Commercial Tenant Improvement (TI) Permit — Yerington, Nevada · Requirements sheet
Verified 2026-08-01 · Source: https://www.yerington.net/296/2343/Building-Department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement (TI) Permit in Yerington, Nevada
Required for interior build-outs and improvements of commercial tenant spaces within Yerington city limits. 'TI' is its own checkbox category in the For Office Use block of the City's universal Building Permit Application (PW106) — listed alongside New, Repair, Demo, Addition, and the other project types — so the City formally recognizes and tracks tenant improvements as a distinct project category, the same way it does SOLAR and SIGN. However, TI is NOT a separately administered permit: there is no TI-specific application form, fee table, or published timeline. A commercial TI runs through the identical five-step commercial track as new commercial construction — licensed contractor only (no owner-builder for commercial or rental work), Tax Verification, valuation-based fees from the same Building Valuation Data Sheets (GL 01-13-00-3117), mandatory Mason Valley Fire District review before issuance, and the same published up-to-ninety-days commercial plan-review window. Governed by the 2018 International Existing Building Code and 2018 IBC as adopted (Yerington City Code Title 1, Chapter 9). If the improvement changes the space's occupancy classification, see this file's certificate-of-occupancy-permit entry — the City has no separate change-of-use application either.
Verified 2026-08-01 · Source
When you need this permit
- Apply via the universal Building Permit Application (PW106), with 'TI' checked under the For Office Use category block
- All commercial work must be completed by a licensed contractor holding a Nevada State Contractors Board license and a current City of Yerington business license — the owner-builder exemption is residential-only, and rental property work must also be completed by a licensed contractor per the application's cover sheet Owner-builderContractor
- All commercial work is subject to review by the Mason Valley Fire District (775-463-2261) — a separate application, plan submittal, and fee, signed off before the City can issue the permit (Commercial Step 4, PW106); tenant build-outs affecting exits, occupancy, or fire systems should expect this review
- Tax Verification form signed by the Lyon County Clerk's Office (27 South Main Street) required before issuance; permits cannot be issued if Lyon County property taxes are delinquent
- Two sets of identical plans on 11x17-inch tabloid paper; plans must be stamped by a Nevada-licensed engineer or architect where required (out-of-state-only stamps not accepted); governed by the 2018 IEBC/IBC and 2018 Northern Nevada Amendments
- Fees are calculated from the valuation of the entire project (all material, labor, engineering, and other services) or the contractor's bid amount; a permit cannot be issued until all fees are paid
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough inspections (framing, electrical, plumbing, mechanical as applicable)
The Building Department inspects structural elements, plumbing, heating/cooling, and electrical systems per its department page; 24-hour advance notice required for each inspection, stamped plans kept on site
- 2
Permit Final
Project is not complete until the Permit Final is signed by a City Building Official; a Certificate of Occupancy is then issued as required — critical for a tenant space before occupancy
See the full Yerington inspection guide — scheduling & re-inspection fees →
Tips
- TI is a formally recognized checkbox category on Yerington's application but not a separately administered permit — same form, same valuation-based fee mechanism, same commercial review track as new commercial construction. Budget against the commercial (up to 90 days in some cases) window, not the 10-day residential one.
- A tenant cannot self-perform the build-out: the owner-builder exemption is limited to residential structures for the owner's own occupancy, and both commercial and rental-property work must be completed by a licensed contractor per the City's own application cover sheet. Owner-builderContractor
- Restaurant or plumbing-heavy build-outs can trigger substantial published sewer charges — the Commercial and Industrial Sewer Connection Fee is $3,800 for the first 25 Sewer Fixture Units plus $195 per additional SFU (UPC Table 7.3) — on top of the unpublished valuation-based permit fee.
- If the TI changes the space's use or occupancy classification, note that Yerington has no separate change-of-use application or fee — the CO is issued off the TI permit's own Permit Final; see this file's certificate-of-occupancy-permit entry.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yerington building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Yerington.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Yerington
Commercial Tenant Improvement (TI) Permit in other cities
Compare commercial tenant improvement (ti) permit fees across Nevada →
Look up this fee in a different city →
Now live
Build your Yerington project checklist
Describe your project once and get every permit, document, and fee it triggers in Yerington — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →