EV Charger / EVSE Permit (State CID Electrical) — Roswell, New Mexico · Requirements sheet
Verified 2026-07-20 · Source: https://www.roswell-nm.gov/DocumentCenter/View/27546/City-of-Roswell---CID-Electrical-conversion-permit
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit (State CID Electrical) in Roswell, New Mexico
Installing a Level 2 (240V) or other electric vehicle charging station within Roswell city limits requires an electrical permit — as of January 1, 2026 (until further notice), the New Mexico Construction Industries Division (CID), not the City of Roswell, handles all electrical permitting, plan review, and inspections in Roswell. The CID Electrical Permit Application's residential 'Alteration/Renovation/Repair/Replace to Existing Electrical System or Equipment' scope-of-work section has a 'Lighting/Power' checkbox used for adding a dedicated EV charger circuit; there is no EV-charger-specific line item on CID's fee schedule.
Verified 2026-07-20 · Source
When you need this permit
- State of New Mexico CID Electrical Permit Application filed with CID (Santa Fe, Albuquerque, or Las Cruces office, or online), since CID — not the City — currently administers all electrical permitting in Roswell
- Check 'Residential' application type and, under 'Alteration/Renovation/Repair/Replace to Existing Electrical System or Equipment,' check 'Lighting/Power' for a new EV charger circuit added to an existing dwelling's electrical system
- If the charger install also requires a service or panel upgrade to support the added load, check 'Service Upgrade' instead of/in addition to 'Lighting/Power,' which is billed per the amperage-based Residential Service AMP/Panel fee table
- Only appropriately, validly, and currently CID-licensed electrical contractors (or an eligible homeowner under 14.5.2.18 NMAC) may apply for or be issued the permit
- All permits carry a minimum inspection fee of $27.00 regardless of scope
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Roswell inspection guide — scheduling & re-inspection fees →
Tips
- There is no EV-charger-specific permit or fee line — a home Level 2 charger circuit is filed as a standard CID residential electrical alteration permit ('Lighting/Power' scope), carrying at minimum the $27.00 inspection fee, plus the amperage-based service fee if a panel/service upgrade is also needed.
- As of January 1, 2026, electrical permits for any Roswell address are issued by the STATE Construction Industries Division, not the city — apply online or at the Santa Fe, Albuquerque, or Las Cruces CID office; check the City of Roswell Building Inspections page for the latest status of this (described as temporary) arrangement before assuming it is still in effect.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roswell building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Roswell
EV Charger / EVSE Permit (State CID Electrical) in other cities
Compare ev charger / evse permit (state cid electrical) fees across New Mexico →
Look up this fee in a different city →