Sign Permit in Hobbs, New Mexico
Required for most permanent signs erected on private property in Hobbs. Governed by City of Hobbs Municode Chapter 15.32 (Signs), which was amended in its entirety by City Ordinance in 2016. The sign permit fee is cross-referenced by Municode Section 15.32.150 to the fee schedule at Section 15.28.050, 'as established by the City.'
Reviewed 2026-07-22 · Source
When you need this permit
- Application for a sign permit must be made in writing on forms furnished by the Building Official, stating the sign's street address location and the names/addresses of the premises owner, the permittee, and the sign contractor (Municode 15.32.020)
- A plot plan must be furnished showing the sign and structure's location relative to property boundary lines, improvements, easements, curb lines, and rights-of-way (Municode 15.32.020)
- Two sets of plans and/or specifications must be submitted with the application, indicating size, height, material used, method of attachment or support, and location; one copy is returned to the applicant when the permit is granted (Municode 15.32.050(A))
- Plans for a freestanding sign exceeding 24 feet in height or with a sign face exceeding 128 square feet, or for any billboard, must be accompanied by a structural computation certified by a New Mexico licensed architect or engineer (Municode 15.32.050(B))
- A sign permit becomes null and void unless construction of the sign and structure is completed within 180 days of issuance, or the permit is renewed for an additional 180 days upon payment of one-half of the original fee (Municode 15.32.020)
- Each commercially developed site may have no more than one free-standing sign (one additional per 300 feet of additional street frontage beyond 300 feet); no free-standing sign may exceed 35 feet in height or 144 square feet, and wall signs may not exceed 144 square feet per leased-space facade (Municode 15.32.030(C))
- Signs on private property fronting a minor residential roadway within a residential area may not exceed 15 feet in height or 48 square feet (Municode 15.32.030(C)(4))
- Billboards are permitted only on private property fronting a Major Arterial per the City of Hobbs Major Thoroughfare Plan, limited to one per site (with distance/frontage exceptions), maximum 35 feet in height or 300 square feet, and must be constructed of metal (Municode 15.32.030(D))
- Electronic/changeable-copy signs must display a static message for a minimum of 8 seconds (2 seconds for message boards) and may not use animated transitions (Municode 15.32.130)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sign Construction / Final Approval
The Building Official determines, prior to final approval, that the sign as erected, constructed, or structurally altered is safe for the area in which it is placed (Municode 15.32.040)
See the full Hobbs inspection guide — scheduling & re-inspection fees →
Tips
- Signs under 4 square feet, signs erected by governmental entities/public schools/utility companies, and certain temporary signs (political, construction, real estate signs, and banners displayed 60 days or less) are exempt from the sign permit requirement under Municode Section 15.32.070.
- A sign permit expires if construction is not completed within 180 days of issuance; it can be renewed once for an additional 180 days by paying half the original fee (Municode 15.32.020).
- If your sign is illuminated and needs an electrical hookup, budget for a separate Electrical Permit 'Sign Connection' fee ($31.00, Municode 15.28.090) in addition to the sign permit itself.
- If your sign is damaged, blown down, or otherwise destroyed, it cannot be re-erected, reconstructed, or rebuilt without first obtaining a new permit (Municode 15.32.140).
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hobbs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hobbs
Sign Permit in other cities
Compare sign permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Hobbs project checklist
Describe your project once and get every permit, document, and fee it triggers in Hobbs — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →