Permit Fee; Confirm with the Building Department (775-463-3511) whether a standalone EV charger circuit addition is billed as a flat inspection fee or the full valuation-based Building Permit Fee before applying. If your project isn't listed, confirm with City of Yerington Building and Planning Department at (775) 463-3511 before starting work.

In Yerington, the published Inspection Fee: Electrical Upgrade (City Code 9-1-2-C2) is: $85.00. Additional published fees: Building Permit Fee (electrical work bundled into new construction/addition, valuation-based) — Determined from the City's Building Valuation Data Sheets (not published online — located at the Building and Planning Department). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Yerington does not publish a plan-review timeline for this permit. Contact City of Yerington Building and Planning Department at (775) 463-3511 for current turnaround.

You'll need: Building Permit Application (PW106) — ELECTRIC category. See the required-documents checklist on this page for details on each.

Yerington requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Electrical Inspection. Schedule each through City of Yerington Building and Planning Department ((775) 463-3511).

Apply through City of Yerington Building and Planning Department at 14 E. Goldfield Avenue, Yerington, NV 89447. Phone: (775) 463-3511, email: pauls@yerington.net. Office hours: Monday-Friday, 8:00 AM - 5:00 PM. Primary contact: Paul Shapiro, (775) 364-8895 or (775) 463-3511, pauls@yerington.net. Secondary contact: Steve Douglas, Building Inspector, (775) 634-7422, steved@yerington.net. Building Department fax: (775) 463-2284. A 24-hour advance notice is required to schedule inspections. Projects outside city limits fall under Lyon County Building Department, (775) 463-6591.. Official information: https://www.yerington.net/296/2343/Building-Department.

Yerington, Nevada has adopted: Nevada is a home-rule state for building codes: there is no single mandatory statewide building-code edition — each city and county adopts and amends its own code. The only genuine statewide floor is the energy code, referenced through NRS 701.220, which directs the State Office of Energy to adopt and update energy-efficiency standards for new construction. Always confirm the specific adopted edition for the jurisdiction in question rather than assuming a uniform statewide code. Source: Nevada Legislature NRS Chapter 701 (State Office of Energy).; International Building Code (IBC), 2018 Edition — adopted by the City of Yerington per Yerington City Code Title 1, Chapter 9. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025), cover sheet 'Building Codes Adopted by the City of Yerington.'; International Residential Code (IRC), 2018 Edition — adopted by the City of Yerington per Yerington City Code Title 1, Chapter 9. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; International Existing Building Code (IEBC), 2018 Edition — adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; International Energy Conservation Code (IECC), 2018 Edition — adopted by the City of Yerington (also satisfies the NRS 701.220 statewide energy floor). Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; Uniform Plumbing Code (UPC), 2018 Edition — adopted by the City of Yerington; Nevada jurisdictions commonly use the Uniform Plumbing Code rather than the International Plumbing Code. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; Uniform Mechanical Code (UMC), 2018 Edition — adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; National Electrical Code (NEC), 2017 Edition — adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; International Fire Code (IFC), 2012 Edition — adopted by the City of Yerington; commercial projects are additionally subject to review by the Mason Valley Fire District (775-463-2261), which requires its own separate application, plan submittal, and fee. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; 2018 Northern Nevada Amendments (Northern Nevada Chapter of the International Code Council / NNICC) — incorporated by reference into the codes adopted by the City of Yerington. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).; The City of Yerington is a member of the International Code Council. Code adoption is referenced to Yerington City Code Title 1, Chapter 9. Source: City of Yerington Building Permit Application (PW106, Rev. 7, 06/2025).. Local amendments apply — see the Yerington overview page for the full list.

No. The City's Building Permit Application (PW106) has no EV-specific checkbox category, unlike solar which has its own 'SOLAR' box. An EV charger installation is captured under the existing 'ELECTRIC' category and billed under the same fee mechanism as other electrical work — either the flat $85.00 Electrical Upgrade Inspection Fee (City Code 9-1-2-C2) or the valuation-based Building Permit Fee, depending on scope.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yerington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.