Solar Photovoltaic (PV) Permit in Yerington, Nevada
Required for installation of rooftop or ground-mounted solar photovoltaic systems in Yerington. The City's own universal Building Permit Application (PW106) includes a dedicated 'SOLAR' checkbox as its own recognized project category (alongside New, Addition, Re-Roof, Electric, etc.), confirming the City treats solar as a distinct permit type. However, solar is billed through the same general ledger account (01-13-00-3117, 'Building Permit Fee') and the same valuation-based Building Permit Fee / Plan Check Fee used for other construction — the City's Fee Schedule contains no separate dollar-figure line item specific to solar.
Verified 2026-07-20 · Source
When you need this permit
- Building permit required for the structural/racking portion, applied for via the universal Building Permit Application (PW106) by checking the 'SOLAR' box under the For Office Use category block
- Governed by the 2018 IBC (commercial) / 2018 IRC (residential) as adopted by the City, per the application's own code-edition header
- Electrical work (wiring/interconnection) governed by the 2017 NEC as adopted by the City — apply via the same universal application, additionally checking 'ELECTRIC' if not already covered by the SOLAR category, and completing the Electrical Contractor section (NV Contractors License Number, Yerington Business License Number) Contractor
- A 24-hour advance notice is required to schedule inspections, per the Building Department's general inspection policy
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover, per the 2017 NEC as adopted; 24-hour advance notice required to schedule
- 2
Final
Racking, roof/ground-mount attachment, and electrical connections verified
See the full Yerington inspection guide — scheduling & re-inspection fees →
Tips
- Yerington's own Building Permit Application (PW106) has a dedicated 'SOLAR' checkbox distinct from 'ELECTRIC,' 'RE-ROOF,' and other categories — confirming the City tracks solar installations as their own project type, even though the fee itself is calculated under the same general ledger account (01-13-00-3117) and valuation-based Building Permit Fee as any other construction.
- The City's actual Building Valuation Data Sheets (used to calculate the dollar amount owed) are not published online — they are located only at the Building and Planning Department; call (775) 463-3511 or (775) 364-8895 for a current valuation-based estimate before applying.
- Projects outside Yerington city limits fall under the separate Lyon County Building Department, (775) 463-6591 — confirm which jurisdiction applies before submitting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yerington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Yerington
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Nevada →
Look up this fee in a different city →
Now live
Build your Yerington project checklist
Describe your project once and get every permit, document, and fee it triggers in Yerington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →