Solar PV Permit (City Building Permit + State CID Electrical) in Roswell, New Mexico
Required for installation of rooftop or ground-mounted solar photovoltaic systems within Roswell city limits. The structural/roof-mounting scope is processed as a standard City of Roswell Building Permit, valuation-based per the City's Building Fee Schedule. The electrical-connection scope is NOT issued by the City — as of January 1, 2026 (until further notice), the New Mexico Construction Industries Division (CID) handles all electrical permitting, plan review, and inspection in Roswell, and 'Solar' is an explicit checkbox scope of work on the CID electrical permit application (residential and commercial). A separate small plumbing-side fee applies if the installation includes a solar thermal (water-heating) component.
Verified 2026-07-19 · Source
When you need this permit
- Structural/roof-mounting scope: submit a City of Roswell Building Permit Application (email to permits@roswell-nm.gov or via CloudPermit), reviewed against the New Mexico Residential/Commercial Building Code (2021 IRC/IBC base) as the City's Building & Inspections Division enforces as the local AHJ under NMAC 14.5.2
- Site plan (with setbacks and drainage plan) and, where roof-mounted, structural adequacy documentation per 14.5.2.10 NMAC submittal requirements
- Electrical-connection scope: apply through the New Mexico Construction Industries Division (CID), not the City — check 'Solar' as the scope of work on the CID Electrical Permit Application (residential or commercial)
- Only appropriately, validly, and currently CID-licensed persons (or an eligible homeowner under 14.5.2.18 NMAC) may apply for or be issued the electrical permit
- If the installation includes a solar thermal (water-heating) component, a separate Plumbing/Mechanical Permit line item applies for that plumbing connection ('Solar System (each)')
- Persons who are not appropriately, validly, and currently licensed by CID are not eligible to apply for or be issued a building permit either, except under the homeowner's permit provision
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Structural / Roof-Mount (City)
Verifies racking/mounting attachment and roof penetrations against approved plans
- 2
Electrical Rough-In / Final (NM CID)
Scheduled directly with CID, not the City — CID's general inspection scheduling line is (505) 222-9813 or 1-877-243-0979, or cid.inspection@rld.nm.gov
See the full Roswell inspection guide — scheduling & re-inspection fees →
Tips
- As of January 1, 2026, the electrical-connection scope of any solar installation in Roswell is a STATE (CID) permit, not a City permit — 'Solar' is an explicit checkbox scope of work on the CID Electrical Permit Application, distinct from the general new-service amperage tiers.
- The structural/roof-mounting scope still goes through the normal City of Roswell Building Permit process and its general valuation-based fee table — there is no dedicated solar line item on the City's own Building Fee Schedule.
- If your installation includes a solar water heater (thermal) as well as PV panels, budget the separate $5.00 'Solar System' plumbing fee on top of the City building permit and CID electrical permit.
- This CID takeover of Roswell's electrical permitting is stated as a temporary, 'until further notice' arrangement (per a CID notice dated December 30, 2025) — verify current status on the City of Roswell Building Inspections page before applying, since it could revert to City administration.
- Paul Cordova, (505) 670-2025, Paul.Cordova@rld.nm.gov, is the primary CID electrical inspector currently covering the Roswell area.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roswell building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Roswell
Solar PV Permit (City Building Permit + State CID Electrical) in other cities
Compare solar pv permit (city building permit + state cid electrical) fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Roswell project checklist
Describe your project once and get every permit, document, and fee it triggers in Roswell — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →